Abstract: This method is for maintaining a boiler facility including a boiler having no scaffold installed inside a furnace thereof, the method comprising: a sample acquisition step for cutting a part of a furnace wall pipe constituting a furnace wall of the boiler to acquire a sample pipe within a first stop period which is a stop period of the boiler; an assessment step for assessing the state of the sample pipe; and a maintenance plan generation step for generating a maintenance plan for the furnace wall on the basis of the result of assessing the state of the sample pipe.
| # | Name | Date |
|---|---|---|
| 1 | 202317079137-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [21-11-2023(online)].pdf | 2023-11-21 |
| 2 | 202317079137-STATEMENT OF UNDERTAKING (FORM 3) [21-11-2023(online)].pdf | 2023-11-21 |
| 3 | 202317079137-REQUEST FOR EXAMINATION (FORM-18) [21-11-2023(online)].pdf | 2023-11-21 |
| 4 | 202317079137-POWER OF AUTHORITY [21-11-2023(online)].pdf | 2023-11-21 |
| 5 | 202317079137-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105-PCT Pamphlet) [21-11-2023(online)].pdf | 2023-11-21 |
| 6 | 202317079137-FORM 18 [21-11-2023(online)].pdf | 2023-11-21 |
| 7 | 202317079137-FORM 1 [21-11-2023(online)].pdf | 2023-11-21 |
| 8 | 202317079137-DRAWINGS [21-11-2023(online)].pdf | 2023-11-21 |
| 9 | 202317079137-DECLARATION OF INVENTORSHIP (FORM 5) [21-11-2023(online)].pdf | 2023-11-21 |
| 10 | 202317079137-COMPLETE SPECIFICATION [21-11-2023(online)].pdf | 2023-11-21 |
| 11 | 202317079137-Proof of Right [27-11-2023(online)].pdf | 2023-11-27 |
| 12 | 202317079137-FORM 3 [16-12-2023(online)].pdf | 2023-12-16 |
| 13 | 202317079137-MARKED COPIES OF AMENDEMENTS [01-01-2024(online)].pdf | 2024-01-01 |
| 14 | 202317079137-FORM 13 [01-01-2024(online)].pdf | 2024-01-01 |
| 15 | 202317079137-AMMENDED DOCUMENTS [01-01-2024(online)].pdf | 2024-01-01 |
| 16 | 202317079137-Correspondence-240124.pdf | 2024-02-12 |
| 17 | 202317079137-Others-240124.pdf | 2024-02-23 |