A shear (10) for subdividing an elongated product (R) movinglongitudinally in a plane (PH), said shear comprising:leader and follower blades (28, 24) mounted for rotation about parallel axes located on opposite sides of said plane, said blades being arranged to coact in a radially overlapping relationship at a cutting zone (Zi) located between said axes and spaced vertically from said plane, the radius of rotation (RL) of said leader blade being longer than the radius of rotation (RF) of said follower blade;means for continuously rotating said blades at equal angular velocities, with said leader blade preceding said follower blade in said cutting zone; andswitch means (30) located upstream of said cutting zone, said switch means being operable in a first mode to direct said product along a path bypassing said cutting alone, and being operable in a second mode to divert said product from said path into said cutting zone for cutting by said blades into leading and trailing segments, characterized by said blades being configured and arranged to deflect the tail end of said leading segment away form said plane while directing the front end of said trailing segment toward said plane.
| # | Name | Date |
|---|---|---|
| 1 | 304-mum-2000-correspondence(28-03-2006).pdf | 2006-03-28 |
| 2 | 304-mum-2000-correspondence(ipo)-(23-01-2007).pdf | 2007-01-23 |
| 3 | 304-MUM-2000-CORRESPONDENCE(RENEWAL PAYMENT LETTER)-(28-03-2008).pdf | 2008-03-28 |
| 4 | 304-MUM-2000-CORRESPONDENCE(IPO)-(14-10-2010).pdf | 2010-10-14 |
| 5 | 304-MUM-2000-CORRESPONDENCE(RENEWAL PAYMENT LETTER)-(30-03-2011).pdf | 2011-03-30 |
| 6 | 304-MUM-2000-FORM 16(16-11-2011).pdf | 2011-11-16 |
| 7 | 304-MUM-2000-CORRESPONDENCE-(25-03-2015).pdf | 2015-03-25 |
| 8 | Form 27 [18-03-2017(online)].pdf | 2017-03-18 |
| 9 | 304-MUM-2000-RELEVANT DOCUMENTS [24-02-2018(online)].pdf | 2018-02-24 |
| 10 | 304-MUM-2000-SPECIFICATION(AMENDED)-(4-10-2005).pdf | 2018-08-08 |
| 11 | 304-mum-2000-power of authority(6-9-2000).pdf | 2018-08-08 |
| 12 | 304-mum-2000-power of authority(4-10-2005).pdf | 2018-08-08 |
| 13 | 304-mum-2000-petition under rule 138(4-10-2005).pdf | 2018-08-08 |
| 14 | 304-MUM-2000-FORMAL DRAWING(26-6-2000).pdf | 2018-08-08 |
| 15 | 304-mum-2000-form 5(3-4-2000).pdf | 2018-08-08 |
| 16 | 304-MUM-2000-FORM 3(4-10-2005).pdf | 2018-08-08 |
| 17 | 304-mum-2000-form 3(4-10-2003).pdf | 2018-08-08 |
| 18 | 304-mum-2000-form 3(30-8-2000).pdf | 2018-08-08 |
| 19 | 304-mum-2000-form 3(3-4-2000).pdf | 2018-08-08 |
| 20 | 304-MUM-2000-FORM 26(26-3-2010).pdf | 2018-08-08 |
| 21 | 304-mum-2000-form 2(title page)-(granted)- (23-1-2007).pdf | 2018-08-08 |
| 22 | 304-MUM-2000-FORM 2(TITLE PAGE)-(3-4-2000).pdf | 2018-08-08 |
| 23 | 304-mum-2000-form 2(granted)-(4-10-2005).pdf | 2018-08-08 |
| 25 | 304-mum-2000-form 2(granted)- (23-1-2007).pdf | 2018-08-08 |
| 26 | 304-MUM-2000-FORM 2(COMPLETE)-(3-4-2000).pdf | 2018-08-08 |
| 27 | 304-mum-2000-form 19(29-4-2004).pdf | 2018-08-08 |
| 28 | 304-mum-2000-form 1(3-4-2000).pdf | 2018-08-08 |
| 29 | 304-mum-2000-drawing(granted)-(23-1-2007).pdf | 2018-08-08 |
| 30 | 304-mum-2000-drawing(3-4-2000).pdf | 2018-08-08 |
| 31 | 304-mum-2000-description(granted)-(23-1-2007).pdf | 2018-08-08 |
| 32 | 304-MUM-2000-DESCRIPTION(COMPLETE)-(3-4-2000).pdf | 2018-08-08 |
| 33 | 304-MUM-2000-CORRESPONDENCE(RENEWAL PAYMENT LETTER)-(30-3-2012).pdf | 2018-08-08 |
| 34 | 304-MUM-2000-CORRESPONDENCE(IPO)-(28-3-2007).pdf | 2018-08-08 |
| 35 | 304-MUM-2000-CORRESPONDENCE(26-3-2010).pdf | 2018-08-08 |
| 36 | 304-mum-2000-claims(granted)-(23-1-2007).pdf | 2018-08-08 |
| 37 | 304-MUM-2000-CLAIMS(3-4-2000).pdf | 2018-08-08 |
| 38 | 304-mum-2000-claim(granted)-(4-10-2005).pdf | 2018-08-08 |
| 40 | 304-mum-2000-cancelled page(4-10-2005).pdf | 2018-08-08 |
| 41 | 304-MUM-2000-ABSTRACT(3-4-2000).pdf | 2018-08-08 |
| 42 | 304-MUM-2000-RELEVANT DOCUMENTS [22-03-2019(online)].pdf | 2019-03-22 |
| 43 | 204204- FORM 27- 2012.pdf | 2024-02-29 |