Company Information

CIN
Status
Date of Incorporation
27 April 1995
State / ROC
Pune / ROC Pune
Last Balance Sheet
31 March 2023
Last Annual Meeting
30 September 2023
Paid Up Capital
5,000,000
Authorised Capital
5,000,000

Directors

Rashmi Jagdish Chheda
Rashmi Jagdish Chheda
Director
over 2 years ago
Vijay Jagdish Chheda
Vijay Jagdish Chheda
Managing Director
over 30 years ago

Past Directors

Naresh Bhavanji Shah
Naresh Bhavanji Shah
Director
about 7 years ago

Patents

A Compressed Assembly Of Battery Pack

An assembly of a battery pack (100) comprises of plurality of the battery modules (102) stacked together with the bottom support plate (116) and convex top pressure plate (114), all held together by at least four tie rods (110) on the four corners. The tie rods (110) have self-locking tie rod heads (112) at one end ...

A Cost Effective Compact Temperature Sensor

A cost-effective compact temperature sensor (100) comprises of temperature sensor module (102) with NTC thermistor leads (116) and temperature sensor bulb (118), an outer brass body (104). The hexagonal part (106) and an integrated coupler (108); made of plastic outer body (110).The leads of the NTC thermistor (116)...

A Metallic Starter Relay For Motor Vehicles

A metallic starter relay (1) for motor vehicles comprising of metallic cup (2), stop plate (3), bottom plate (4), bobbin (5), harness (6) with coupler, coil (7), MS plate (8), plunger (9), plunger spring (10), two fixed contacts (11), one unfixed contact (12), contact spring (13), head cover (14), two small O-rings...

"An Improved Temperature Sensing Assembly With Button And Partition Assembly"

An improved temperature sensing assembly comprises of a temperature sensor module (102), a silicon varnished sleeve (104) and a coupler (106), brass outer body (108), an insert moulded part(110) and a sleeve moulded part (126), with NTC thermistor(113) arranged with the temperature sensor bulb (114). The NTC leads(1...

Improved Magneto Rotor Assembly And Process Of Manufacturing Thereof

An improved Magneto Rotor assembly (100) and the process of manufacturing thereof is described. The assembly comprises of taper bush/hub (102), inner cup ring (104) with a flat surface and the outer PIP ring (106). The PIP ring (106) has windows (108) and the columns formed between the adjacent windows (108) on the ...

A Plunger Type Side Stand Switch Assembly With A Plastic Part.

A plunger type side stand switch assembly (100) comprises of a stainless steel plunger (102), two bushes(104,108) for tight fixing, a shunt metal part (110), a plastic part (112), a spring (114), PCB assembly (118) and a magnet (122) covered in a housing (116) with two holes for mounting bushes (124). The PCB asse...

A Plunger Type Side Stand Switch Assembly For Two Wheelers

A plunger type side stand switch assembly (100) comprises of a stainless steel plunger (102), two bushes(104,108) for tight fixing, a shunt metal part (110), a spring (114), PCB assembly (118) and a magnet (122) covered in a housing (116) with two holes for mounting bushes (124). The PCB assembly (118) has an Inte...

A Compact Rotary Type Side Stand Switch Assembly For Two Wheelers

A compact rotary type side stand switch assembly is described that comprises of an upper housing (116) with a magnet (110) and a PCB assembly (108); a shunt plate (106) integrated in a lower housing (104) and a metal bush (102). The PCB assembly (108) has an Integrated circuit with a Hall sensor and the PCB assembly...

Lamination Pack For Magneto Stator Assembly And Ev Motor Armature Assembly And Process Of Manufacturing Thereof

A lamination pack (100) or a core assembly for a magneto Stator assembly and EV motor armature assembly is manufactured using steel sheet as raw material (102). Stamping process is done to obtain individual lamination sheets (104) and the laminations are split into 9 parts. These are stacked together and pressed wit...

An Improved Horn Assembly With Consistent Sound Quality

An improved horn assembly with consistent sound quality is described. The housing assembly of horn comprises of the center core (104), lower finger (108), upper finger (110), a bobbin (112), vehicle harness connecting terminals (128). The center core has one side gripping at its bottom part and a top collar (130) at...

A Compact Rotary Type Side Stand Switch Assembly For Two Wheelers

A compact rotary type side stand switch assembly is described that comprises of an upper housing (116) with a magnet (110);; a shunt plate (106); lower housing (102) with a PCB assembly (108).The PCB assembly (108) has an Integrated circuit with a Hall sensor and the PCB assembly (108) and magnet (110) are fixed by ...

A Vehicle Blinker Device

A vehicle blinker device (101) that is cost effective, flexible and sustains breakage to an extent, comprises of a lens (102), reflector (104) and a housing (122). The housing (122) of the vehicle blinker device (101) comprises of a vehicle side insert (118) and a rubber stay (120) and the housing side insert mould...

Side Stand Sensor Product For A Two Wheeler Vehicle

A side stand sensor product for a two wheeler vehicle consists of two wire hall sensor (112), magnet (202), LED indicator (104), input wire (108), output wire (110), internal resistor R1 (116) and internal resistor R2 (118). It has an external resistor (120) added to the circuit arrangement across the LED indicator ...

An Electronic Throttle Device With Ratchet Locking Feature

The invention describes an electronic throttle device (100) for an electric vehicle that comprises plastic handle tube (102), spring (108), sensor housing (104), magnet (110), sensor PCB slot (106) and PVC grip (124). The ratchet lock (112) locks the handle tube (102) with the sensor housing (104) and the ratchet lo...

Registered Trademarks

Powercap (Label) Chheda Electricals And Electronics

[Class : 9] Electrial Apparatus And Instruments (Including Wireless), Capacitors, Electrical Wires, And Cables And Wiring Accessories, Electric Fixtures, Switches, Switch Gear & Parts Thereof; Electronic Instruments And Apparatus.

Charges

134 Crore
24 July 2019
The Hongkong And Shanghai Banking Corporation Limited
1 Crore
19 March 2019
The Hongkong And Shanghai Banking Corporation Limited
15 Crore
15 March 2018
Bajaj Finance Limited
5 Crore
14 August 2017
Hdfc Bank Limited
13 Crore
16 December 2015
Hdfc Bank Limited
44 Crore
23 January 2012
Janaseva Sahakari Bank Limited Pune
15 Crore
24 May 2008
Hdfc Bank Limited
8 Crore
13 August 2005
Hdfc Bank Limited
8 Crore
28 July 2003
Hdfc Bank Ltd.
1 Crore
20 March 2001
Syndicate Bank
1 Crore
25 January 2001
Syndicate Bank
95 Lak
25 January 2001
Syndicate Bank
95 Lak
30 March 2000
Syndicate Bank
15 Lak
10 December 1999
Syndicate Bank
1 Crore
28 May 1999
Syndicate Bank
15 Lak
04 October 2012
Kotak Mahindra Bank Limited
33 Crore
18 December 2020
The Hongkong And Shanghai Banking Corporation Limited
1 Crore
28 October 2020
Hdfc Bank Limited
2 Crore
27 October 2020
Citi Bank N.a.
15 Crore
14 August 2017
Hdfc Bank Limited
0
15 March 2018
Others
0
19 March 2019
The Hongkong And Shanghai Banking Corporation Limited
0
24 July 2019
The Hongkong And Shanghai Banking Corporation Limited
0
28 October 2020
Hdfc Bank Limited
0
27 October 2020
Citi Bank N.a.
0
18 December 2020
The Hongkong And Shanghai Banking Corporation Limited
0
25 January 2001
Syndicate Bank
0
28 May 1999
Syndicate Bank
0
28 July 2003
Hdfc Bank Ltd.
0
25 January 2001
Syndicate Bank
0
30 March 2000
Syndicate Bank
0
16 December 2015
Hdfc Bank Limited
0
10 December 1999
Syndicate Bank
0
20 March 2001
Syndicate Bank
0
13 August 2005
Hdfc Bank Limited
0
04 October 2012
Kotak Mahindra Bank Limited
0
23 January 2012
Janaseva Sahakari Bank Limited Pune
0
24 May 2008
Hdfc Bank Limited
0
14 August 2017
Hdfc Bank Limited
0
15 March 2018
Others
0
19 March 2019
The Hongkong And Shanghai Banking Corporation Limited
0
24 July 2019
The Hongkong And Shanghai Banking Corporation Limited
0
28 October 2020
Hdfc Bank Limited
0
27 October 2020
Citi Bank N.a.
0
18 December 2020
The Hongkong And Shanghai Banking Corporation Limited
0
25 January 2001
Syndicate Bank
0
28 May 1999
Syndicate Bank
0
28 July 2003
Hdfc Bank Ltd.
0
25 January 2001
Syndicate Bank
0
30 March 2000
Syndicate Bank
0
16 December 2015
Hdfc Bank Limited
0
10 December 1999
Syndicate Bank
0
20 March 2001
Syndicate Bank
0
13 August 2005
Hdfc Bank Limited
0
04 October 2012
Kotak Mahindra Bank Limited
0
23 January 2012
Janaseva Sahakari Bank Limited Pune
0
24 May 2008
Hdfc Bank Limited
0

Documents

Form CHG-1-20112020_signed
Instrument(s) of creation or modification of charge;-19112020
Optional Attachment-(1)-19112020
CERTIFICATE OF REGISTRATION OF CHARGE-20201119
Optional Attachment-(1)-10092020
Instrument(s) of creation or modification of charge;-10092020
Form CHG-1-10092020_signed
CERTIFICATE OF REGISTRATION FOR MODIFICATION OF CHARGE-20200910
Form DIR-12-23012020_signed
Evidence of cessation;-23012020
Notice of resignation;-23012020
Form ADT-1-12122019_signed
Form AOC-4(XBRL)-07122019_signed
Form MGT-7-07122019_signed
Optional Attachment-(1)-05122019
Copy of MGT-8-05122019
List of share holders, debenture holders;-05122019
Copy of resolution passed by the company-03122019
Copy of the intimation sent by company-03122019
Copy of written consent given by auditor-03122019
Optional Attachment-(1)-03122019
Optional Attachment-(2)-03122019
XBRL financial statements duly authenticated as per section 134 (including Board's report,auditor's report and other documents)-03122019
Optional Attachment-(3)-03122019
Form CHG-1-13112019_signed
Instrument(s) of creation or modification of charge;-13112019
CERTIFICATE OF REGISTRATION OF CHARGE-20191113
Form DPT-3-06072019-signed
Form DPT-3-27062019-signed
Optional Attachment-(1)-25062019