Sign In to Follow Application
View All Documents & Correspondence

An Automatic System To Dump Third Pump Flow To Tank In A 4 Gear Pump System

Abstract: AN AUTOMATIC SYSTEM TO DUMP THIRD PUMP FLOW TO TANK IN A 4-GEAR PUMP SYSTEM An automatic system (100) is designed for managing the flow of a four-gear pump system, particularly focusing on the third pump (101c). The automatic system (100) comprises four pumps connected in tandem: the first (101a), second (101b), third (101c), and fourth pump (101d). The first three pumps (101a-c) are designated for implements, while the fourth pump (101d) is for a pilot line. Flow from the third pump (101c) is directed to the tank (102) when the signal pressure from either the first (101a) or the second pump (101b) reaches a predetermined cracking pressure of a second DC Valve (103b). This dumping of flow from the third pump (101c) to the tank (102) occurs automatically when there's a requirement to work at higher pressure with lesser flow, thus reducing power consumption of the pumps (101a-101d) when the set relief pressure of the first (101a) and second pump (101b) is reached.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
18 August 2023
Publication Number
08/2025
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
Parent Application

Applicants

Tata Hitachi Construction Machinery Company Private Limited
Jubilee Building, 45, Museum Road, Bangalore – 560025, Karnataka, India

Inventors

1. Ajay Kumar Verma
C/O Tata Hitachi Construction Machinery Company Private Limited, Block No 2, KIADB, Belur Industrial Estate, Garag Road, Mummigatti, Dharwad – 580011, Karnataka, India
2. Ranjit Kumar
C/O Tata Hitachi Construction Machinery Company Private Limited, Block No 2, KIADB, Belur Industrial Estate, Garag Road, Mummigatti, Dharwad – 580011, Karnataka, India

Specification

DESC:Attached ,CLAIMS:Attached

Documents

Application Documents

# Name Date
1 202341055439-STATEMENT OF UNDERTAKING (FORM 3) [18-08-2023(online)].pdf 2023-08-18
2 202341055439-PROVISIONAL SPECIFICATION [18-08-2023(online)].pdf 2023-08-18
3 202341055439-FORM 1 [18-08-2023(online)].pdf 2023-08-18
4 202341055439-DRAWINGS [18-08-2023(online)].pdf 2023-08-18
5 202341055439-FORM-26 [23-08-2023(online)].pdf 2023-08-23
6 202341055439-DRAWING [16-04-2024(online)].pdf 2024-04-16
7 202341055439-CORRESPONDENCE-OTHERS [16-04-2024(online)].pdf 2024-04-16
8 202341055439-COMPLETE SPECIFICATION [16-04-2024(online)].pdf 2024-04-16