Abstract: Method and plant (10) for producing steel comprising at least a first step of direct reduction in which, by means of a direct reduction plant (11), the reduction of an iron ore (20) is carried out, so as to obtain a ferrous material (30), and at least a second step of melting only in which, by means of an electric melting furnace (12), the ferrous material (30) is melted, generating a volume of slag (21) and a volume of liquid metal (40), the latter having a carbon percentage content of less than or equal to about 1%.
| # | Name | Date |
|---|---|---|
| 1 | 202517127684-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [16-12-2025(online)].pdf | 2025-12-16 |
| 2 | 202517127684-STATEMENT OF UNDERTAKING (FORM 3) [16-12-2025(online)].pdf | 2025-12-16 |
| 3 | 202517127684-REQUEST FOR EXAMINATION (FORM-18) [16-12-2025(online)].pdf | 2025-12-16 |
| 4 | 202517127684-PRIORITY DOCUMENTS [16-12-2025(online)].pdf | 2025-12-16 |
| 5 | 202517127684-POWER OF AUTHORITY [16-12-2025(online)].pdf | 2025-12-16 |
| 6 | 202517127684-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105-PCT Pamphlet) [16-12-2025(online)].pdf | 2025-12-16 |
| 7 | 202517127684-FORM 18 [16-12-2025(online)].pdf | 2025-12-16 |
| 8 | 202517127684-FORM 1 [16-12-2025(online)].pdf | 2025-12-16 |
| 9 | 202517127684-DRAWINGS [16-12-2025(online)].pdf | 2025-12-16 |
| 10 | 202517127684-DECLARATION OF INVENTORSHIP (FORM 5) [16-12-2025(online)].pdf | 2025-12-16 |
| 11 | 202517127684-COMPLETE SPECIFICATION [16-12-2025(online)].pdf | 2025-12-16 |