Sign In to Follow Application
View All Documents & Correspondence

A Method Of Operating An N Way Power Combiner Network And An N Way Power Combiner Network

Abstract: Method of operating a power combiner network (1), the power combiner network (1) comprising a power combiner device (10) having N secondary ports (11(1, 2, N)) combining into one primary port (12), wherein respective N secondary port (11(1, 2,..., N)) is provided with a phase shifter arrangement (13) and a load control arrangement (14). Respective phase shifter arrangement (13) is configured to set a phase of a signal fed through respective N secondary port (11(1, 2,..., N)). Respective load control arrangement (14) is configured to set the N secondary ports (11(1, 2,..., N)) in an active or in an inactive operation mode. For I inactive secondary ports (11(1)) the load control arrangement (14) is further configured to set a phase of the signal reflected from the I inactive secondary ports (11(1)). The method comprises the method steps of; step A (100), selecting which of the N secondary ports (11(1, 2,..., N)) that should be set in an inactive operation mode and which of the N secondary ports (11(1, 2,..., N)) that should be set in an active operation mode, step B (110), setting selected I inactive secondary ports (11(1)) in an inactive operation mode by means of the load control arrangement (14), step C (120), retrieving a phase required for respective I inactive secondary port (11(1)) and retrieving a phase required for respective A active secondary port (11(2)) in order for respective A active secondary port (11(2)) to minimize the reflected signal from the power combiner device (10) and provide desired power to the primary port (12), step D (130), setting respective load control arrangement (14) for respective I inactive secondary port (11(1)) according to respective retrieved phase, and step E (140), setting respective phase shifter arrangement (13) for respective A active secondary port (11(2)) according to respective retrieved phase.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
18 February 2021
Publication Number
09/2021
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
samuel@sandhpartners.com
Parent Application
Patent Number
Legal Status
Grant Date
2024-05-02
Renewal Date

Applicants

SAAB AB
581 88 Linköping

Inventors

1. ISACSSON, Magnus
Smörgatan 74 412 76 Göteborg

Specification

Documents

Application Documents

# Name Date
1 202147006909-IntimationOfGrant02-05-2024.pdf 2024-05-02
1 202147006909-STATEMENT OF UNDERTAKING (FORM 3) [18-02-2021(online)].pdf 2021-02-18
2 202147006909-PatentCertificate02-05-2024.pdf 2024-05-02
2 202147006909-FORM 1 [18-02-2021(online)].pdf 2021-02-18
3 202147006909-FORM 3 [14-03-2024(online)].pdf 2024-03-14
3 202147006909-DRAWINGS [18-02-2021(online)].pdf 2021-02-18
4 202147006909-Information under section 8(2) [26-12-2023(online)].pdf 2023-12-26
4 202147006909-DECLARATION OF INVENTORSHIP (FORM 5) [18-02-2021(online)].pdf 2021-02-18
5 202147006909-FORM 3 [17-10-2023(online)].pdf 2023-10-17
5 202147006909-COMPLETE SPECIFICATION [18-02-2021(online)].pdf 2021-02-18
6 202147006909-Proof of Right [10-03-2021(online)].pdf 2021-03-10
6 202147006909-Information under section 8(2) [14-06-2023(online)].pdf 2023-06-14
7 202147006909-FORM-26 [10-03-2021(online)].pdf 2021-03-10
7 202147006909-CLAIMS [17-04-2023(online)].pdf 2023-04-17
8 202147006909-FORM 3 [10-06-2021(online)].pdf 2021-06-10
8 202147006909-DRAWING [17-04-2023(online)].pdf 2023-04-17
9 202147006909.pdf 2021-10-18
9 202147006909-FER_SER_REPLY [17-04-2023(online)].pdf 2023-04-17
10 202147006909-FORM 3 [06-01-2022(online)].pdf 2022-01-06
10 202147006909-OTHERS [17-04-2023(online)].pdf 2023-04-17
11 202147006909-FER.pdf 2022-11-18
11 202147006909-FORM 3 [17-06-2022(online)].pdf 2022-06-17
12 202147006909-FORM 18 [28-07-2022(online)].pdf 2022-07-28
13 202147006909-FER.pdf 2022-11-18
13 202147006909-FORM 3 [17-06-2022(online)].pdf 2022-06-17
14 202147006909-FORM 3 [06-01-2022(online)].pdf 2022-01-06
14 202147006909-OTHERS [17-04-2023(online)].pdf 2023-04-17
15 202147006909-FER_SER_REPLY [17-04-2023(online)].pdf 2023-04-17
15 202147006909.pdf 2021-10-18
16 202147006909-DRAWING [17-04-2023(online)].pdf 2023-04-17
16 202147006909-FORM 3 [10-06-2021(online)].pdf 2021-06-10
17 202147006909-CLAIMS [17-04-2023(online)].pdf 2023-04-17
17 202147006909-FORM-26 [10-03-2021(online)].pdf 2021-03-10
18 202147006909-Information under section 8(2) [14-06-2023(online)].pdf 2023-06-14
18 202147006909-Proof of Right [10-03-2021(online)].pdf 2021-03-10
19 202147006909-COMPLETE SPECIFICATION [18-02-2021(online)].pdf 2021-02-18
19 202147006909-FORM 3 [17-10-2023(online)].pdf 2023-10-17
20 202147006909-Information under section 8(2) [26-12-2023(online)].pdf 2023-12-26
20 202147006909-DECLARATION OF INVENTORSHIP (FORM 5) [18-02-2021(online)].pdf 2021-02-18
21 202147006909-FORM 3 [14-03-2024(online)].pdf 2024-03-14
21 202147006909-DRAWINGS [18-02-2021(online)].pdf 2021-02-18
22 202147006909-PatentCertificate02-05-2024.pdf 2024-05-02
22 202147006909-FORM 1 [18-02-2021(online)].pdf 2021-02-18
23 202147006909-STATEMENT OF UNDERTAKING (FORM 3) [18-02-2021(online)].pdf 2021-02-18
23 202147006909-IntimationOfGrant02-05-2024.pdf 2024-05-02

Search Strategy

1 202147006909E_18-11-2022.pdf

ERegister / Renewals

3rd: 30 May 2024

From 29/08/2020 - To 29/08/2021

4th: 30 May 2024

From 29/08/2021 - To 29/08/2022

5th: 30 May 2024

From 29/08/2022 - To 29/08/2023

6th: 30 May 2024

From 29/08/2023 - To 29/08/2024

7th: 11 Jul 2024

From 29/08/2024 - To 29/08/2025

8th: 14 Jul 2025

From 29/08/2025 - To 29/08/2026