Sign In to Follow Application
View All Documents & Correspondence

Inverter Agnostic Battery Management System

Abstract: A Battery Management System (BMS) for regulating current between a battery and a load is described. The BMS comprises a pre-charging circuit 100 forming an electrical connection between the battery and the load, and configured to pre-charge a capacitor. The capacitor is electrically connected to the pre-charging circuit 100 and the load with an inverter. The pre- charging circuit 100 comprises a pre-charge resistor 102 for limiting inrush current, and an auxiliary resistor 104 connected in parallel to the pre-charge resistor 102 for supplementing the pre-charge resistor 102 in limiting the inrush current. The auxiliary resistor 104 is replaceable. Fig. 1 is the representative figure

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
15 September 2023
Publication Number
12/2025
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
Parent Application

Applicants

Luminous Power Technologies Pvt. Ltd.
Plot No. 150, Sector 44, Gurugram, Haryana – 122003, India

Inventors

1. D’Almeida, Nitin
1222, Madonna Manor, 5th Cross 11th Block, Lal Bahadur Shastri Naar, Anajanapura, Further Extension Royal Country Park, 8th Phase JP Nagar Bengaluru, Karnataka- 560083, India
2. Moorthi, Ganesh
D-43, Ressel Street, D Block, Rosewood City, Sector 50, Gurugram, Haryana – 122018, India
3. Rawat, Uday Singh
House no. 26, E C Road, Near Survey Chowk, Dehradun, GP, Uttarakhand- 248001, India

Specification

DESC:ENCLOSED ,CLAIMS:ENCLOSED

Documents

Application Documents

# Name Date
1 202311062328-STATEMENT OF UNDERTAKING (FORM 3) [15-09-2023(online)].pdf 2023-09-15
2 202311062328-PROVISIONAL SPECIFICATION [15-09-2023(online)].pdf 2023-09-15
3 202311062328-FORM 1 [15-09-2023(online)].pdf 2023-09-15
4 202311062328-DRAWINGS [15-09-2023(online)].pdf 2023-09-15
5 202311062328-DECLARATION OF INVENTORSHIP (FORM 5) [15-09-2023(online)].pdf 2023-09-15
6 202311062328-Proof of Right [28-09-2023(online)].pdf 2023-09-28
7 202311062328-FORM-26 [28-09-2023(online)].pdf 2023-09-28
8 202311062328-FORM 18 [03-09-2024(online)].pdf 2024-09-03
9 202311062328-DRAWING [03-09-2024(online)].pdf 2024-09-03
10 202311062328-COMPLETE SPECIFICATION [03-09-2024(online)].pdf 2024-09-03