Abstract: A method for controlling a network of inverter-based resources (IBRs) during a disturbance includes, in response to a start of the disturbance, employing a systemlevel overload ride-through (SLORT) algorithm among the network of IBRs. The SLORT algorithm includes determining, via a SLORT control module, a modified parameter set for one or more of the IBRs using regularly-updated system-level analyses, transmitting, via the SLORT control module, the modified parameter set to the IBRs, and automatically activating, via one or more local controllers of the IBRs, the modified parameter set, wherein automatically activating the modified parameter set comprises rapidly re-parameterizing one or more parameters of the one or more of the IBRs for a duration of and for a time period after the disturbance so as to transition the network of IBRs from a pre-disturbance stable state to a postdisturbance stable state.
Description:Please see the attachments , Claims:Please see the attachments
| # | Name | Date |
|---|---|---|
| 1 | 202344033281-STATEMENT OF UNDERTAKING (FORM 3) [11-05-2023(online)].pdf | 2023-05-11 |
| 2 | 202344033281-PROOF OF RIGHT [11-05-2023(online)].pdf | 2023-05-11 |
| 3 | 202344033281-POWER OF AUTHORITY [11-05-2023(online)].pdf | 2023-05-11 |
| 4 | 202344033281-FORM 1 [11-05-2023(online)].pdf | 2023-05-11 |
| 5 | 202344033281-DRAWINGS [11-05-2023(online)].pdf | 2023-05-11 |
| 6 | 202344033281-DECLARATION OF INVENTORSHIP (FORM 5) [11-05-2023(online)].pdf | 2023-05-11 |
| 7 | 202344033281-COMPLETE SPECIFICATION [11-05-2023(online)].pdf | 2023-05-11 |
| 8 | 202344033281-FORM 3 [07-11-2023(online)].pdf | 2023-11-07 |
| 9 | 202344033281-PA [08-03-2024(online)].pdf | 2024-03-08 |
| 10 | 202344033281-ASSIGNMENT DOCUMENTS [08-03-2024(online)].pdf | 2024-03-08 |
| 11 | 202344033281-8(i)-Substitution-Change Of Applicant - Form 6 [08-03-2024(online)].pdf | 2024-03-08 |