Specification
CROSS-REFERENCE TO RELATED APPLICATIONS
This application claims the benefit of U.S. Provisional Application Serial
No. 61/669,230, filed July 9, 2012. The entirety of the aforementioned application is
incorporated herein by reference.
BACKGROUND
0 TECHNICAL FIELD
Embodiments of the subject matter disclosed herein relate to vehicle
scheduling and control. Other embodiments relate to synchronizing two or more
railway assets to optimize energy consumption.
DISCUSSION OF ART
In light of various economic and environmental factors, the transportation
industry has strived for solutions regarding sustainable energy as well as, or in the
alternative, energy conservation. Conventional solutions include hardware such as,
for instance, fly-wheels or super batteries, which alleviate the sustainable energy
and/or energy conservation. Such hardware can be costly not only for the specific
^ cost of the hardware but the cost routine maintenance thereof.
It may be desirable to have a system and method for managing energy
systems that differ from those that are currently available.
BRIEF DESCRIPTION
In one embodiment, a system is provided. The system includes a first
component configured to receive a timetable associated with two or more vehicles and
at least one terminal. The system further includes a second component configured to
modify at least one of a departure time of a vehicle or a dwell time of a vehicle to
create a modified timetable that overlaps a brake time for a first vehicle and an
acceleration time for a second vehicle.
2
In one embodiment, a system is provided. The system includes a timetable
associated with a first vehicle, a second vehicle, and a terminal, in which the timetable
is a schedule of a time that the first vehicle and the second vehicle are at least one of
arriving or departing the terminal. The system further includes a modify component
configured to adjust the timetable to synchronize a brake duration of the first vehicle
with an acceleration duration of the second vehicle for the terminal.
In one embodiment, a method is provided. The method includes receiving
a default timetable in an offline mode associated with a time schedule for two or more
vehicles and at least one location. The method further includes adjusting the default
timetable by modifying at least one of a departure time of a vehicle, a dwell time of a
^ ^ vehicle, or a speed profile of a vehicle to estimate an overlap for a brake time for a
first vehicle and an acceleration time for a second vehicle in the offline mode. The
method further includes employing the modified default timetable in real time for the
two or more vehicles and the location. The method further includes transferring a
portion of energy from the first vehicle to the second vehicle based upon the modified
default timetable in real time. The method further includes updating the adjusted
default timetable in real time to synchronize a brake time for a vehicle and an
acceleration time for a vehicle by changing at least of a departure time of a vehicle, a
dwell time of a vehicle, or a speed profile of a vehicle.
BRIEF DESCRIPTION OF THE DRAWINGS
j ^ Reference is made to the accompanying drawings in which particular
embodiments and further benefits of the invention are illustrated as described in more
detail in the description below, in which:
FIG. 1 is an illustration of an embodiment of a system for optimizing
energy consumption by synchronizing a first vehicle and a second vehicle;
FIG. 2 is an illustration of an embodiment of a system for generating an
energy model utilized to synchronize a brake time for a vehicle and an acceleration
time for a vehicle;
FIG. 3 is an illustration of an embodiment of a system for controlling two
or more vehicles based upon an optimized timetable that conserves energy by
synchronizing a first vehicle and a second vehicle;
3
FIG. 4 is an illustration of an embodiment of a system for creating an
optimized timetable offline and employing such optimized timetable online to
conserve energy by synchronizing a first vehicle and a second vehicle;
FIG. 5 is an illustration of a graph related to energy consumption of a
vehicle;
FIG. 6 is an illustration of a graph related to energy consumption of two
unsynchronized vehicles;
FIG. 7 is an illustration of a graph related to energy consumption of two
synchronized vehicles;
FIG. 8 illustrates a flow chart of an embodiment of a method for
^fc modifying a timetable to synchronize a first vehicle and a second vehicle;
FIG. 9 illustrates an initial timetable and an optimized timetable;
FIG. 10 illustrates a first train timetable and a second train timetable;
FIG. 11 illustrates an example of interstation lengths for a vehicle; and
FIG. 12 illustrates an example of a flow determination.
DETAILED DESCRIPTION
Embodiments of the present invention relate to methods and systems for
synchronizing two or more vehicle (e.g., railway, among others) assets to optimize
energy consumption. A timetable associated with two or more vehicles and at least
one terminal can be received. The timetable can be modified to create a modified
^^ timetable that overlaps a brake time for a first vehicle and an acceleration time for a
second vehicle, wherein at least one of a departure time or a dwell time is modified.
Furthermore, the second vehicle can transfer energy from the first vehicle based upon
at least one of the modified timetable and the brake time overlapping with the
acceleration time.
With reference to the drawings, like reference numerals designate identical
or corresponding parts throughout the several views. However, the inclusion of like
elements in different views does not mean a given embodiment necessarily includes
such elements or that all embodiments of the invention include such elements.
The term "vehicle" as used herein can be defined as any asset that is a
mobile machine that transports at least one of a person, people, or a cargo. For
4
instance, a vehicle can be, but is not limited to being, a truck, a rail car, an intermodal
container, a locomotive, a marine vessel, a mining equipment, a stationary power
generation equipment, an industrial equipment, a construction equipment, and the
like.
It is to be appreciated that "associated with the two or more vehicles"
refers to relating to one or more of the two or more vehicles.
FIG. 1 is an illustration of an exemplary embodiment of a system 100 for
optimizing energy consumption by synchronizing a first vehicle and a second vehicle.
The system includes a timetable 110 associated with a first vehicle, a second vehicle,
and a terminal, wherein the timetable is a schedule of a time that the first vehicle and
^ k the second vehicle are at least one of arriving or departing the terminal. The time
table can be aggregated by a data collector 120. Moreover, the data collector 120 can
aggregate a static input and/or a dynamic input (discussed below). The system further
includes a modify component 130 that optimizes the timetable 110 based upon the
aggregated information and adjusts (e.g., modifies) at least one of a dwell time for a
vehicle located within a terminal, a departure time for a vehicle located within a
terminal, and/or a speed profile for a vehicle for a terminal. The modify component
130 generates an optimized timetable 140 (also referred to as the modified timetable),
wherein the optimized timetable 140 improves energy consumption.
For example, the optimized timetable synchronizes two or more vehicles
located within a terminal such that while a vehicle is braking, another vehicle is
^ accelerating. In particular, synchronizing a first braking vehicle with a second
m
accelerating vehicle allows a portion of energy to transfer from the first braking
vehicle to the second accelerating vehicle. The system provides synchronization for
two or more vehicles without any additional hardware such as super capacitors, flywheels,
among others. The system can be computer-implemented via software such
that the modify component adjusts a timetable to create the optimized timetable.
The optimized timetable or modified timetable can be implemented to two
or more vehicles 150 (herein referred to as "vehicles 150"). There can be a suitable
number of vehicles such as vehicle i to vehicle D> where D is a positive integer. In
particular, the vehicles can be automatically controlled, manually controlled (e.g., a
human operator), or a combination thereof. In either event, the optimized timetable
5
can be implemented, wherein at least one of a dwell time, a departure time, and/or a
speed profile is adjusted to synchronize the vehicles. By way of example and not
limitation, the vehicle can be a train, a railway vehicle, an electrical-powered vehicle,
and the like.
As discussed, the system can include the data collector. The data collector
can aggregate information related to a timetable, a static input, and/or a dynamic input
(See DATA below). For instance, the data collector can aggregate suitable data
related to the timetable, two or more vehicles, a terminal (e.g., a location, a station,
etc.), and the like. By way of example and not limitation, the dynamic input can be a
dwell time, a departure time, a speed profile, a portion of a timetable, among others.
Jfc Moreover, for example, the static input can be, but is not limited to, a Quality of
Service (QoS) constraint, a constraint, an energy model, a tolerance, an energy
profile, a network topology, an electric efficiency, an origin/destination matrix, a
portion of a timetable, an energy transportation, a loss of energy, among others. The
static input and/or the dynamic inputs are described in more details below.
By way of example and not limitation, the system can create a timetable to
provide synchronization between two or more vehicles. For instance, a timetable can
be created which takes into account at least one of a security constraint, a quality of
service constraint, the issue of energy consumption, and the like. In another example,
the system can optimize an existing timetable for two or more vehicles. In another
example, the system 100 can create a timetable for two or more vehicles as well as
^k optimize an existing timetable for two or more disparate vehicles. For instance, two
stations or terminals can include a set of vehicles respectively. The first set of
vehicles for a first station can include an existing timetable that the system can modify
or adjust to improve synchronization. Further, a timetable can be created for the
second set of vehicles related to a second station.
FIG. 2 is an illustration of an exemplary embodiment of a system 200 for
generating an energy model utilized to synchronize a brake time for a vehicle and an
acceleration time for a vehicle. The system can include a model generator 210 that
creates energy model(s) that can be collected by the data collector and further utilized
by the modify component (not shown). The model generator can create a suitable
model or a model with a suitable aspect to implement the optimized timetable to
6
synchronize two or more trains for energy conservation. The below models and
generation of such models are solely for example and not to be seen as limiting on the
subject innovation (see MODEL ENERGY below).
The model generator can receive a model that represents a condition or
characteristic associated with an environment in which two or more vehicles will be
synchronized for energy conservation. For instance, the model can be or related to,
but is not limited to, energy accountings, network topologies, energy transportation,
ohmic resistance loss, among others. These models can be utilized to create an energy
model for an environment in which two or more trains are to be synchronized with an
optimized timetable by adjusting at least one of a dwell time, a departure time, and/or
ffe a speed profile.
FIG. 3 is an illustration of an exemplary embodiment of a system 300 for
controlling two or more vehicles based upon an optimized timetable that conserves
energy by synchronizing a first vehicle and a second vehicle. The system includes a
controller 310 that can implement a control to the vehicles 150 based at least in part
upon the generated optimized timetable. For instance, the controller can identify a
change in a currently used timetable compared to the optimized timetable and
implement such change. For instance, the controller can implement a new dwell time,
a new departure time, and/or a new speed profile.
The controller can be utilized for an automatically driven vehicle (e.g., no
human operator) as well as, or in the alternative, a human operated vehicle, or a
^ combination thereof. For instance, the controller can include an automatic component
(not shown) that will directly implement controls based upon a change identified in
the optimized timetable. Furthermore, the controller can include a manual component
(not shown) that can utilize a notification component (not shown) and/or a buffer
component (not shown). The manual component can facilitate controlling a vehicle
that is operated by a human. The notification component can provide a signal, a
message, or an instruction to the human operator. For instance, the notification
component can provide an audible signal, a visual signal, a haptic signal, and/or a
suitable combination thereof. The buffer component can further include a buffer of
time that can take into account a delay that occurs from a human operator receiving a
7
notification and implementing such notification. For example, the buffer component
can mitigate human delay to implement the optimized timetable.
FIG. 4 is an illustration of an exemplary embodiment of a system 400 for
creating an optimized timetable offline and employing such optimized timetable
online to conserve energy by synchronizing a first vehicle and a second vehicle. The
system 400 can include an offline mode (also referred to as "offline") and an online
mode (also referred to as "online"). An offline mode can indicate a test environment
or a modeled environment and an online mode can indicate a real time, real physical
world environment. For instance, a real terminal station with vehicles can be an
online environment whereas a computer simulation can be an offline environment.
t^ The system 400 allows a creation of an optimized timetable offline. Once
the optimized timetable is created offline, the optimized timetable can be employed
online. In particular, the controller can leverage the optimized timetable and
implement specifics related thereto with vehicles. The online environment (also
referred to as "online") can include a monitor 410, a trigger 420, and/or a modify
component 430. The monitor can track the vehicles in comparison with at least one of
the optimized timetable and/or a measured amount of energy (e.g., energy conserved,
energy consumed, energy transferred, among others). The trigger can include
threshold values or triggers that will indicate whether or not the modify component
will be utilized to update the optimized timetable based on the tracked information.
The following is a description related to energy optimization of metro
^ ^ timetables.
Sustainable energy has been a major issue over the last years.
Transportation is a major field concerned about energy consumption and the trend is
to tend to optimize as much as possible the energy consumption in this industry, and
in particular in mass rapid transit such as metros. Several hardware solutions, like flywheels
or super batteries have been developed to reduce losses. However, these
solutions involve buying and maintaining potentially costly material which can be
difficult to economically justify.
This application can describe a method which modifies dwell times to
synchronize acceleration and braking of metros. Dwell times have the advantage to
be updated in real time. To do that, a genetic algorithm is used to minimize an
8
objective function - corresponding to the global energy consumption over a time
horizon - computed with a linear program.
The energy consumption in a metro line can be decreased by
synchronizing braking and accelerations of metros. Indeed, an electric motor behaves
as a generator when braking by transforming the kinetic energy into electrical energy.
This energy, available in the third rail, has to be absorbed immediately by another
metro in the neighborhood or is dissipated as heat and lost. The distance between
metros which are generating energy and candidate metros induces that part of the
transferred regenerative energy is lost in the third rail due to Joule's effect.
Most timetables do not take into account energy issues. The tables usually
^ k have been created to maximize quality of service, security and other constraints like
drivers' shift or weekend periods for instance. It is however possible to slightly
modify current timetables to include some energy optimization. Here, energy
consumption of a metro line can be minimized during a given time horizon by
modifying the off-line timetable.
As an example, the model can be restricted to a single metro line (no fork
or loops) including 31 stations with two terminals A and B. All trips are done from A
to B or B to A, stopping at all stations. The timetable, based on real data, is a bit more
detailed than the one given to passengers; in addition to departure times at every
station, it compiles also: 1) running times between every station; and 2) dwell times at
every station.
^ ^ Dwell times represent the nominal waiting time of a metro in a given
station. This time can be different regarding the stations but it is considered here that
every metro have the same dwell time for a given station, not depending on the hour
of the day.
| For every timeslot (1 second in our model), the position of metros
(between which stations they are) is known and the energy they consume (positive
energy or produce (negative energy). Contrary to timetables data which are real,
energy data have been created following energy models. Units can be arbitrary: a
value of 1 in this system corresponds to the energy consumed by a metro at full
throttle during one second. Losses due to Joule's effect are compiled in an efficiency
9
matrix. It details the percentage of energy which can be transferred from a point to
another point in the line.
The objective (1) is to minimize the energy consumption over a given time
period, thus to minimize the sum of energy consumptions over every timeslot. If T is
conserved the set of timeslots and yt the energy consumption of the line at timeslot t,
then the objective function is:
minX/y t W
ter
I P The better use of regenerative energy can prevent the client investing in
costly solutions like changing this. The computation of yt can be seen as a
formulation of a generalized max flow problem which can be formulated as an LP
problem. The minimization of the objective function is done by modifying only dwell
times to shift schedules slightly and to synchronize in better way accelerations and
braking.
As global energy consumption is optimized by modifying dwell times, the
need to clarify what are the relevant dwell time for the formulation arises. The dwell
times are computes as follows:
Sets
T: timeslots.
•
— I: metros.
S: stations.
- I ) r c / x S : relevant dwell times.
10
Parameters
Depi%s: arrival time t € T of i E I to the station s & S.
- Di,B: dwell time of i, s £ T?r.
- 5: minima] quantity for delaying/speeding up a dwell time.
Variables
dijS: optimized dwell time of metro i € / at station s € S.
- njS € Z: number of times S is applied to a dwell time i,s.
Model
4,* = A,* + nS (2)
with Pr = {D 6 / x S / inf(T) < Dep^ < aup(T)} (3)
^ ^ Then these are the dwell times "*,* € P r C i x S tnat. the genetic
algorithm will modify to minimize the objective function. Note that n can be
unbounded. In the model, it is however bounded by small integers to stick on the
quality of service issue and to keep having an invisible optimization for the final user.
Modifying dwell times involves a new synchronization between metros.
Every iteration of the genetic algorithm can be computed, resulting in an objective
function. As explicated in (1), every timeslot represents an independent problem.
The issue here is that it is hard to know exactly how regenerated energy will spread
throughout third rail and other metros. Some models take as a hypothesis that metros
can transfer entirely their regenerative energy to others only if they belong to the same
electric sub-section. The hypothesis here is that energy is dissipating proportionally
4fe to the distance between two metros. Also, the hypothesis here is that the energy is
spread in an optimal way, i.e., the model minimizes the loss of energy. Then, for a
given timeslot there is:
11
Sets
I+: metres consuming energy.
- / ~: metros producing energy.
Parameters
- Ef: energy consumed by metro i € J+{> 0).
- E~: energy produced by metro i G / " ( < 0).
Aij: proportion of the energy produced by i € I~ transferable to j € /+
due to Joule's effect.
Variables
- Xiji proportion of the energy produced by i € I~ transferred to j €. i + .
0 Model
minimize y (4)
subject to
E^++E^"-E^Ai) 0 Vie J - , V J ' G J + (8)
0 2/>0 (9)
The LP model minimizes the energy consumed by spreading the energy produced in
such a way ~ 2->i (• * - ^ j ^ i j - ^ t j ; j s maximized. Note that (9) prevents the
energy to be less than 0 at a given timeslot. It is because it is considered that the
regenerative energy which is not utilized immediately is lost.
By modifying only slightly the dwell times, it is considered that the
algorithm never reaches non satisfiability (not satisfied) as it is stayed in tolerable
intervals, e.g., for headways. Every individual in the population is represented by a
two array table with metros in rows and stations in columns. Each cell represents a
.2
dwell time. Starting with initial.dwell times, a population is created made of 100
individuals. Then every dwell time is randomized within a predefined domain, e.g., f-
3s, 0s, +3s, +6s, +9sg. Finally, for every iteration, individuals are classified according
to their objective function and selected. A crossover and mutation can be applied to
them until convergence.
The model has been tested with a one-hour time horizon, corresponding to
3600 timeslots, 29 metres, and 495 dwell times to optimize. The objective function
has a value 8504 a.u. at time tO. After 450 iterations, total energy consumption is only
7939.4 a.u, that to say 6.6% saving. The computation lasts over 88 hours long on an
Intel Core 2 1.86GHz Linux PC. As this optimization is to minimize an off-line
^fc timetable, it can be allowed.
A real metro line is subject to minor disturbances that can affect the
adherence to the timetable. To check the relevance of the optimization, there can be
an added a random noise on optimized dwell times to quantify the robustness of the
objective function. This noise consists in randomly modifying dwell times by ± S s.
Noise (a) 1 3 6
Average on 100 7964,9 7995,7 8028,4
tries (u.a.)
Saving (%) 6,3 6,0 5,6
Table 1. Alteration of the objective function according to noise
m
^ Table 1 shows the results. It can be seen that even with 6 second noise
(corresponding to 2 intervals of modification from time of parking/stationary), the
objective function is still saving 5.6% energy. This means that the optimized solution
is saving energy, but also all its neighbor solutions.
This resolution method to optimize the energy consumption in a metro line
seems promising and deserves more research. In particular, it is wanted to increase
the number of parameters that can be modified, such as departure times in terminals
or speed profiles. Effort can be made to also compare these results with other
methods such as constraint programming. Eventually, decreasing computation time
13
can allow this method to be used in a real-time context, in particular when it is about
to optimize energy consumption after major incidents.
The following is a description related to a data model for energy
optimization.
The following provides a comprehensive overview of the different data
needed to formalize a model representing the energy consumption of trains and/or
vehicles. It gives also a possible formulation of the model itself regarding the given
data as well as different approaches for representing as best, and taking into account
time computation, the energy consumption.
Embodiments of the invention can be a software system used to decrease
^ P energy consumption in a metro line. This system allows a better synchronization of
accelerating and braking metros, optimizing the use of regenerative energy produced
by metros when braking.
In an embodiment, the system uses as input the current timetable of a line.
Including all possible regulation constraints like headways, the system modifies dwell
times, departures times, and possibly speed profiles in a transparent way for the user.
Indeed, the system takes into account quality of service by only slightly modifying the
different parameters of the trip. To decrease energy consumption, the system has
energy data of trains (their energy profile) as well as the topology of the line (how do
electric sub stations work) to optimize train patterns. The output of the system,
embedded in ATS, is a new version of the timetable, which may look like the old one
j ^ but which is energy optimized.
The system allows optimizing the use of regenerative energy due to
braking metros (vehicles, trains, etc.). Indeed, if the regenerative energy is not
consumed immediately by another metro in the line (if there is no other solutions like
reversible electric sub stations or super capacitors), then this energy is lost as heat in
the third rail. The regenerative energy, even if it does not decrease directly the overall
energy consumption, permits to use less energy to start another metro which needs
energy at the same time. Then the optimized reuse of regenerative energy indirectly
decreases the total energy consumption.
The better use of regenerative energy can prevent the client investing in
costly solutions like changing his electric substations into reversible ones or
14
embedding batteries in metros. The software approach as well as the minimal impact
on quality of service can be seen by the client as a "free" optimization, because he can
save energy just by clicking on a button "optimize", and not by adding new devices on
the line.
Conventional techniques provide different solutions to attempt to use the
regenerative energy such as, but not limiting to, powering the air conditioning system
in metros, charging embedded batteries, powering flywheels for later use, charging
embedded super capacitors, supplying reversible electric substations, among others.
Embodiments of the system further include a graphic user interface (GUI)
that allows setting parameters of optimization in real time to make a system or metro
^k line more efficient. The GUI can allow selection between optimized or actual
timetables when perturbations occur.
This model can be used in to minimize the energy consumption of trains
over a period of time by software means. The optimization would indeed be done
modifying the dwell times and departures at terminals and/or speed profiles. This
optimization solution would be part of the solution of creating timetables and in
another time, would be implemented for optimizing energy during real time
regulation.
DATA
The following is a description of the data utilized by an optimization
model. To formulate a model accurate enough to forecast the gain in energy a fine
^ optimization of timetables can perform, one needs the relevant data to do so. These
data might be retrieved from a real case or made up internally, knowing the more
realistic the data, the more relevant the optimization. The following is an example of
data and is not to be limiting on the subject application.
The data can be at least one of the following: feasible timetable (including
departures/arrivals of stations/terminals, dwell times, train patterns/trips linking,
stabling/unstabling pattern, etc.); energy profiles (depending on charge of
train/vehicle, type of rolling stock, speed profile, etc.); electric network topology;
electric efficiency of equipment; tolerances (for degrees of freedom, quality of service
constraints, feasibility constraints, etc.); and origin/destination matrix.
15
All data such as energy profiles, timetable scheduled hours and other
including a time precision should be standardized. This precision will be chosen
regarding different terms: precision of real systems; computing space available;
and/or need for good precision for optimization. In an embodiment, the optimization
and model can be discretized (e.g., discrete model) and not continuous.
TIMETABLE
The optimization of the energy consumption in a metro line can be done
on an already made timetable. The optimization can be a modification of several
parameters of an initial timetable which minimizes the energy consumption and not a
creation "from scratch" of a timetable considering energy issues. However, several
fl^ possibilities are open to get this timetable.
The timetable can be fully given, that is to say that it gives the departure
times of every trip at every stop. This is typically the timetable given to passengers
for information in railroad but not in mass transit, where the timetable is mostly given
in terms of periodicity (e.g., every 2 minutes). In addition, the optimization needs the
information about stabling/unstabling trains at terminals as well as rolling stock types,
speed profiles associated to every trip.
It can be given as well a map of departure times at terminals in addition
with running times and dwell times at every station, those giving a full timetable
when computed together. The information about stabling/unstabling and rolling
stocks is still needed though.
^ ENERGY PROFILE
The energy model cannot be done without knowing exactly what are the
energy consumption as well as the regenerative energy of the trains. The energy
profile is however dependent to a lot of factors and several profiles - or at least a way
to deduce several scenarios from a general profile - are needed.
It is easier to move a train when empty than in peak hours when full of
people. That is why one should have different charge-dependent energy profiles. It is
also possible to have a charge-dependent rate which would be multiplied to an empty
charge energy profile to get trains energy profiles dependent of their charge.
16
Every type of train have different energy pattern, regarding their engine
efficiency and their possible capability to provide regenerative energy, which can be
taken into account.
Most of timetabling software takes into account different speed profiles for
a train. For instance, one can drive a train at normal, fast or economic speeds. These
speed profiles can imply substantially similar amount of energy profiles.
ELECTRIC EFFICIENCY
There is a difference between the input energy and the useful energy - i.e.,
the kinetic energy of the train - because real devices are never 100% efficient.
Every wire, catenary, third rail or any other cable has an internal resistance
£ k greater than zero. With this data, the losses over cables are known, which would
change the amount of regenerative energy a train is able to supply to another one. For
instance, supplying a train at terminal B with the regenerative energy of a train
braking in terminal A is not possible regarding the lineic resistance.
In the same spirit, transformers and other electric devices (such as rolling
stock) have a particular efficiency which has to be taken into account.
NETWORK TOPOLOGY
Regarding the topology of the electric network of the metro line, it might
not be possible to do several actions. It is important to know, over a particular
example, if it is physically possible to, for instance, link directly to electrical points.
The network can possibly be divided into electric sections which may be
independent. By doing so, the trains are forced to supply other trains with
regenerative energy only if they are in the same section, being unable to supply
electricity in other sections if they are isolated.
One has to consider the maximum amount of energy cables and equipment
are able to withstand without deterioration. It is particularly important regarding the
issues of maximum traction energy: a peak of energy occurring at a given time which
can be above a certain limit.
TOLERANCES
The tolerances are the levers which can be pulled to optimize the energy
consumption. It has been chosen that the energy optimization would be done only by
modifying the timetable, and not using hardware means such as fly wheels or
17
embedded batteries. The tolerances given by the data will most likely be the
acceptable intervals where the quality of service is not impacted.
These parameters are the ones the optimization can directly modify to
minimize the overall energy consumption.
The stops in every station, normally given in the initial timetable, will be
modified for optimizing the timetable. Regarding initial dwell times, one will be able
to shorten or lengthen them in a certain amount given by tolerances. To not impact on
quality of service, it will be also necessary to take care of a global shift all along a
trip. For instance, every dwell time of a 20-station trip can be shortened by 5 seconds
but the global shifting cannot be greater than 50 seconds (10 dwell times shortened).
tf) Similarly to dwell times, departure times can be shortened or lengthened
depending on the need of the optimization. The main difference is that departure
times might be shifted inside bigger intervals as the departure time affects much less
the quality of service (nobody is waiting in the train at this moment).
Speed profiles can be adjusted or modified to optimize the timetable
(discussed above).
These parameters are the ones the optimization will indirectly modify as
they are dependent to ones the optimization can directly modify. These constraints
can be unsatisfied during the process of optimization but the final optimized timetable
must satisfy all the constraints, or the timetable will be considered unfeasible.
The commercial speed represents the time a train is taking to go from its
^ ^ departure terminal to its arrival. Optimizing timetable should not affect too much this
commercial speed. Whereas departure times do not affect it, dwell times do. Indeed,
if a train is delayed by 10 seconds at one station but sticks to the timetable at the rest
of its trip, then its commercial speed will be lengthened by 10 seconds.
One has thus to take care of the commercial speed of trains, for instance by
balancing the delays of trains; if a train is delayed at a station, it may leave earlier
another station (see FIG. 9). FIG. 9 illustrates an initial timetable and an optimized
timetable, wherein as first dwell time is shortened in the optimized timetable, others
have to be lengthened to respect commercial speed.
18
The distance (or time) between two trains is crucial in terms of security -
when the headway is too short - and in terms of quality of service when it gets too
long. The headway is obviously directly modified by the modification of dwell times;
one has to know the limits of modification of these.
Headways imply two kinds of tolerances: local and global. The local
tolerance forces the headway to be within an interval centered on the initial headway
(e.g., ± 10%). The global tolerance acts as a "balance" between different headways.
Indeed, to not degrade too much the quality of service, headways have to be not too
different from each other to not create gaps between trains as shown in FIG. 10. FIG.
10 illustrates Train 1 and Train 2, wherein Train 2 is delayed to optimize energy
^fc consumption and pulls train 3 which is delayed as well. To understand it, one can
imagine that every train is linked to others with a spring. If a train is delayed, then it
pulls on other springs and other trains are delayed as well.
Different constraints are occurring in terminals which have to be taken into
account for testing the feasibility of the timetable. Usually, only a limited amount of
trains can take the actions of stabling, unstabling or returning in the same time at a
particular terminal.
ORIGIN/DESTINATION MATRIX
This three dimension matrix represents the number of people going from a
station to another in function of time as shown in Table A. It will be useful in some
model refinements to formulate penalties on certain moves for optimization. For
^ instance, a station which is considered as strongly used by passengers will not likely
have its dwell time changed compared to another station where few people stop at.
The origin/destination matrix can be delivered with an approximation of the amount
of people using metro at each station. This refinement is of course to avoid degrading
the quality of service.
The matrix may be used in future development for testing the robustness of
the optimization, by introducing perturbations within the matrix and verifying that the
optimization remains intact.
19
Number
stations Of 1 2 3 4 5
people
1 2145 0 20 36 22 22 100
2 1287 10 0 23 30 37 100
3 564 31 19 0 33 17 100
4 3780 40 30 12 0 18 100
0 5 1546 17 37 28 18 0 100
Table A - Origin/Destination matrix for a 10 minutes section of 5 station
MODEL ENERGY
The following relates to algorithmic approaches to model energy flows in
the railway network. Different formulations can be inferred regarding to the topology
of the real system one wants to model and to the simplifications one has to make to be
able to optimize the model in reasonable time. The following shows several ways to
formulate different parts of the energy section of the data model.
ENERGY ACCOUNTINGS
^ The way one is counting the energy consumed over a period of time
obviously modifies the accuracy of the model. However it might be possible to show
that the differences on counting energy influence only the absolute final value and not
the relative gain of energy allowed by an optimization. Some simplifications on how
to count energy may thus be conceivable if the output of our model is a relative gain
of energy compared to the initial solution. The need of refining the model is however
essential if the output of the model considers absolute values like the maximum
traction energy.
This formulation considers as the energy needed, thus the energy
considered in optimization computation, the one which is effectively used to supply
i
20
electrically the train. This model actually considers that the electric energy provided
by electric stations is fully available without any loss anywhere on the network. This
model is valid assuming that electric losses through materials and equipment can be
considered as constant over a time period and then irrelevant for a relative
optimization.
This formulation prefers considering the energy drawn from electric
provider needed to supply the train, possibly considering potential losses due to ohmic
resistances in the third rail or in catenaries. This energy is logically higher than the
energy eventually consumed by the train. This refinement is particularly important if
it is considered the maximum traction energy issues.
0 NETWORK TOPOLOGIES
This formulation considers that all points of a network (most commonly a
single metro line) are electrically linked. This means that a braking train would be
able to provide energy to any given train accelerating at any point of the line.
This formulation considers that the network is divided into independent
sections which are electrically isolated from each other. This means that a braking
train would be able to provide its energy to trains accelerating only if they are in the
same area or section.
This simplification considers that a single electric station is providing
electric energy on all points of the network. This simplification, associated with the
sink oriented energy counter, allows not considering the primary energy
^k transportation which occurs between electric stations and trains accelerating. It
permits focusing only on the secondary energy transportation, that is to say the
exchange of energy from trains (braking) to electric stations or, depending on the
model, directly from braking trains to accelerating trains.
This model considers that trains are electrically supplied by different
electric sub-stations, depending position on the network. For instance, one can
consider that there is an electric sub-station at every metro station and that trains are
drawing energy to the network from the electric sub-station/metro station they belong
to at a particular time.
ENERGY TRANSPORTATION
21
This transportation includes the transfer of electric energy between the
electricity provider and the train, counting different devices such as cables or
transformers which can occur as intermediaries.
This transportation includes the energy provided by regenerative brakes on
trains to supply other trains, counting different devices such as cables or transformers
which can occur as intermediaries.
Direct exchange is a formulation that considers regenerative energy is
directly shared between trains only via wires.
Indirect exchange is a formulation that considers braking trains give back
energy to the electricity provider which is able subsequently, to provide this energy to
Q demanding trains. It is also possible to consider that regenerative energy is bought
back by the electricity provider instead of being redistributed over the network
OHMIC RESISTANCE LOSS
One can consider the electric transportation through wires, catenaries and
third rails as perfect, that is to say that electric energy provided by a device on the
network would be usable fully and instantaneously by any other device of the
network. It is obvious that for having a more accurate model, one has to consider
ohmic resistance losses occurring in all cables. These energy losses can be considered
on the primary energy transportation, the second energy transportation or both.
This formulation (geographic losses) allows the most accurate way to
model ohmic losses. It is based on keeping track of trains over a grid which exactly
A represents the network topology. The losses are then simply computed, multiplying
the distance between two electrically linked points by an attenuation rate. The main
issue is that keeping track of trains geographically implies having an accurate model
which includes distances and speeds. This formulation seems to be at first glance too
much refined to have a simple and fast optimization program.
This formulation (interstation losses) is a relaxation of the geographical
topology. It only keeps track of the interstation (the area between two metro stations)
where every metro is. So the losses are computed by checking the distance between
two interstations and applying an attenuation rate as shown in Table B. For instance,
if two metros are in the same station, the distance is 0, and so on.
22 I
I Interstation I 0 II p2 [1 |~4 |~5+ I
Distance
Attenuation 1 03 0/7 OA 671 0
rate
Table B - Attenuation rate in function of the distance between two interstations
Depending on the network and physical constraints given by experts, it is
possible to set different functions of attenuation.
^k The attenuation decreases linearly along the distance between two points.
The gradient would be chosen accordingly with experts.
The attenuation is low on short distances but decreases strongly when
distances do so.
EQUIPMENT LOSSES
It is considered here that the different energy transportation devices
(cables, catenaries, third rails...) have the same ohmic resistance and thus the energy
loss along distance is simply a function of an attenuation rate (e.g., homogeneous
equipment).
Catenaries, third rails, etc. have different ohmic resistances and each
section/area is associated with equipment, so a particular attenuation function. If
during an energy transfer, different equipment is used, then the losses are different
^ along the different sections (e.g., heterogeneous equipment).
A selection can be made between choosing to count or not devices which
are intermediaries between two electric points, such as transformers, providers or
trains. Every device can have an energetic efficiency that one has to take into account
in the computation of the energy consumption (e.g., transfer equipment counting).
DATA SHAPE
Beyond the several possibilities given by all different sorts of data one
could get, one model with a particular shape for data has been chosen for a first
implementation. It follows the formulation of past work adding some refinements in
|
23
terms of computing energy. The shape of the important data needed as soon as
possible is explicated below.
The precision for the discretized data (e.g., discrete data) is chosen at 5s.
It is then possible to optimize finely without altering quality of service. Moreover,
most of state-of-art software works with a granularity of 5s.
DATA TABLE
The below Table C illustrates data tables regarding an exemplary trip 1
and trip 2.
Tl -> T2 ^___ T2->T1
# Trip 1 ll 31 5 Trip I 2| 4| 6
Departure Departure
Time 0 240 500 Time 50 295 550
Dead Run
Time I 1201 1201 120 | 1351 1351 135
Speed Profile Speed Profile
Tl -> SI norm norm norm T2 -> S4 normal normal Eco
51 -> S2 eco eco eco S4 -> S3 normal eco Eco
52 -> S3 eco normal eco S3 -> S2 normal normal Eco
S3->S4 eco eco fast S2->S1 eco fast Fast
S4->T2 |fast |fast |fast~ SI ->T1 | fast [fast 1 normal
Dwell Time Dwell Time
SI 1 301 251 35 S4 I 301 251 30
S2 25_ 25_ 25_ S3 30_ 25_ 25_
S3 30_ 35_ 30_ S2 30_ 40_ 25_
S4 30_ 30 25 SI 30_ 30_ 25_
W 1 T2 1 401 401 401 | Tl 1 40 j 401 401
Arrivals and departure times of trip 1 can be drawn from the
data table above and the energy patterns of each
interstation/speed profile.
Trip 1
I Journey I T1D I S1A I SID I S2A I S2D I S3A I S3D I S4A I S4D I T2A I T2D I
Time 0 120 150 300 325 475 505 655 685 785 825
A=Arrival
24
D=Departure
Table C -Shape for data formatting
An interstation, in accordance with a speed profile, will have a specific
energy pattern (see Table D). This pattern represents the energy consumed (or
generated) by a train within timeslots of 5 seconds. The duration of this pattern (in
terms of timeslots) will be used to set the timetable of the trip.
I SI ->S2 normal 1
5 sec traction
A Timeslot (kW.h) Comments
-_ 0,00 dwell
1 1,39 traction
2_ 5^56_
3_ 8,33_
4_ 4J/7_
5 0,69 coasting
6_ 0j69_
7_ (M>9_
8_ (M>9_
9 0,69
\0_ -4,17 braking
U_ -2,08
12_ -0,69
1 -| 0,001 dwell |
W Table D - Example of an energy pattern
This (dead run times) represents the time needed for a train to operate in
terminal. This includes the change of direction and of driver. These figures are
important to check that not too many trains are "jamming" in terminals during
optimization.
An attenuation matrix can be employed. Even if a metro line consist of
several electric sub-stations and sections which supply energy to trains accordingly to
their geographical position, consider that sections are interconnected so that
regenerative energy from braking can be dispatched all along the line.
25
This hypothesis implies taking into account Joule effect in third rail. The
lineic resistance of the third rail is equal to 7uQ/m.
The driving tension for metros is equal to 750V.
The regenerative energy is equal to around 30-40% of the traction energy.
The power peak of traction for a single train is equal to 3000kW and to 2000kW for
the braking phase.
Consider after some computation (see below Annex 1) that the attenuation
is equal to 1.65%/km. It means that if a braking train is able to produce 3MJ, it will
be however able to supply a train at 5km far from it with only 2.75MJ.
Every given time, it will be possible to know at which interstation (the line
Q) between two stations) a train is, knowing the journey pattern and the time pattern of
every train. Then, when a train will brake to supply candidate trains on the line, it
will be necessary to compute the attenuation of the energy along the third rail.
To compute the attenuation between two interstations, multiply the
attenuation rate by the probable distance between two trains.
For instance, if two trains are in the same interstation, one cannot know
exactly where they are and what the distance which separates them is.
That is why a probabilistic value can be used to compute the attenuation
which is done as follows: 1) If two trains are in the same interstation, their probable
distance is 1/3 of the length of the interstation; and 2) If two trains are in two different
interstations, their distance is equal to half of the length of the two interstations they
^ belong to plus the length of the interstations which separate them.
The example below (FIG. 11 and Table E) shows how an attenuation
matrix will look like. FIG. 11 illustrates an example of interstation lengths using the
RER A path in Paris. Annex 3 explains how the figures are computed. In the
example, if a train is generating energy in interstation 2 (between Nation and Gare de
Lyon) to supply a candidate in interstation 5 (between Auber and Charles de Gaulle -
Etoile) then the energy supplied will be attenuated by 12.5%.
1
26
I | l | 2 | 3 | 4 | 5 | 6 l
1 1,65 3,8 7,76 12,1 16,3 22,7
2 3,8 0,99 3,96 3,22 12,5 18,9
3 7,76 3,96 1,65 4,37 14,9 14,9
4 12,1 3,22 4,37 1,16 4,13 10,6
5 16,3 12,5 8,5 4,13 1,49 6,44
I 6 122,7 118,9114,9110,61 6,44 12,81"|
Table E - Attenuation matrix related to FIG. 11
In most cases, power peaks are computed independently for each
substation. However, total energy consumption is computed globally. One problem
^ P when computing sum of energy consumptions is to compute the attenuation of
regenerative energy. Indeed, if you consider in a timeslot one regenerative train and
two candidates trains for its energy, you cannot solely subtract the regenerative of the
sum, you have to compute the attenuation for giving energy to every candidate and
not counting it in the sum of energy consumptions.
Hypothesis 1: Regenerative energy of a braking train is given in priority to
the closest candidate and so on until the braking train does not have any more energy
remaining or any more trains are candidate.
Hypothesis 2: if several trains generate energy, the one which generates
the most supplies in priority.
Hypothesis 3: if no more trains are candidate while some regenerative
A energy remains, this energy is considered lost and the sum of energy consumptions is
equal to 0.
See the algorithm in section below referenced Annex 2 for more details.
Headways are computed between adjacent trains on the line all along their
respective trips. It is possible to easily compute headways at every station subtracting
arrivals and departures of trains (see Table C) and checking headways are included in
authorized intervals.
These authorized intervals are expressed in terms of percentage. For
instance, possible headways for an optimization would be in this interval: 0.9 x Initial
Headway < Authorized Headway < 1.1 x Initial Headway.
27
Commercial speed is the time a train takes to cover its whole trip. As well
as headways, commercial speed must stay in an authorized interval after optimization.
However, it may be considered different tolerances regarding the daytime: tolerances
will be looser during off-peak hours for instance.
DATA OUTPUTS
The modifications of the timetable are the heart of the energy optimization.
They consist in changing, under some constraints, the departure times of trains at
every station and the speed profiles of trains at every interstation. The data table will
compile all modifications of every trip at every station. The modifications will be
directly used to change the energy timetable. The modifications are described by the
^ delay in timeslots (so here in seconds) between the original driving pattern and the
optimized one. If a departure is earlier than the original one, the delay will be
negative and positive if it is later. Note that dead run times are a priori not
modifiable.
Here is an example (Table F) of timetable modifications:
ITI -> T2 ~|
Trip 1 1 1 3 I 5
Departure Time 5 -10
Dead Run Time |
Speed Profile
Tl -> SI I - I fast I - ~
SI -> S2 normal
9 S2->S3
S3 -> S4 normal - normal
S4->T2 I - | - I - ~
Dwell Time
SI I 5 1 - I 10~
S2 -5 - 5
S3 10 -5 5
S4 -10
| T 2 | - J - I - |
Table F - Timetable modifications example
28
In trip 1, the speed profile for interstation S3 -> S4 changes from economic to normal
when the dwell time at station S3 for trip 3 will be shortened by 5 seconds.
Basically, the energy timetable is a function of the data table (which gives
the departure times, the dwell times and the speed profiles), the energy patterns
(which fill the energy consumption from the departure timeslot until the end of the
pattern) and the timetable modifications (which modifies the pattern).
It compiles also the section where is every train at every timeslot to
compute the energy consumption.
ANNEX 1
Considering a single train can be supplied for traction up to 3MW and
At power peak in regenerative braking is equal to 2/3 of this amount, so 2MW.
Considering nominal voltage of the line is 750V. Considering lineic resistance of
third rail is 7u£l/m. Considering braking lasts 15 seconds and generates electricity
from 2MW to 0 following a linear curve.
_ fls
Wbraking _ 1 ^braking- d t
Jo
fls ( . 2.10s Wbrakinfi = Jo ^ 2 . 1 0 * - — t j . dt
Wbrakin6 = 15 MJ
Knowing that
^ WhMt = J \ e a t . dt
Where Wheat is the energy dissipated due to Joule's law and P|ej$ the power dissipated,
That
Where Wheat is the energy dissipated due to Joule's law and Pheat the power dissipated,
That
Pheat = ^lineic- "•'
29
Where Rimeic is equal to the lineic resistance of the third rail, D the distance between
the regenerative train and the candidate and I the intensity
With
U = R.I
Thanks to Ohm law, U being the voltage,
We have
U2
"lineic
So
D-Riin*icf15/ 6 2.106 \ 2
j
Wheating = 24.9k|
With D= lkm.
So the attenuation for 1 km of distance is equal to
Attenuation = ^ = 1.65%/km
**b caking
ANNEX 2
For a given timeslot:
SETS:
Trains (relevant at this given timeslot)
•
Givers = {i, Vi G Trains / Ej < 0} ordered by E descend
Candidates = {i, Vi G Trains /Ej > 0}
PARAMETERS:
P, = geographical position of i £ Trains
En4 = energy consumed (or generated)by i G Trains
Mi j = rate of attenuation between i G Trains and j G Trains
VARIABLES:
X = energy consumption in the timeslot
Ej = energy consumed effectively by i G Trains
Dj = ohmic resistance distance of i G Candidates to a given train
for all (i in Trains)
E(i) = En(i);
for all (i in Givers)
30
if(Candidates={})
break;
for all (j in Candidates)
DG) = M(P(i),PG));
Set CandidatesRelative = Candidates ordered by D ascend;
while(CandidatesRelative != {} || E(i) != 0)
if(EG)>E(i)*DG))
EG) = EG)-E0)*DG);
E(i) = 0;
else
E(i) = E(i)-E a Boolean formula
in conjunctive normal form:
m
do AV/, ,
;=1 j l'J
where every ltj is a literal of the form Xk or -'Xk for 1 < k < n.
For every 1 < k < n and 1 1 and a time t such that T\t
= ~ T'o.t ~ + and a station i such that t = 8 • i - 4,
and there exists aj such that l\j = Xk' or ltj = ~ 1,
if there exists ay such that Ijj = Xk>, then Uku = -1 and Tku-\ = +, therefore if *'•'= 1
then T'k-,t= +• Similarly, if here exists aj such that /,,7 = ~~ 1, 7*,, = + only if t
= 8 • / - 5 + Uk,t, with -1 < Uk,t < 2, and there is, for k > 1, Tk„t = - only if t = 8 • / -
1. Therefore, k = 0 and k' > 1 and there exists an / such that t = 8 • / - 5. Since T'ku
- +, there is either S'w = - 1 or Sk',i - 1- If ^t;i = - 1, then Uku = 1 and there exists/
such that lij = -'Xk'. Similarly, if 8'k',\ = 1, then Uku = - 1 and there exists/ such that hj
= Xk,
Theorem 1. The network can save m, energy units if and only if <>| is
satisfiable.
37
Proof. If > is satisfiable, there exists a valuation v such that v($ <» 1.
Consider the timetable T derived from T with for every 1 < k < n, S'w = 1 if
v(Xk) = 1 and S%',\ = -1 if v(A!Jt) = 0. For every clause 1 < / < m, since v($ <» 1, there
exists ay such that v(/,,y) = 1: that is to say, either <%;i = -1 if /,y = -> Xk or <%;/ = 1
if Ijj -Xk- Therefore, according to lemma 1, for t = 8 • /' - 5, there is T'o.t = - and T\t =
+. So it is possible to save one energy unit at time t = 8 • / - 5 for every 1 X^or S\>t\ - 1 if Uj=Xk. That is to say
v(/y)=l-
Example 1. Let > <» (x v y v ~>z) A (JC V -iy v z) A {px v y), the
constructed timetable T is as follows, with t for travel at coasting speed, -for braking, +
to < t t - d d d d d + t - d d d d d + t - d d d d d + t
x d d + I t t t - d d + t t t t - d d d d + t t
y d d + t t t t - d d d d + t t - d d + t t t t
z d d d d + t t - d d + t t t t - d d d d d + t
for accelerating and dfor dwell time.
^ | The following relates to fitness function. The fitness function of the
genetic algorithm is copied on the objective function of the model. Different methods
are presented below to resolve it, as the computation of it is not trivial. Even if it can
be modeled as a generalized max flow problem in a lossy network, whose some
resolution algorithms run in polynomial time (in around 0(n4) though), it can also be
resolved by a pure LP problem, and by a heuristic whose deviation to the real values
is really small.
The following relates to generatlized max flow problems in a lossy
network. The notion of max flow has been introduced by Ford-Fulkerson in 1962 in
[4] and has been a major research field in the 80's to find polynomial time algorithms.
The max flow problem is the problem of maximizing a flow in a flow network.
38
A flow network is a finite directed graph G(V, E) consisting of edges (w, v)
e E with a capacity c(u, v) and a flow f(u, v) < c(u, v) and at least two vertices e
V, the source s which can produce flow and the sink / which can absorb flow.
In the generalized maximum flow problem, edges are given in addition
with a positive gain function y(u, v) and an excess function e/such as:
«/(0= Z r(v,«)/(v,«)+ £/(M>v) [5]
which means that if a flow f(u, v) is entering at vertex v then y(u, v)f(u, v) is going
^ k out from v.
Identically to regular maximum flow problems, a flow conservation
constraint exists here and ensures that:
e / ( z ) = 0 , V/eV\{s,0. [6]
Then the generalized max flow problem is to find a generalized flow /
maximizing the excess function at sink £•/•(/)•
The generalized max flow model allows for formulating the computation of
the objective function as a particular case of it.
Consider an oriented graph G(V, E) with vertices as follows:
• a source s
^ • vertices corresponding to trains that produce energy (T)
• vertices corresponding to trains that consume energy {f)
• a sink t.
Edges consist in the virtual links between trains and energy. Then,
there are three types of edges:
• The edges starting from the source which represents the virtual energy
which is given to trains that produce energy. The source virtually gives in the
graph energy to trains e r with an efficiency of 1.
(5,0 eE <=> / e r [7]
; i
i.
39
•
c(s,i)=ET, y(s,i)=i [8]
• The edges virtually linking trains that produce energy to those which consume
it. Indeed, producers are potentially able to distribute their energy to
any consumer, even several consumers. The difference in the distribution is
the efficiency along the edge representing the Joule's effect losses directly
proportional to the distance between trains.
(i,j)€E^ier,J€f (9)
c(i,j) = E-,y(i,j)=AiJ (10)
• The edges going from consumers to the sink represent the energy that has
j ^ effectively been saved during the transfer of regenerative energy. The capacity
of these edges ensures that a consumer cannot get more energy than it can
absorb.
(i,t)eE «=> i e t (11)
c(i,j) = Et
+, y(i, j) = 1 (12)
For example, a zero flow can correspond to an absence of regenerative
energy transfer. By augmenting flow along paths between source and sink, more
and more energy is saved until saturation of the graph. As the energy consumption
of a timeslot is equal to the energy consumed by accelerating trains minus the
amount of regenerative energy they absorb, the corresponding objective function in
^k the generalized max flow representation is:
£(c(/,o-/ao)
obj= > (13)
with the capacities of edges representing the energy consumption of accelerating
trains and the flow the regenerative energy they absorbed.
As the gains along edges are all less than equal to 1 (Ay are attenuation
factors, so all are < 1), the formulation is a lossy network. A lossy network is a
generalized network where a flow can decrease as it goes through edges. Onaga
proved in [9] two theorems for the generalized max flow problem in a lossy network
as follows.
40
Theorem 2. A given flow is optimal if and only if the residual network
does not contain any flow-generating cycle from which the sink t is reachable.
Note that a flow can be optimal even if this is not the maximum flow. A
given flow is optimal if the way it is spread in the network minimizes losses along
the edges.
Theorem 3. If a flow is optimal then augmenting it on the highestgain
path in the residual network does not create any flow-generating cycle.
Note that the highest-gain path is the path P from s to t such
A(/J)E/> ' is maximized.
The residual network [10] represents the possibility on every edges of
pushing back flows. If there is the set of reverse edges E = {(j> /) / (jj) e V) and for
every edge the gain function y(j, i) = \/y(i, j). If a residual graph Gr(V, Er) is
< -
associated with Er = {(/, j) e E \ fli, j) < c(z, j)} u {0, i) e E | c{i, j) > 0},
residual capacity functions are as follows:
c{i,j)-f{i,j) (i,j) eE,
crd.j)= < [14]
I r(j\i)f0>i) (i.f) e£-
(Q Finding the optimal max flow in a generalized network is then equivalent
to saturate the residual generalized network along highest-gain path. Consider the
following example (see FIG. 12) consisting of 3 trains 1, 2 and 3 producing
respectively 2, 3 and 4 units of energy and 3 trains A, B and C consuming
respectively 2, 4 and 3 units of energy: with along edges the capacity and the gain for
those different from 1.
Starting with a flow of 0, it is optimal and the residual network is equal to
the generalized network. Augmenting flow along highest-gain paths will allow to get
optimal max flow when there is no more augmenting path. State of art algorithms
41
now run in 0(E2 (E + Flog (V log B)) log B) with B the largest integer in the
representations of capacities and gains [10].
The heuristic consists in the idea of transferring the energy of each producer
to respective closest consumers in the line. By doing that, the transfer of energy is optimal
if producers are all independent from each other. Indeed, the choice of which producer will
transfer its energy first is randomized so global optimum can be not reached.
The algorithm works as follows:
1: while list_of_producers * 0 do
2: Choose one producer.
3: while producer energy > 0 do
4: if list_of_consumers = 0 then
^ ^ 5: finish
f P 6: Choose closest consumer.
7: if producer has more energy to transfer than consumer needs then
8: Transfer this amount and remove consumer off the list.
9: else
10: Transfer totality of remaining producer energy to the consumer.
11: Remove producer off the list.
12: finish
On a sample of 10000 timeslots, the computation of the real max flow problem
compared to the heuristic shows that in 83% of cases, the heuristic gives the same results. In
average, the results differ of 3%o. One can use this heuristic for the intermediate
computation of the max flow problems as it does not modify enough objective functions to
change, for example, the ranking of two different solutions.
The following relates to computation time on real data. Our model has
been tested with a one-hour time horizon, corresponding to 3600 timeslots,
^ 30 metros and 496 dwell times to optimize. The objective function has a
value 8544.4 a.u. at time to. After 450 iterations, total energy consumption is about
7884.5 a.u, that to say 7.7% saving.
However, a real metro line is subject to minor perturbations that can affect
the adherence to the timetable. To check the relevance of the optimization, a random
noise has been added on optimized dwell times to quantify the robustness of the
objective function. This noise consists in randomly modifying dwell times by ± Ss.
Noise (s) 1 3 6
42
Average on 7917.6 7984.4 8029.7
100 tries
(u.a.)
Saving (%) 7.3 6.6 6.0
Table H
Table H shows the results. There is even with 6 second noise. The
optimization is still saving 6.0% energy. This means that the optimized solution is
saving energy, but also all its neighbour solutions.
The following relates to computation times on the departure time
benchmark. It has been shown before that the problem can be classified as a (G, d,
^^ C-J) whereas the problem depicted in [7] is classified as (PP, D, C-nJ).
Actually the data model as well as its implementation allows computation of the
latter formulation. Slight modifications are done to the data model to compute this
problem. In these modifications, it is possible to show the change of the objective
function (3) into:
minmax v,
'•r [21]
Indeed, the objective in [7] is to minimize the energy peak, i.e. minimize the energy
consumption of the timeslot of the time period where the energy consumption is
maximum.
™ Additionally, regenerative energy is not considered in implementation
even if the data model was taking it into account. There is then no need to use any
attenuation matrix compiling Joule's effect as no energy transfer is possible. In [6]
though, regenerative energy can be transferred in totality to an train consuming
energy as long as the two trains are physically in the same electric sub station
network. In this model, electric sub stations are not coupled and it is impossible to
transfer energy from a point in the line belonging to an electric sub station to a point
belonging to another one. The implementation can model that introducing in the
attenuation matrix this topology as follows:
if / andy belong to the some electric sub station,
4
43
[22]
0 otherwise.
These modifications allow to compute the initial objective function value
based on the data given in [7]. However, the searching method using a genetic
algorithm fails in optimizing this value. It is understandable in the fact that the
genetic algorithm modifies globally the different parameters when an efficient
heuristic can choose to modify variables which impact the timeslot where the
energy peak is. Some techniques give a heuristic searching expressly to energy
peaks and trying to smooth such peaks.
4fc The aforementioned systems, components, architectures, environments
(e.g., corner protection member, side protection member, protection system, etc.), and
the like have been described with respect to interaction between several components
and/or elements. Such devices and elements can include those elements or subelements
specified therein, some of the specified elements or sub-elements, and/or
additional elements. Further yet, one or more elements and/or sub-elements may be
combined into a single component to provide aggregate functionality. The elements
may also interact with one or more other elements not specifically described herein
for the sake of brevity, but known by those of skill in the art.
In view of the exemplary devices and elements described supra,
methodologies that may be implemented in accordance with the disclosed subject
matter will be better appreciated with reference to the flow chart of FIG. 8. While for
purposes of simplicity of explanation, the methodologies are shown and described as
a series of blocks, the claimed subject matter is not limited by the order of the blocks,
as some blocks may occur in different orders and/or concurrently with other blocks
from what is depicted and described herein. Moreover, not all illustrated blocks may
be required to implement the methods described hereinafter.
FIG. 8 illustrates a flow chart of an exemplary embodiment of a method
500. At reference numeral 810, a default timetable can be received in an offline
mode, wherein the default timetable can be associated with a time schedule for two or
more vehicles and at least one location. At reference numeral 820, the default
timetable can be adjusted by modifying at least one of a departure time of a vehicle, a
44
dwell time of a vehicle, or a speed profile of a vehicle to estimate an overlap for a
brake time for a first vehicle and an acceleration time for a second vehicle in the
offline mode. At reference numeral 830, the modified default timetable can be
employed in real time for the two or more vehicles and the location. At reference
numeral 840, a portion of energy can be transferred from the first vehicle to the
second vehicle based upon the modified default timetable in real time. At reference
numeral 850, the adjusted default timetable can be updated in real time to synchronize
a brake time for a vehicle and an acceleration time for a vehicle by changing at least
of a departure time of a vehicle, a dwell time of a vehicle, or a speed profile of a
vehicle.
^fe The method can further include controlling the first vehicle or the second
vehicle with a control signal based on the modified default timetable in real time. The
method can further include tracking the vehicles in comparison with at least one of the
modified timetable or a measured amount of energy, monitoring a threshold value
related to the measured amount of energy, and updating the modified timetable based
upon the threshold value or the tracking of the vehicles.
In the specification and claims, reference will be made to a number of
terms that have the following meanings. The singular forms "a", "an" and "the"
include plural referents unless the context clearly dictates otherwise. Approximating
language, as used herein throughout the specification and claims, may be applied to
modify any quantitative representation that could permissibly vary without resulting
^ in a change in the basic function to which it is related. Accordingly, a value modified
by a term such as "about" is not to be limited to the precise value specified. In some
instances, the approximating language may correspond to the precision of an
instrument for measuring the value. Similarly, "free" may be used in combination
with a term, and may include an insubstantial number, or trace amounts, while still
being considered free of the modified term. Moreover, unless specifically stated
otherwise, any use of the terms "first," "second," etc., do not denote any order or
importance, but rather the terms "first," "second," etc., are used to distinguish one
element from another.
As used herein, the terms "may" and "may be" indicate a possibility of an
occurrence within a set of circumstances; a possession of a specified property,
45
characteristic or function; and/or qualify another verb by expressing one or more of an
ability, capability, or possibility associated with the qualified verb. Accordingly,
usage of "may" and "may be" indicates that a modified term is apparently appropriate,
capable, or suitable for an indicated capacity, function, or usage, while taking into
account that in some circumstances the modified term may sometimes not be
appropriate, capable, or suitable. For example, in some circumstances an event or
capacity can be expected, while in other circumstances the event or capacity cannot
occur - this distinction is captured by the terms "may" and "may be."
This written description uses examples to disclose the invention, including
the best mode, and also to enable one of ordinary skill in the art to practice the
^ k invention, including making and using any devices or systems and performing any
incorporated methods. The patentable scope of the invention is defined by the claims,
and may include other examples that occur to one of ordinary skill in the art. Such
other examples are intended to be within the scope of the claims if they have
structural elements that do not different from the literal language of the claims, or if
they include equivalent structural elements with insubstantial differences from the
literal language of the claims.
46
PARTS LIST
100 system
110 timetable
120 data collector
130 modify component
140 optimized timetable
150 vehicles
200 system
210 model generator
300 system
^fc 310 controller
400 system
410 monitor
420 trigger
430 modify component
500 graph
510 first terminal
520 second terminal
530 traction energy
540 regenerative energy
600 graph
^ 610 first train traction energy
620 first train regenerative energy
630 second train traction energy
640 second train regenerative energy
700 graph
800 method
810 method step
820 method step
830 method step
840 method step
850 method step
47
We claim:
1. A system, comprising:
a first component configured to receive a timetable associated with two or
more vehicles and at least one terminal; and
a second component configured to modify a parameter associated with at least
one of a first vehicle or a second vehicle of the two or more vehicles to create a
modified timetable that overlaps a brake time for the first vehicle and an acceleration
time for the second vehicle.
^ t 2. The system of claim 1, wherein the parameter is at least one of a departure
time of the first vehicle or the second vehicle, a dwell time of the first vehicle or the
second vehicle, or a speed profile of the first vehicle or the second vehicle.
3. The system of claim 1, wherein the second vehicle is configured to transfer a
portion of energy from the first vehicle based upon at least one of the modified
timetable and the brake time overlapping with the acceleration time.
4. The system of claim 1, wherein the second component is configured to modify
the parameter associated with at least one of the first vehicle or the second vehicle to
create the modified timetable that overlaps a brake time for the second vehicle and an
acceleration time for the first vehicle.
5. The system of claim 4, where the first vehicle is configured to transfer a
portion of energy from the second vehicle based upon at least one of the modified
timetable and the brake time for the second vehicle overlapping with the acceleration
time for the first vehicle.
48
6. The system of claim 1, further comprising:
a third component configured to aggregate a static input related to at least one
of the two or more vehicles, the terminal, an energy model, or a quality of service
constraint; and
the second component further configured to create the modified timetable that
overlaps the brake time for the first vehicle and the acceleration time of the second
vehicle based on the static input.
7. The system of claim 1, further comprising:
^fc a fourth component configured to aggregate a dynamic input related to at least
one of the two or more vehicles, the terminal, an in-use dwell time for the first vehicle
or the second vehicle, an in-use departure time for the first vehicle or the second
vehicle, or an in-use speed profile for the first vehicle or the second vehicle; and
the second component further configured to create the modified timetable that
overlaps the brake time for the first vehicle and the acceleration time of the second
vehicle based on the static input.
8. The system of claim 1, further comprising:
a fifth component configured to create at least one energy model to represent a
portion of energy used by at least one of the terminal, the first vehicle, or the second
vehicle; and
^ the second component further configured to create the modified timetable that
overlaps the brake time for the first vehicle and the acceleration time of the second
vehicle based on the at least one energy model.
9. The system of claim 8, wherein the at least one energy model relates to at least
one of a network topology for the terminal, an energy transportation between at least
two of the first vehicle, the second vehicle, and a track for the first vehicle or the
second vehicle, an ohmic resistance loss, or an equipment loss.
49
10. The system of claim 1, further comprising a controller that is configured to
generate and communicate a control signal to the first vehicle or the second vehicle
based on the modified timetable, wherein the control signal is used with an automated
control of the first vehicle or the second vehicle or a manual control of the first
vehicle or the second vehicle.
11. The system of claim 10, further comprising a sixth component that is
configured to implement a buffer time to compensate for a human reaction time delay
related to implementing the control signal for the first vehicle or the second vehicle.
4 k 12. The system of claim 1, wherein the second component is configured to create
the modified timetable in an offline environment that corresponds to data
representative of the terminal.
13. The system of claim 12, wherein the second component is configured to
employ the modified timetable created in the offline environment within an online
environment of the terminal.
14. A method, comprising:
receiving a default timetable in an offline mode associated with a time
schedule for two or more vehicles and at least one location;
adjusting the default timetable by modifying at least one of a departure time
^ associated with the two or more vehicles, a dwell time associated with the two or
more vehicles, or a speed profile associated with the two or more vehicles to estimate
an overlap for a brake time for a first vehicle of the two or more vehicles and an
acceleration time for a second vehicle of the two or more vehicles in the offline mode;
employing the adjusted default timetable in real time for the two or more
vehicles and the location;
transferring a portion of energy from the first vehicle to the second vehicle
based upon the adjusted default timetable in real time; and
updating the adjusted default timetable in real time to synchronize a brake
time associated with the two or more vehicles and an acceleration time associated
50
':
with the two or more vehicles by changing at least of a departure time associated with
the two or more vehicles, a dwell time associated with the two or more vehicles, or a
speed profile associated with the two or more vehicles.
15. The method of claim 14, further comprising controlling the first vehicle or the
second vehicle with a control signal based on the adjusted default timetable in real
time.
16. The method of claim 15, further comprising:
tracking the two or more vehicles in comparison with at least one of the
^ft adjusted timetable or a measured amount of energy;
monitoring a threshold value related to the measured amount of energy; and
updating the adjusted timetable based upon the threshold value or the tracking
of the vehicles.
17. A system, comprising,
a timetable associated with a first vehicle, a second vehicle, and a terminal,
wherein the timetable comprises a schedule of a time that the first vehicle and the
second vehicle are at least one of arriving or departing the terminal; and
a modify component configured to adjust the timetable to synchronize a brake
duration of the first vehicle with an acceleration duration of the second vehicle for the
^ ^ terminal.
18. The system of claim 17, wherein the timetable includes at least one of a first
vehicle dwell time for the terminal, a first vehicle departure time for the terminal, or a
first vehicle speed profile related to the terminal and the first vehicle.
19. The system of claim 18, wherein the timetable includes at least one of a
second vehicle dwell time for the terminal, a second vehicle departure time for the
terminal, or a second vehicle speed profile related to the terminal and the second
vehicle.
51
20. The system of claim 19, wherein the second vehicle is configured to transfer a