Abstract: This gas turbine cogeneration system comprises: a gas turbine including a combustor; an exhaust heat recovery boiler for generating boiler steam with exhaust gas exhausted from the gas turbine as a heat source; a water recovery device for recovering moisture from the exhaust gas by heat exchange between refrigerant water and the exhaust gas exhausted from the exhaust heat recovery boiler; and a fuel gas generation facility for generating gas turbine fuel gas to be supplied to the combustor, with industrial water (recovered water and supply water) including recovered water recovered by the water recovery device as at least one of raw materials.
| # | Name | Date |
|---|---|---|
| 1 | 202517062933-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [02-07-2025(online)].pdf | 2025-07-02 |
| 2 | 202517062933-STATEMENT OF UNDERTAKING (FORM 3) [02-07-2025(online)].pdf | 2025-07-02 |
| 3 | 202517062933-REQUEST FOR EXAMINATION (FORM-18) [02-07-2025(online)].pdf | 2025-07-02 |
| 4 | 202517062933-POWER OF AUTHORITY [02-07-2025(online)].pdf | 2025-07-02 |
| 5 | 202517062933-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105-PCT Pamphlet) [02-07-2025(online)].pdf | 2025-07-02 |
| 6 | 202517062933-FORM 18 [02-07-2025(online)].pdf | 2025-07-02 |
| 7 | 202517062933-FORM 1 [02-07-2025(online)].pdf | 2025-07-02 |
| 8 | 202517062933-DRAWINGS [02-07-2025(online)].pdf | 2025-07-02 |
| 9 | 202517062933-DECLARATION OF INVENTORSHIP (FORM 5) [02-07-2025(online)].pdf | 2025-07-02 |
| 10 | 202517062933-COMPLETE SPECIFICATION [02-07-2025(online)].pdf | 2025-07-02 |
| 11 | 202517062933-Proof of Right [10-07-2025(online)].pdf | 2025-07-10 |
| 12 | 202517062933-MARKED COPIES OF AMENDEMENTS [10-07-2025(online)].pdf | 2025-07-10 |
| 13 | 202517062933-FORM 13 [10-07-2025(online)].pdf | 2025-07-10 |
| 14 | 202517062933-AMMENDED DOCUMENTS [10-07-2025(online)].pdf | 2025-07-10 |
| 15 | 202517062933-FORM 3 [29-10-2025(online)].pdf | 2025-10-29 |