Sign In to Follow Application
View All Documents & Correspondence

A System And A Method For Lean Methodology Implementation In Information Technology

Abstract: Disclosed is method and systemfor providing resolution to a ticket in a lean information technology framework. In one implementation the method comprises configuring a activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. Further, receiving a ticket for resolution from a customer in the information technology framework, wherein the ticket comprises an issue, an error and a problem. Furthermore, classifying ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database. Subsequently, assigning the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework, wherein the low complexity ticket team is one of a cross functional and cross technology team.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
04 September 2015
Publication Number
39/2015
Publication Type
INA
Invention Field
COMPUTER SCIENCE
Status
Email
ip@legasis.in
Parent Application

Applicants

HCL Technologies Limited
B-39, Sector 1, Noida 201 301, Uttar Pradesh, India

Inventors

1. SAXENA, Vikas
HCL Technologies Limited, Ground Floor, Software Tower II, HCL Technology Hub, Plot No 3A, Sector 126, Noida - 201303, Uttar Pradesh, India
2. SINGH, Shailender
HCL Technologies Limited, Ground Floor, Software Tower II, HCL Technology Hub, Plot No 3A, Sector 126, Noida - 201303, Uttar Pradesh, India
3. SINGROHA, Pradeep
HCL Technologies Limited, Ground Floor, Software Tower II, HCL Technology Hub, Plot No 3A, Sector 126, Noida - 201303, Uttar Pradesh, India

Specification

TECHNICAL FIELD
[001] The present subject matter described herein, in general, relates to a system and a method for lean information technology framework, and more particularly a system and a method for providing a resolution to a ticket in a lean information technology framework.
BACKGROUND
[002] Computers and software have become critical tools in today's information based society. Moreover, computers and software have provided tools to users to greatly increase work efficiencies. However, with the advantages provided by computers and software come technical problems associated with the computers and software applications. A typical solution to a computer and/or software technical problem is to contact technical support service of the company that provided the computer and/or software.
[003] Now a day one of the challenges faced by any information technology company providing the computer and/or software relates to conventional delivery model of the support services. Further, the conventional support services delivery models are also facing the challenge to optimize the resource utilization across the company. In particular, a conventional delivery model fails at enabling accurate mapping of human resources, work experience, skill and work complexity to provide effective support services.
[004] Generally, support services delivery models comprise technical support departments.Technical support departments are typically organized in a silo structure. More particularly, the silo structure is based on having a large number of specialists/subject matter expertssegmented based on technology or industry. Such segmentation acts as a road block, because substantial amount of time is required to identify the team with the know-how in order to attempt to resolve the reported problem. The silo structure moreover restricts development of cross functional experience development of human resources. To add to it, there are unprecedented challenges in predicting the demand of resources or the amount of problems that may be reported in a given amount of time. The unpredictability thus makes precise capacity and sizing more difficult increasing the financial burden on the company.

SUMMARY
[005] Before the present system(s) and methods, are described, it is to be understood that this application is not limited to the particular system(s), and methodologies described, as there can be multiple possible embodiments which are not expressly illustrated in the present disclosures. It is also to be understood that the terminology used in the description is for the purpose of describing the particular implementations or versions or embodiments only, and is not intended to limit the scope of the present application. This summary is provided to introduce aspects related to a system and a method for facilitating electronic learning of avoiding human errors within an organization.This summary is not intended to identify essential features of the claimed subject matter nor is it intended for use in determining or limiting the scope of the claimed subject matter.
[006] In one implementation, a system for providing a resolution to a ticket in a lean information technology framework is disclosed. In one aspect, the systemmayconfigure an activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. Upon configuring the activity complexity database, the system may receive a ticket for resolution from a customer in the information technology framework. The ticket may comprise at least one of an issue, an error and a problem being faced by the customer. Further to receiving the ticket, the system may classify the ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database. Subsequently, the system may assign the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework. The low complexity ticket team is at least one of a cross functional and cross technology team.
[007] In another implementation, a method forproviding a resolution to a ticket in a lean information technology framework is disclosed.In one aspect, the method may comprise configuring an activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. Upon configuring the activity complexity database, the method may further comprise receiving a ticket for resolution from a customer in the information technology framework. The ticket may comprise at least one of an issue, an error and a problem being faced by the customer. Further to receiving the ticket, the method may further comprise classifying the ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database. Subsequently, the method may further comprise assigning the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework. The low complexity ticket team is at least one of a cross functional and cross technology team.
[008] In yet another implementation, non-transitory computer readable medium embodying a program executable in a computing device for providing a resolution to a ticket in a lean information technology framework is disclosed.The program may comprise a program code forobtaining first input data for one or more industry segments and one or more technology tracks, wherein the first input data comprises historical activities data, activities resolution trend data, activities time to resolve data, and activities average monthly volume. The program may comprise a program code for identifying the one or more low complexity activities for each of the industry segments and technology tracks based on the first input data and a predefined activities identification criterion, wherein the predefined activities identification criteria comprises type of environment, impact on environment, and time to resolve the activities. The program may comprise a program code for configuring an activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. The program may comprise a program code for receiving a ticket for resolution from a customer in the information technology framework, wherein the ticket comprises at least one of an issue, an error and a problem being faced by the customer. The program may comprise a program code for classifying the ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database. The program may comprise a program code for assigning the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework, wherein the low complexity ticket team is at least one of a cross functional and cross technology team. The program may comprise a program code for generating the resolution based on a low complexity resolution process for providing the resolution to the ticket, wherein the low complexity resolution process is executed by the low complexity ticket team.
BRIEF DESCRIPTION OF THE DRAWINGS
[009] The foregoing detailed description of embodiments is better understood when read in conjunction with the appended drawings. For the purpose of illustrating of the present subject matter, an example of construction of the present subject matter is provided as figures; however, the invention is not limited to the specific method and system disclosed in the document and the figures.
[010] The present subject matter is described detail with reference to the accompanying figures. In the figures, the left-most digit(s) of a reference number identifies the figure in which the reference number first appears. The same numbers are used throughout the drawings to refer various features of the present subject matter.
[011] Figure 1 illustrates a network implementation of a systemforproviding a resolution to a ticket in a lean information technology framework, in accordance with an embodiment of the present subject matter.
[012] Figure 2 illustrates the system for providing a resolution to the ticket in the lean information technology framework, in accordance with an embodiment of the present subject matter.
[013] Figure 3 illustrates a method for providing a resolution to the ticket in the lean information technology framework, in accordance with an embodiment of the present subject matter.
DETAILED DESCRIPTION
[014] Some embodiments of this disclosure, illustrating all its features, will now be discussed in detail. The words "comprising," "having," "containing," and "including," and other forms thereof, are intended to be equivalent in meaning and be open ended in that an item or items following any one of these words is not meant to be an exhaustive listing of such item or items, or meant to be limited to only the listed item or items. It must also be noted that as used herein and in the appended claims, the singular forms "a," "an," and "the" include plural references unless the context clearly dictates otherwise. Although any system and methods similar or equivalent to those described herein can be used in the practice or testing of embodiments of the present disclosure, the exemplary, system and methods are now described. The disclosed embodiments are merely examples of the disclosure, which may be embodied in various forms. Various modifications to the embodiment will be readily apparent to those skilled in the art and the generic principles herein may be applied to other embodiments. However, one of ordinary skill in the art will readily recognize that the present disclosure is not intended to be limited to the embodiments described, but is to be accorded the widest scope consistent with the principles and features described herein.
[015] In an implementation,a system and method for providing a resolution to a ticket in a lean information technology framework, is described. In the implementation, an activity complexity database may be configured. The activity complexity database may be configured based on a plurality of low complexity activities. In one example, the low complexity activities may be identified across industry segments, for example pharmaceutical, automobile and like. In one other example, the low complexity activities may be identified across technology tracks, for example UNIX™, Windows™ and like.
[016] In the implementation, upon configuring the activity complexity database, a ticket for resolution from a customer may be received. In one example, the ticket may comprise an issue, an error and a problem being faced by the customer, for example password not working.
[017] In the implementation, further to receiving the ticket, the ticket may be classified as a low complexity activity or a non-low complexity activity. In one example, the classification may be based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database.
[018] In the implementation, subsequent to classification of the ticket, the ticket if classified as the low complexity activity may be assigned to a low complexity ticket team for providing a resolution to the ticket. Further, the low complexity ticket team is a cross functional or cross technology team.
[019] In the implementation, further to assigning of the ticket, the resolutionmay be generated. In one example, the resolution may be generated based on a low complexity resolution process for providing the resolution to the ticket. Further, the low complexity resolution process may be executed by the low complexity ticket team.
[020] Referring now to Figure 1, a network implementation of a system 102 for providing a resolution to a ticket in a lean information technology framework, in accordance with an embodiment of the present subject matter may be described.In one embodiment, the present subject matter is explained considering that the system 102 may be implemented as a standalone system connects to a network. It may be understood that the system 102 may also be implemented in a variety of computing systems, such as a laptop computer, a desktop computer, a notebook, a workstation, a mainframe computer, a server, a network server, a cloud-based computing environment and the like.
[021] In one implementation, the system 102 may comprise the cloud-based computing environment in which the user may operate individual computing systems configured to execute remotely located applications. In another embodiment, the system 102 may also be implemented on client devices, hereinafter referred to as a user device 104. It may be understood that the system implemented on the client device supports a plurality of browsers and all viewports. Examples of the plurality of browsers may include, but not limited to, Chrome™, Mozilla™, Internet Explorer™, Safari™, and Opera™. It will also be understood that the system 102 may be accessed by multiple users through one or more user devices 104-1, 104-2 … and 104-N, collectively referred to as user devices 104 hereinafter, or applications residing on the user devices 104. Examples of the user devices 104 may include, but are not limited to, a portable computer, a personal digital assistant, a handheld device, and a workstation. The user devices 104 are communicatively coupled to the system 102 through a network 106.
[022] In one implementation, the network 106 may be a wireless network, a wired network or a combination thereof. The network 106 can be implemented as one of the different types of networks, such as intranet, local area network (LAN), wide area network (WAN), the internet, and the like. The network 106 may either be a dedicated network or a shared network. The shared network represents an association of the different types of networks that use a variety of protocols, for example, Hypertext Transfer Protocol (HTTP), Transmission Control Protocol/Internet Protocol (TCP/IP), Wireless Application Protocol (WAP), and the like, to communicate with one another. Further the network 106 may include a variety of network devices, including routers, bridges, servers, computing devices, storage devices, and the like.
[023] Referring now to Figure 2 the system102 for providing a resolution to a ticket in a lean information technology framework is illustrated in accordance with an embodiment of the present subject matter. In one embodiment, the system102 may include at least one processor 202, an input/output (I/O) interface 204, and a memory 206. The at least one processor 202 may be implemented as one or more microprocessors, microcomputers, microcontrollers, digital signal processors, central processing units, state machines, logic circuitries, and/or any devices that manipulate signals based on operational instructions. Among other capabilities, the at least one processor 202 may be configured to fetch and execute computer-readable instructions stored in the memory 206.
[024] The I/O interface 204 may include a variety of software and hardware interfaces, for example, a web interface, a graphical user interface, and the like. The I/O interface 204 may allow the system102 to interact with the user directly or through the client devices 104. Further, the I/O interface 204 may enable the system102 to communicate with other computing devices, such as web servers and external data servers (not shown). The I/O interface 204 can facilitate multiple communications within a wide variety of networks and protocol types, including wired networks, for example, LAN, cable, etc., and wireless networks, such as WLAN, cellular, or satellite. The I/O interface 204 may include one or more ports for connecting a number of devices to one another or to another server.
[025] The memory 206 may include any computer-readable medium or computer program product known in the art including, for example, volatile memory, such as static random access memory (SRAM) and dynamic random access memory (DRAM), and/or non-volatile memory, such as read only memory (ROM), erasable programmable ROM, flash memories, hard disks, optical disks, and magnetic tapes. The memory 206 may include modules 208 and data 210.
[026] The modules 208 include routines, programs, objects, components, data structures, etc., which perform particular tasks or implement particular abstract data types. In one implementation, the modules 208 may include anactivity complexity module212, a teammodule 214, awork processmodule 216, a resolution module 218 andanother module 220. The other modules 220 may include programs or coded instructions that supplement applications and functions of the system102. The modules 208 described herein may be implemented as software modules that may be executed in the cloud-based computing environment of the system102.
[027] The memory 206, amongst other things, serves as a repository for storing data processed, received, and generated by one or more of the modules 208. The memory 206 may include data generated as a result of the execution of one or more modules in the other module 220.In one implementation, the memory may include data 210. Further, the data 210 may include a systemdata 222 for storing data processed, received, and generated by one or more of the modules 208. Furthermore, the data 210 may include other data 224 for storing data generated as a result of the execution of one or more modules in the other module 220.
ACTIVITY COMPLEXITY MODULE 212
[028] In one implementation, the activity complexity module 212 may obtain first input data. In one example the first input data may comprise historical activities data, activities resolution trend data, activities time to resolve data, and activities average monthly volume data. In one example activities may be understood as the actions to be performed for support and maintenance of a software product.In the implementation the activity complexity module 212 may obtain first input data store the first input data in system data 222. In one example, activities trend may be 5 activities on every Monday, activities time to resolve may be 30 min per activity and activities average monthly volume may be 600 activities per month.

[029] Further to obtaining, the activity complexity module 212 may identifythe one or more low complexity activities for each of the industry segments and technology tracks based on the first input data and a predefined activities identification criterion.In one example, industry segments may be manufacturing, automobile, telecommunication, and pharmaceutical. In one other example, technology tracks may beLINUX™, UNIX™, CTRIX™, network,servers, backup, storage, exchange, tools, command center, account management, SAP™ basis and the like. The predefined activities identification criteria may comprises type of environment, impact on environment or client business, and time to resolve the activities.In one example, type of environment may be a production environment, a non-production environment, a client environment, impact on environment client business may be high medium or low, and time to resolve the activity may be 30 min. Table 1-20 lists the examples of low complexity activities identified from the activities data for various technology areas. In the implementation the activity complexity module 212 may identify the one or more low complexity activities and store the one or more low complexity activities in system data 222.
Table 1: Examples of low complexity activity in Wintel

Sl. No Activity/Category/Task Example of Ticket Summary
1 Space issue Additional space required on SERVERNAME. M:\SQLData1 and M:\SQLTempDB
2 Documentation tasks Adding servers to password database
3 Reboot Activity Critical-Unknown-BootAlarm: Computer has been rebooted at 2013.11.8 14:21:11
4 Restart services Restart the windows services on SERVERNAME
5 Device down SERVERNAME is not accessible,
SERVERNAME Host Down 30-09-2013 21:13:13
6 Account Management/provisioning Account locked Inlab access issue,
Please create user access for service account CED\CED-EnCaseApp in following servers
7 Shared Drive Access Shared Drive Request for Access,
Access to FTP and Phoenix Shared Drive - Kevin Burns
8 Server build VM Build request - assign to Windows Team ref Wilco
New server build for server : SERVERNAME
9 Printer management (ex; create/remove, clear map printer etc.) New Zebra Printer Setup,
Set Printer queues spooler setting to start printing after last page spooled,
Printer Creation Request
10 Decommission Request SAMPLE CHANGE REQUEST00009914- Decommission of Servers SERVERNAME and SERVERNAME,
Decommission of server " SERVERNAME " - SAMPLE CHANGE REQUEST00013305
11 Grant/Remove Access Issue/Request Access on g_MapClientDrives,
access to \\ SERVERNAME\AduanaSoft and \\ SERVERNAME\AduanaSoft
12 Create/delete share folder CREATE A SHARED FOLDER,
Need to setup a shared folder on TR.IZM.GZMIR NAS in Mixed Mode (Unix + Windows)
13 Tree size report Please send the Tree size report for SERVERNAME and SERVERNAME,
Execute Tree Report and analysis request
14 Battery Issue Battery 0 Dell on SVRW-SG-XYZZZ is Critical,
Accelerator Board Battery 2 on SVRW-NL- SERVERNAME is Critical
15 Software Install/uninstall request Execute Install .net 2.0 framework on SERVERNAME,
Format and reinstall OS on SharePoint Devserver_SAMPLE INCIDENT014XYZ
16 SNMP Agent issue SERVERNAME SNMPAgent Not Responding 01-06-2013 05:35:5
17 Replicate TNS entry Replicate Global tns file in all dc's,
Replicate the Global TNS on all DC. \\ SERVERNAME\CBS_Data01$\Oracle\00942_xyzdba2\Teamfolder\tns
18 FTP issue/request FTP account on SERVERNAME,
FTP login for username from Teleflex - GHO-2013-10944
19 Add/remove TNS Entry Kindly add TNS entry,
update tns entries on tns.admin for new EASE
20 Remote desktop access B&D-Spain - Remote desktop access.,
New Request for Remote desktop access
21 IP Address reservation IP reservations,
Need to create IP reservation (static-DHCP) for a DVR in the YYZ station
22 Unable to access movex Cannot access MOVEX,
Unable to access Movex, get a Citrix error
23 Restart spooler Restart spooler on SERVERNAME 309 jobs in print SERVERNAME,
Restart spooler and clear queue
24 Kill session/job Please kill all active session for my ID - userid,
To kill any active sessions on Citrix for Account CCPI Production SERVERNAME
25 Delete job/chain/module Delete all jobs in queue,
please delete all jobs in the queue
26 VPN Wireless Access WWIMS: WWIMS VPN Wireless Access Provisioning Task.
27 Restart Application SERVERNAME server needs to be restarted , applications are not responding
28 Power Supply issue Storage System Fault Tolerant Power Supply degraded,
Power sub-system degraded or failed
29 Change/modify ownership (ex; group/folder) Change Ownership and Access for the (\\SERVERNAME\depts$) T:\ProcDoc & T:\Manufacturing_ProcessDoc,
Share folder owner change
30 Health check report [Windows]-Server Online Status or Health Check
31 SOX review/audit SOX AUDIT : List of users who have access to CITRIX TOAD or Local TOAD
32 Disk failure Minor-l232sr10-Disk (7 - None): The device DeviceHarddisk2 has a bad block.
33 Password Management (ex; reset, expiry, troubleshooting etc.) FTP SERVER password reset & guidance on sending pdf from archive to FTP folder,
Please reset my account password
34 NTFS delayed write loss Delayed Write Lost
35 Restart database CKGP2 database restarted on Aug 20th at 22:17 C
36 Backup failure [Windows]-Backup Failure or Partial or Hung
37 Connection failure [Windows]-WinRM or Connection Failure Alert
38 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) SERVERNAME ~~~~CPU Utilization of SERVERNAME is high

Table 2: Examples of low complexity activity in Active Directory

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Account disable issue
2 AD disabled for Lync | Lync Users | AD Disabled or Enabled |
3 Create/delete DNS record Create a HOST A DNS record
4 Create/delete host record/name Create a new record for SERVERNAME
5 Create/delete share folder Create/Modify/Delete File Share
6 Decommission Request CR - SAMPLE CHANGE XXXXXXXX00009083 Decommission SERVERNAME
7 DHCP Pool request Clear DHCP pool for Malaysia subnet
8 DHCP reservation request DHCP reservation required on EDC DHCP servers
9 DHCP Scope request Add IP Address to DHCP scope for new HCL site in Pune
10 Disable/enable screen saver disable the screen saver / pc telecamereDimafMonterotondo
11 Domain Controller Reboot Scheduled Domain Controller Reboot
12 Enable/Disable computer in AD Enable computer in AD
13 Enable/Disable ID Pierce, Michael D's ID enable request
14 Envision connectivity issue enVision cannot connect to Windows Application event log
15 Event log issue Event log is full - The DNS Server log file is full.
16 Grant/remove Access issue/request $ Client hold $ oursource access
17 IP Address reservation IP Address Reservation
18 Join PC to domain Rejoining PC to the domain issue
19 Login issue $Client Hold$---cannot login to myapps
20 Mac Reservation Mac Reservation
Sl. No Activity/Category/Tasks Example of Ticket Summary
21 Password Management (ex; reset, expiry, troubleshooting etc.) Network password reset,
DRA reset password
22 Perform checklist of Domain Controller Perform checklist on the logistics domain controller
23 Printer management (ex; create/remove, clear map printer etc.) New Printer IP Reservation - LHR Hounslow
24 Provide access to server RE: Scan safe Website Exception Request
25 Provide/remove access Request to create groups in AD to provide access on file shares
26 Reboot Activity A records to be modified for the SharePoint dev environment SAMPLE INCIDENT01348XYZ
27 Remove server Execute Need to remove server from AD group
28 Server build New Build server – SERVERNAME
29 Shared Drive Access Create Share Drive Access for 15CS Level 3 Multi-Client
30 Space issue Logical Disk Free Space is low - The disk D
31 Login issue Unable to login to domain
32 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) ALERT:CRITICAL: CPU Utilization of Node CL-NL- SERVERNAME is now 93 %

Table 3: Examples of low complexity activity inVMware

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Battery Issue SERVERNAME _Array Controller Battery Failure,
SERVERNAME::HPSIMInt-263: The battery associated with Intelligent Drive Array Accelerator Write C
2 Bring server down Execute Please shutdown SERVERNAME tomorrow Saturday Feb 23rd 7:00am CET
3 ESX Host Process stopped SERVERNAME -nworks Collector: ESX Host Process 'bdflush' has stopped
4 Execute backup Execute SERVERNAME servers backups
5 vCenter SNMP Agent Alarm SERVERNAME --vCenter SNMP Agent vpxd Alarm for target SERVERNAME
6 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) ESX Host Available Memory has dropped below threshold ,
HPSIMInt-748: The Advanced Memory Protection subsystem
Table 4: Examples of low complexity activity inSCCM

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning AdLogRev-account locked out-EU/userid
2 Envision connectivity issue Execute enVision - Delete non SOX device: SERVERNAME
3 Configure SCCM to push package Configure SCCM to push package
4 Execute SCCM package Execute C0100145 - Documentum Desktop Client v5.3 SP4,
Execute SCCM package
5 Add machines in SCCM pilot Execute ISM SERVICE REQUEST: Add machines in the PILOT Collection
6 Download package to SCCM server Execute Please download the package XYZAB to SCCM server
7 Remove SCCM records Execute please REMOVE SCCM records
8 Replicate packages to other SCCM server Execute Replicate those Packages to the SCCM Server in Stockholm
9 Remove workstation from SCCM Remove workstation from SCCM database,
Execute Please delete the machines from our SCCM server console
10 Space issue Logical Disk Free Space is low - The disk E

Table 5: Examples of low complexity activity in Citrix

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Create Account/Access (Add/Remove Access) for Username’s,
Modify Account/Access (Add/Remove Access) for Username’s
2 Application issue Cannot launch Citrix Application
3 Cannot launch MWMS(Mobile Work Management System) Cannot launch MWMS - Discrete from Citrix
4 Citrix access issue/ request Citrix Access for FileZilla Client,
Execute Accessing a published app on Citrix server,
New application request for Citrix access- 21 AUG
5 Printer management (ex; create/remove, clear map printer etc.) Printer request,
Map the network printer \\ SERVERNAME/xyzabcd420004
6 Grant/remove Access issue/request Access on Transnet test,
Access to Citrix (roaming) profile,
XYZ access via Citrix,
Grant access at MWMS Matrix to user Araujomarc,
Grant access to user Caamanoa (Alejandra Caamano) on ABCD-2009 citrix icon
7 Login issue Cannot login to XYZ,
Whenever I login to the Citrix server SERVERNAME, a Citrix plug-in message appears
8 Add/De-active Citrix icon add a citrix icon named LXOneNorpac for network id as xiangj,
can you please add the K-Time Icon onto my citrix profile,
Deactivation of Citrix icons on 31 October
9 Citrix Session Purge Request Citrix Session Purge Request
10 Add new users to Citrix Execute Request to add new users to Citrix
11 Login issue not able to log on to xyz production
12 Password Management (ex; reset, expiry, troubleshooting etc.) Password Reset for Username,
Transnet password reset
13 Print spooler Print spooler restart
14 Printer management (ex; create/remove, clear map printer etc.) adding a printer to my pc,
printer to be setup,
Printer Access
15 Shared Drive Access Shared Drive Request PENDING for approval
16 Space issue Acc to SW tool XXXXYY\ is 93%,
As per solarwinds report the server SERVERNAME TX11-W:\ is 92 %,
Logical Disk Free Space is low - The disk C
17 Transnet issue Transnet application issue,
TransNet issue
18 Login issue User is not able to login on CITRIX keep says the access is denied
19 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) : ALERT: WARNING: Node SERVERNAME -C:\Label:SYSTEM 2c0c2ca8 is now 90 %,
As per SOLARWINDS repot Node SERVERNAME-C:\ Label: 804accdc is now 91 %

Table 6: Examples of low complexity activity in Linux

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Afrax request Execute AFRAX requests
2 Grant/remove Access issue/request Security:badsu
3 Log message /var/log/messages hda ide-device didn't answer for interru,
System configuration file /etc/syslog-ng/syslog-ng.conf.in was not found
4 Password Management (ex; reset, expiry, troubleshooting etc.) Execute Set OS user ID sdb to non-expiry,
Reset password
5 Provide access to server Execute root access
6 Space issue Disk Bottleneck probability
7 System log analysis syslog:/sbin/syslogd,
System configuration file /etc/syslog-ng/syslog-ng.conf.in was not found
8 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) CPU load, bottleneck situation, current value: 100.00%,
Memory load, bottleneck situation, current value: 99.27%

Table 7: Examples of low complexity activity in UNIX

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) SERVERNAME File System High Utilization 06-07-2013 02:36:33,
/var file system Increased to 85.01%
2 Grant/remove Access issue/request Access required on /var/lib/tomcat_uat/work,
Request For access - XYZA QA team
3 Password Management (ex; reset, expiry, troubleshooting etc.) Solaris root Passwd Expiration,
"userid" user password expired on SERVERNAME,
change password for oaobia on SERVERNAME
4 Device down IP Address Interface Down 26-09-2013 12:23:43,
IP Address Host Down 22-10-2013 17:40:47
5 Space issue As per solarwindows report, the server SERVERNAME --/local/home02 is 94 %,
FW: LISA: VAR volume on server SERVERNAME is nearly full
6 Account Management/provisioning Create Account/Access (New User Request) for Barlow, Mark,
Modify Account/Access (Add/Remove Access) for Miller, Josie,
Create account on servers.
7 Information request Logging information required for ftp account userid,
Need information for person login to server SERVERNAME
8 Printer management(ex; create/remove, clear map printer etc.) create new Unix print queue,
Install Printer: on SERVERNAME
9 SNMP Agent issue IP Address SNMPAgent Not Responding 22-10-2013 22:52:09
10 Appworx/Patrol Agent/master Down [Unix]-Patrol Agent Down Or Unreachable,
SERVERNAME ~~~~PATROL_AGENT port is not responding on SERVERNAME
11 Add/remove server in application/database/monitoring(ex; networker, BPPM, password database, SMART, server lease tracker) Please add server at networker,
To Add server in BPPM : SERVERNAME,
Please add server in password database and update server lease tracker,
Please add the servers in EMC SMART console,
Please remove server from SMARTS monitoring SERVERNAME
12 Backup Restore test Backup Restore test required for all DBs in IAH DC
13 Blade failure 3 blades not responding on Huddersfield Linux grid after restart
14 Change/modify ownership Change owner and permissions of directory,
Change owner of /s01 to 775 with abcdef:dba in djjajhahahj
15 Create/delete share folder Create a share on server SERVERNAME
16 Decommission Request As CM#SAMPLE CHANGE REQUEST000000084054 Server SERVERNAME (local zone) has been decommissioned,
Decommission server SERVERNAME
17 Execute script Execution of root.sh scrips
18 FTP access issue Cannot access the ftp server both dev and prod,
FTP access for Matrix XYZ - ABCD on SERVERNAME
19 Ftp connectivity issue unable connect to ftp resource
20 FTP issue/request Expedient server SERVERNAME needs to connect to abcde.nhiuuhhg.com,
FM FTP Payroll - not picked up
21 FTP report Nike FTP report
22 Kill process Kill runaway processes on SERVERNAME,
Please kill Apache process which are hung on SERVERNAME
23 License Manager down 3 License managers down. Please restart,
Flowmaster license manager is down on SERVERNAME. Please restart
24 Log investigation [Unix]-Log Investigation
25 Login issue Cannot login SERVERNAME,
Facing Issue with UNIX. Not able to see Login Screen
26 Migration issue/request Migrate servers,
Migration of ORXXX DB in UK DC
27 Node/connection/partition/volume Down Volume /home/abdcef on Node SVRU-US-IAH- SERVERNAME is Down
28 OEM Agent deployment OEM agent deployment on server: SERVERNAME
29 Power Outage Dec 14 - please power down SERVERNAME
30 Process restart Process Restart failed
31 Provide access to server Please remove CRTI Unix home drive and account,
Request No: AXXXX-99FMHP
32 Reboot Activity /matrix is unmounted after server SERVERNAME got rebooted,
BMS CCPI production server reboot activity
33 Remove files CRITICAL : Please remove the files from NDH,
Please remove the files from the mentioned path
34 Restart Application Please stop and restart the Flexnet Manager application. See NOTES
35 Restart database CTG Linux grid: restart abc:fsda_db on multiple nodes
36 Restart services backup failure: SERVERNAME, please restart networker services, see notes,
Please restart Bladelogic services on server - SERVERNAME
37 System audit issue System Failed Audit Report
38 Tree size report snmp Process Restart failed
39 VNC issue Restart VNC session in SERVERNAME & SERVERNAME

Table 8: Examples of low complexity activity in AS 400

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Create Account/Access (New User Request) for Username,
Terminate Account/Access for Username
2 Audit report Audit report for OFS
3 Create a MOFS Report Create a MOFS Report
4 Printer management(ex; create/remove, clear map printer etc.) Create Printer Group,
PKMS: Add printer,
Change Printer IP
5 Email Trigger Notification Email Trigger Notification Not Received,
No email trigger notification received from OneID application to OneID Service Center
6 Grant/remove Access issue/request List of users who have STRSQL access in PKMS production (SERVERNAME) box for all contracts
7 Health check report Create a health check report,
Need to prepare the Health Check Report
8 Login issue MOFS login Issue
9 Password Management (ex; reset, expiry, troubleshooting etc.) AS/400 password reset,
Password Reset for userid
10 Replication report Create a replication report

Table 9: Examples of low complexity activity in Database

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Space issue /orabackup mount point is not visible on EDW Stage Node 1,
Please add space on the db XYZABC,
BASELINE SPACE RECLAIM _ pkdab
2 Execute script [Database]-SQL Script Execution-v1.0,
Modify the existing AWR script for Maximo PROD DB to get weekly AWR report for DB: ABCDE7
3 Grant/remove Access issue/request Give access on following views,
Kindly Provide the access,
Need access on sys.link$ on maxmt7
4 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) IP Address File System High Utilization 05-06-2013 18:19:47,
File system abc is 95.006000% full on SERVERNAME – IP Address Threshold 95% < 95.006000% < 100%
5 Account Management/provisioning Unlock user account Lrs for database xyza,
Create my account on "xxx" and "yyy",
Please create the database user account on mentioned DBs
6 Add/remove TNS Entry Add below tns entry in global tnsnames.ora file,
Add TNS Entry in Global TNS file
7 Blackberry issue Blackberry is not able to connect to SQL server and giving error at initialization
8 Bring appworx agent/database/server down Bring SERVERNAME down for VPLEX move,
Please bring the DB (ABCD) down on the Server SERVERNAME
9 Change memory parameter Please change the memory parameter
10 Change parameter Need to change parameters on GDPP1
11 Cold backup Cold backup of ABCXYZ database,
PGBU Production DB cold backup
12 Cold backup Problems Cold backup Problems SERVERNAME,
Critical Cold backup Problems SERVERNAME
13 Create login Please create specified login id's in 11g OEM
14 Create Table space Create new table spaces in EDW Dev,
Kindly create table space
15 Database bounce Bounce below database,
SERVERNAME _PRD1 needs to be bounced at 12PM IST today
16 Decommission Request On server SERVERNAME please drop dbsid rmepx1 and recreate the same,
please decommission databases on server
17 Drop table space Drop the table spaces
18 Enable CC Monitoring Add entry in CC Monitoring: BFCUPG_ SERVERNAME,
Enable CC Monitoring
19 Export Problem Export problem on SERVERNAME
20 Export_mon Report Export_mon Report: Please investigate following export issues
21 Failed Email Submit Failed Email Submit
22 FTP issue/request need to trace session sid=2, serial# = 59593 on database - abcxyz
23 Global Parameter alert [Database]-Alarm of Global Parameter triggered-v1.0.pdf
24 Hot Backup Problem Hot Backup Problem: SERVERNAME SERVERNAME08
25 Hotbackup_mon Report Hotbackup_mon Report: Please investigate following hotbackup issues
26 Information request Need information on the Back up timings
27 Kill session/job Need to kill a session on SERVERNAME
28 Password Management (ex; reset, expiry, troubleshooting etc.) "Password expired" for some accounts in userid,
Make database passwords permanent,
kindly reset password of userid user on database: SERVERNAME _prd1.world
29 Provide access to server Request No: XXXX-986JHV
30 Reboot Activity As per proactive maintenance for EDW month end planning, please reboot below db servers,
Please reboot XYZ dev and staging db.
31 Refresh Database Please provide crontab refresh MV details on ABCD0
32 Remove entry from Global tnsnames Please remove entry from Global tnsnames.ora file
33 Restart database Need to restart the HA Stage Database instance,
Please restart sftp1 database at 11 45 PM EST today
34 Server level blackout Please put server level blackout on SERVERNAME,
Blackout on SERVERNAME
35 Table space issue Add 15Gb space in DFL_DATA table space on ABCD10,
Add free space in TEMP table space on db - isssdmp1_ SERVERNAME.WORLD

Table 10: Examples of low complexity activity inOracle

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Create Account/Access (New User Request) for Username,
Modify Account/Access (Add/Remove Access) for Username,
Terminate Account/Access for Username
2 Audit request Audit Request - Oct13 Oracle reports via OCS
3 Grant/remove Access issue/request Access to ABCXYZ DB,
Database Access for Username,
RDP and DBA access
4 Password Management (ex; reset, expiry, troubleshooting etc.) Forgot User ID/password,
Password Expired SERVERNAME,
Oracle Password Reset
5 Reboot Activity Need to restart PTAU (UAT) & PTAD (Production) database to enable archive log mode
6 Release session Release session from IP Address
7 Restart agent Restarting the oem agent for ckdsl
8 Restart database ABCXYZ database restart
9 Restart services Restart ABCD listener services
10 Software release Software release to ABC0611P
11 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) ALERT: WARNING: Node SERVERNAME -D:\ Label:Data aca3845b is now 90 %

Table 11: Examples of low complexity activity in SQL

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Database backup request DB Backup Request,
UAT DB backup file used for the web visibility application is required
2 Database Down Alert: Status of SVRW-US-IAH- SERVERNAME-G:\ 4a5dfe0e is Down
3 Database Mirroring Error Database Mirroring Error- SERVERNAME \WMS
4 Deployment issue Deploy and schedule DTS package on SERVERNAME server
5 Deployment request RE: Deployment for CP#GHO-2013-10220,
SCA database deployment
6 Execute script Execute SQL Script,
Please run archive scripts
7 Grant/remove Access issue/request Can you please give me the READ access on remedy production database and test database,
RE: Request to Create User access on SERVERNAME, SERVERNAME2
8 Log file full SQLdm Alert (Warning) - Log files are 75.43% full for database [tempdb] on SERVERNAME \MATRIX
9 Multiple alerts Multiple SQL ABCXYZ alerts
10 OS memory alert SQLdm Alert (Critical) - OS memory used is 95.10% on SERVERNAME \SUPPORT
11 Refresh Database Refresh database KPI UAT & Staging,
Refresh the XYZ UAT database
12 Remedy performance issue Remedy performance issue
13 Session blocked alert (Critical) - Session 508 blocking for 563 seconds, 1/9/2014 5:04:35 AM. on SQL54\INTEGRATION,
Blocked sessions on ABC54\INTEGRATION,
Multiple blocking session alerts on ABC54\INTEGRATION
14 Space issue : ALERT: WARNING: Node CL-US-IAH- SERVERNAME -D:\ Label: Cabc543626 is now 92 %
15 SQL Agent job alert SQLdm Alert (Critical) - SQL Agent job [ETL - GIT All Regions LastStatus] completed with a status of
16 Transaction Log alert DB Maintenance Plan 'Backup & Transaction Log Backups'' completed on \\ABCSQL001,
SQL Server Job System: 'Transaction Log Backup Job for DB Maintenance Plan 'Backup & Transaction Log
17 TRANSACTIONS OPEN DURATION TRANSACTIONS OPEN OVER 1 HOURS,
TRANSACTIONS OPEN OVER 1 HOURS --- SPID = 106
18 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) ALERT: CRITICAL: Node SVRW-NL- SERVERNAME -D:\Label:DATA ae417078 is now 97 %

Table 12: Examples of low complexity activity in Exchange

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Account Always locked. Need log for root cause,
BR/RS/XXXXX - SW - AD - Network Account locking constantly,
Execute deactivate NT account
2 Active Sync high hits report Active Sync High Hit Report || 9th Aug ,2013
3 ActiveSync Device/User Statistics Report Active Sync users list,
ActiveSync Device Statistics Report @ Last 24 hours
4 Blackberry issue Blackberry activation code,
blackberry issue,
Calendar appointments 1 hour out when created on Blackberry
5 Blackberry server reboot Blackberry Server reboot activity,
FW: Please Ignore the reboot alert for 4 blackberry servers
6 Change/modify ownership Execute change of owner of the Dls
7 Create/delete mailbox Execute delete ACCOUNT NAME email address from global address list,
Execute Create a Mailbox,
Execute Delete from GAL Obsolete email address
8 Create/delete share folder Restore subfolder from Shared Email box
9 Database server error A message transfer agent (MTA) database server error was encountered
10 Decommission Request FW: Exchange Remediation - POP3 Mailbox Server Decommissioning - DEADLINE DATE 19th November 2013
11 Event log issue One or more Objects properties are pointing to Active Directory deleted objects. See event log
12 Exchange Daily Check List | Daily Exchange Checklist | 15th December, 2013 |
13 Exchange Service Monitor Report Exchange Service Monitor Report - 2013/09/15
14 Frequent Lockout Frequent Account Lockout
15 Grant/remove Access issue/request Execute Access to Archive from a user,
Execute Access to PVG inbox,
Execute Full access to DL --SAMPLE INCIDENT000010811XXX
16 Group membership update Execute Add new GSD agent to the ITSUS GSD group for full permissions to the GSD mailbox
17 IIS Reset IIS Reset
18 Increase mailbox send limit Execute Please increase the Send To limits on a mailbox
19 Information on number of active mailbox Need number of active mailboxes,
Total Active Mailbox’s in ACCOUNTNAME 2-Oct-2013
20 Mail Queue Report FW: Mail Queue Report for 8/20/2013
21 Mailbox Issue Issue with mailbox,
Ref : SAMPLE INCIDENT01393XXX Room Mailbox not working
22 Mailbox permission Access group.rrm mailbox,
Execute grant full mailbox rights to users – USERID1, USERID2,
User cannot see the rights of the mailbox
23 Mailbox quota Sample Increase Increase Mailbox Quota
24 Mailbox size issue Angie Ng called to Increase the mail box size for the user Elaine Low,
Execute Increase MAILBOX SIZE,
Exchange mailbox has 250mb after migration, he had 500mb
25 Move Messages Move messages from Poison Queue
26 Provide logs SERVERNAME WARNING: Exchange logs too large
27 Reboot Activity | Blackberry Server reboot activity |
28 Remove from DL, GAL Execute Add or Remove on DL,
Execute Remove Conference Room's from GAL,
Execute remove DL from GAL
29 Restrict sending to a certain mailbox Possibility to restrict sending to a certain mailbox
30 Space issue Logical Disk Free Space is low - The disk P
31 Suspected spam [SUSPECTED SPAM] PLEASE REPLY ASAP,
Outlook "Block Sender" Spam email filter no longer works
32 Login issue User unable to login into mailbox
33 Unable to send mail to/from shared mailbox Client can't send mail to my mailbox,
Execute Cannot send from shared mailbox
34 Update GAL Execute Update GAL
35 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) A memory allocation failure affected a database copy on the local server,
ALERT: WARNING: Node SVRW-NL- SERVERNAME -D:\ Label: 7c9099180 is now 90 %

Table 13: Examples of low complexity activity in Lync

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Modify Account/Access (Add/Remove Access) for Atkinson, Marc,
Terminate Account/Access for Dogra, Meenal
2 Grant/remove Access issue/request Lync Dial in access revoked,
Modify/Access (Add/Remove AccAccountess) Dial Lync
3 Iphone issue LYNC mobile for iPhone is still not working correctly.
4 Lync Usage Reports | Lync Usage Reports | August 2013 & September 2013 |
5 Slowness issue Lync conference signal is not good (N/w slow)

Table 14: Examples of low complexity activity in Mobility

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning Execute Create new Airwatch and xyz accounts for new GSD agents,
Execute Remove users from AirWatch
2 Blackberry issue Blackberry activation Code,
Blackberry Issue
3 Grant/remove Access issue/request Execute Access for xyz and AIRWATCH,
Execute Mobility Tools Access Request
4 Software Install/uninstall request Execute uninstall Office communicator,
MxEngage installation issue
5 iPAD issue iPAD issue/registration
6 Iphone issue Assistance Setting Up AirWatch on iPhone,
Iphone Issue,
Iphone setup
7 Password Management (ex; reset, expiry, troubleshooting etc.) Airwatch password reset

Table 15: Examples of low complexity activity in Networks

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Access port request I need port 16 on IP ADDRESS put on v-lan 511,
SERVERNAME FastEthernet0/37 Please turn on this port
2 Bandwidth/Utilization Report request 31 Day Utilization Report,
Bandwidth Utilization report,
Please provide Network utilization reports for SERVERNAME server
3 Blade failure Major-X.ABCXYZ.tele.fi-BLADE STATUS UNKNOWN
4 Change port Change port setting on Cisco Switch IP ADDRESS,
Change ports to vlan 100 on switches of ACCOUNT NAME Boom
5 Decommission Request 5N Enclosures to be Decommissioned,
Decommission of SERVERNAME
6 Device down IP ADDRESS Switch Down 17-06-2013 20:16:43,
LAN Group: Interface Down- Gi0/1 hosted on node ABCXYZ_f11-1_north_america with IP ADDRESS
7 Enable port SERVERNAME needs port enabled,
Please enable port ABCXYZ Fa1/0/4
8 Grant/remove Access issue/request Access to customers website,
Internet access on guest network
9 LAN port issue LAN port enable,
LAN port issue
10 LINK-PORT alert LINK-IF-IP ADDRESS/128<->IF-abcdyh/14 Network Connection Down 17-06-2013,
LINK-IF-IP ADDRESS/955<->PORT- SERVERNAME /3 Cable Down 12-06-2013
11 Migration issue/request GM Mainframe Migration to new GM Enterprise Data Center - Oct 19/20,
Please create a Sr for Blade Migration On SERVERNAME
12 Node/connection/partition/volume Down LAN Group: Node Down- acBGYAAA_europe with IP ADDRESS is down at Sun Jul 14 04:42:31 EDT 2013 a,
LAN Group: Node or Connection Down- BRAZIL_AP02 with IP ADDRESS at Thu Oct 31 10:06:24 EDT 2013,
Partition-105/AM-PM Partition Down 26-06-2013 07:59:34
13 Port identification Please identify the port of the SERVERNAME
14 Port Verification - Server Port Verification - Server Decommission SERVERNAME
15 Power Outage Planned power outage,
Power outage at EBU/Seoul office,
Power outage at Holset location on 17th August 2013 at 12:00pm UK time
16 Power Supply issue IP ADDRESS Power Supply StateNotNormal 22-11-2013 18:46:25
17 Problem status report Problem status report, 2440622, DN41506, KIEV
18 Provide access to server Approval ABCD-9BWH7S,
Modified Security exception XYZ-8XLHVY Reference approved security exception for details.
19 RDP issue RDP issue
20 Remote site unreachable LAN Group: Remote site containing XXX21-Switch-1 with IP ADDRESS is unreachable at Sat Nov 23
21 RTR and SW Down Multiple RTR and SW Down Alerts
22 SNMP Agent issue IP ADDRESS SNMPAgent Not Responding 17-06-2013 22:24:29
23 Switch configuration request LAN Group: Need help with switch config
24 Uptime report Need uptime report of 3 Wireless APs at DTC, Pune.
25 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) : ALERT: LINK UTILIZATION: RTR-ap0080-r1-ABCDEF-a091-mpls 10.69.152.2
26 VLAN inaccessible Site RE: VLAN 600 inaccessible Site ABCZYZ.
27 Wireless Access point issue AP problems with Crosspoint HQ location

Table 16: Examples of low complexity activity in Backup

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Add servers to backup Add Server to Backup Rotation,
Execute Add servers to backup schedule
2 Backup failure Backup Failures - 10/09/2013 EDC
3 Backup report [Backup]-NA Backup Report,
Execute Net Backup Vaulting Report - Library Content - SERVERNAME - Report is incorrect
4 Backup Restore test Backup Restore required for all DBs in IAH DC
5 Decommission Request CR - SAMPLE CHANGE XYYYYZZZZ00009083 Decommission SERVERNAME,
SAMPLE CHANGE REQUEST00010932 --- Decommission of server NTserver6
6 Execute backup Execute Backup Removal Request,
Execute New backup request
7 Health check report SERVERNAME: Critical 11/04/2013 12:30 OMNITRIG HealthCheckFailed "[138:709] Health check message: "omnisv -status" failed.",
[Backup]-Netbackup - Health check
8 Software Install/uninstall request Backup agent need to install
9 Migration issue/request SERVERNAME Migration Activity,
Storage for ABCDEF DB and file system migration
10 Recall Backup Tapes AIX Backup Tape - - 11/01/2013
11 Restore Test [Backup]-Test Restore-v1.0,
Bi-weekly EDC restore test
12 Space issue As per SW top 10 report SVRW-UK- SERVERNAME - C:\ is 90% full,
Logical Disk Free Space is low - The disk D/Disk G/Disk Q/Disk P
13 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) Critical- SERVERNAME -Average (2 samples) physical memory usage is now 92%, which is above the error threshold (90%)

Table 17: Examples of low complexity activity in Storage

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Disk failure [Storage]-Disk failure or drive replacement,
[Storage]-Disk or Shelf Count Mismatch or Disk is faulted
2 Drive Array alert L1XXX543 : An alarm has occurred on HP P6000 Array System: ABC145THS WWN: 5001-4380-013C-05C0
3 Health check report [Storage]-NA health Check
4 Space issue Critical-xxyyzznn-Srv (2013 - None): The C: disk is at or near capacity. You may need to delete some files.

Table 18: Examples of low complexity activity inRemedy

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning [Remedy]-Remedy Account Creation/Deletion (HCL User)
2 Login issue [Remedy]-Remedy Login Failure

Table 19: Examples of low complexity activity in Appworx

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Account Management/provisioning AAC Request No: ABCD-ABC651 for MaevaBourhis,
Account creation for user-ABCD in Appworx,
Please setup user in appworx master
2 Add entry Please add below entry in /usr/users/aw_cic_ABCD/exec/authoriz.lis
3 Agent stopped agent ABCYD02 stopped for the activity,
Appworx agents need to be stopped in BOLT OVM Servers
4 Appworx access Appworx access,
APPWORX STG ACCESS
5 Appworx agent issue Appworx agent ABCXY15 issue (SERVERNAME master),
Appworx agent is not working. Please reset. FPEDI Appworx.
6 Appworx change Appworx Change in SERVERNAME,
SERVERNAME appworx change request
7 Appworx job not running All jobs in SERVERNAME is in Hung state. Please check ASAP,
Appworx chain jobs are not running,
CTT IND: appworx job failed in SERVERNAME
8 Appworx Migration Appworx: Migration of chain with components and conditions,
CTT Enhancement - Appworx Migration- SERVERNAME - CR4671 - HSTPROD,
Migration of Appworx chains from Stage to Prod
9 Appworx request Appworx request.-Please to change the language to my applications manager in proxy,
SERVERNAME appworx request
10 Appworx/Patrol Agent/master Down ABCD178 agent is down (SERVERNAME Master),
Agents are down :ABCDGG01
11 Bounce appworx Appworx master's need to be stopped for the bounce,
Bounce ABCDEF_PRD1 appworx master,
Need to stop master SERVERNAME for bounce
12 Bring appworx agent/database/server down Need to Shutdown Approx Agents in BOLT OVM Servers,
Please bring appworx master down
13 Change parameter DBU: Please change parameter value of a program in SERVERNAME,
Need to change parameter value SERVERNAME instance
14 Change value Appworx - Please change the prompt values,
Appworx- Please change the value in Substitute Variable,
Please change the parameter value in mpcore
15 Change/modify schedule Appworx - Please change the schedules,
DBU: Please change the schedule of a chain in SERVERNAME,
Change the Payroll_Activity job schedule from Sunday 2 PM to Friday 2 PM on Agent SERVERNAME
16 Check master All jobs getting failed in SERVERNAME Master Production. Please check n help on the same,
Appworx master SERVERNAME is slow, Jobs started getting piled up. Please check on priority,
Global Enhancement Team: Please check the agent(SERVERNAME) in Master SERVERNAME,
' SERVERNAME ' Master is too slow. Please check
17 Clear backlog DBU : Clear Appworx Backlog,
DBU- Clear backlog in Production Appworx master : SERVERNAME,
ABCDEF & XYZABC: Please clear the backlog,
Need backlogs for ABCXYZ master cleared
18 Create login Need Appworx logins on,
Need to Create Appworx Login Creation on ABCDE Master,
Please create remote login between XYZAB and XYZGH
19 Printer management(ex; create/remove, clear map printer etc.) Please add the printer name in the ABCXY file,
please check printer set up,
Please create entry of printer at backend
20 Information request Can you please provide information on appworx Metadata,
Please provide data and screenshot for failed jobs,
Please run the below query and provide data
21 Database bounce Bounce of remote agent on ABCXYZ,
Database bounce activity,
Need to bounce BMS
22 Decommission Request Decommission appworx ABCXYZ1 and install appworx master XYZABC1,
Decommission agents in master ABCXYZ1
23 Delete job/chain/module (FBU GET Team: Enhancement) Need to delete backlog from appworx,
Delete and re-submit the job XYZABC0150 in ABCD01,
Delete the jobs in citstbi
24 Disable condition Disable conditions for C_ABCDE_WEEKLY_LOAD,
Need to Disable conditions for C_ABCDE_DAILY_LOAD in ABCDE001,
Please disable/ enable the conditions
25 Disable/enable module CTT => ABCDE01 => Need to disable the modules Please check the notes,
Please enable/remove module XXYYZ0057 on ABCDE01 Master,
Please disable some modules on Appworx Master: ABCDE01
26 Disable/enable single run for chains DBU: Please enable the single run for the chains in ABCD701,
XYZA01 : Could you please disable single_run checkbox for remote module
27 Enable Appworx job DBU: Please enable jobs in DBU Production Appworx,
Enable Appworx job,
Please disable / enable the jobs as per ABCD outage
28 Export chain Excel Export of Appworx Job details required. C_GL* chains from stage and Production,
Please export Chain DBA_XXXXXXX_CHAIN and DBA_YYYYY_CHAIN
29 Failed Email Submit Failed Email Submit
30 Found aborted jobs : Found aborted jobs
31 FTP issue/request CCI1P:Pls help run SFTP program at 9 pm CST to resend INVOIC from appworx,
Please change the program name in master ABC201 in XYZ_I2DM_ZXY_OB_ABCDE_GEX
32 Grant/remove Access issue/request App works access,
Job scheduling elevated access,
Revoke My access
33 Inactivate queue Please inactivate the queue ABCXYZ26 on master ABCXYZ.
34 Software Install/uninstall request Need OAE agent installed for ABC1XA instance,
Need Remote agent installed,
Please install appworx 6 and then 8 on SERVERNAME
35 Jobs running slow All PBI jobs running for long time,
All the Jobs in SERVERNAME are running slow,
Jobs are taking more time to complete in SERVERNAME master
36 Kill requests/jobs (Global Enhancement Team - DEP1S)Please kill the requests running for 'XXYY0305_DEP_CH' on ABCDX01,
ABCDX01: Please kill XXYYZZ_RMEP_20_CH,
Please kill long running job XXYY0943 in SERVERNAME master
37 Kill session/job SERVERNAME: Job stuck at kill status,
AABBC01 - Need to remove kill request from backlog
38 Login issue Appworx - Unable to open login screen for ABCD Appworx Production,
CTT: Provide appworx login to ABCDE01,
Not getting the login screen for XYZAB
39 Migration issue/request Appworx migration from production(SERVERNAME) to development (SERVERNAME),
Appworx - SAMPLE CHANGE REQUEST000000086680 - Migration of chains,
CGL Migration - Migrate all the workflows from UAT to Dev
40 Password Management (ex; reset, expiry, troubleshooting etc.) Appworx : Password reset,
Provide account password,
Appworx: Please reset my password to below Masters
41 Please check the job In SERVERNAME master job is running from long time please check,
Please check completed jobs showing as running in SERVERNAME01,
Please check the aborted job
42 Printer management(ex; create/remove, clear map printer etc.) Add printer in appworx instances: ABCDXYZ,
New printer setup,
Please correct the setup of the printer in ABCDXYZ1 Appworx
43 Provide access to server Add exception to CFS_ARC_US_604_0078XYZ_S_CH,
Keep exception in XYZABCD Master for SAS_ABCD_LOAD,
Please create exception in ABCDXYZ
44 Provide list of jobs Kindly provide list of jobs running,
Please provide list of all Jobs live for BI from Appworx
45 Provide logs Remove Reliability jobs in backlogs present in STAGE appworx Master - ABCD01
46 Provide/remove access Access on following production appworx for performance monitoring,
Access for COLS & BYE on ABCXYZ01,
Access required on Appworx
47 Put job on hold A job with job ID 7812595 is on hold in ABCXYZ0,
Please hold off batch job on July 8,
Please hold off submit job on June 10th 2013
48 Quarterly Appworx findings Q3_2013_LS3.2.3_Apprworx-Findings
49 Quarterly review Q3 2013 User List for Appworx
50 Reboot Activity BMS CCPI Production server reboot activity,
Immediate server reboot of SERVERNAME,
Server Reboot on Saturday November 23 at 6:30 AM EST
51 Remove Exception request Need to remove exception,
Please remove exception from job XYZ_RSS_SUBMIT_MD
52 Remove parameter Please remove parameter from SERVERNAME from ABCDE01 master, see notes
53 Reset module ABCDE01: Please reset module,
Please reset the aborted module in Master :- ABCDE01
54 Reset the job Appworx job to reset,
ABCDE01: Need to reset aborted job XXYYZ0366_DEP_30_MD job id 6560462
55 Restart agent Please clear the backlog and restart the agent
56 Schedule chain DBU: Please add the schedule the chains in XXYYZ701,
XXYYZ01 :- Please enable the schedule of the chain in XXYYZ01,
Please schedule chains on XXYYZ01
57 Schedule job Appworx team to reschedule the Jobs,
XXYYZ01 : Please schedule the appworx jobs on XXYYZ01,
Please disable the schedule jobs marked in the excel sheet in the master XXYYZZ01 and App NGXYZ
58 Skip the chain scheduled Need to Skip the chain scheduled on 25-AUG-2013( mentioned in notes) from ABCDE01 master,
Please skip the chain for 24th-AUG-13 run on ABCDE Master
59 Slowness issue Appworx response is slow,
Appworx slowness issue - Master ABCDE001,
ABCDE01 - Chains running slow,
ABCXYZ01 - Master responding very slow
60 SOX review/audit CAR CIS 5271 - SOX LS3.2.3 - Please execute the following query and send output, and system date,
Please get this information for Q3 2013 SOx Audit for APM#669 LS3.2.3,
ABCD01: Q4 Review SOX Audit Finding (LS3.2.3)
61 Space issue Please clear some space in aw_edw mount point in SERVERNAME server
62 Stop agent/master ABCD Activity: Please stop and start the agent AABBCC01 and AABBCC14,
Kindly stop appworx master running on SOMS SERVERNAME,
ABCDXYZ -> Can you please stop the appworx agent
63 Unable to view job ABCXYZ02 : not able to view Module's information,
Not able to view all jobs in ABCXY and ABCXY
64 Upgrade appworx Please upgrade appworx master ABCXYZ1 during ACCOUNT NAME Atlantic go live week
65 Utilization Issue (Alerts related to CPU, Memory, Disk, Network etc.) File system orabackup is 95.007300% full on SERVERNAME – IP ADDRESS Threshold 95% < 95.007300% <
Table 20: Examples of low complexity activity inWeb

Sl. No Activity/Category/Tasks Example of Ticket Summary
1 Add jar files Add jar files - WAS 7 Staging environment (http:// SERVERNAME),
Add JAR to shared library of Webpartsdev
2 Application issue Application not working on DEV,
Please check issue with the application, unable to start
3 Clear cache Need to clear server cache for http:// SERVERNAME /tuition/,
Please Clear Server Cache
4 Create group As part of Part Pricing project a new LDAP group needs to be created in PROD region,
Please create a LDAP group for CTAS on dev where all valid ACCOUNT NAME wwid can access
5 Information request Please provide information,
Please provide information for SOx CC2.1 Q3 2013 APM 669
6 Decommission Request Decommission ACCOUNT NAME Engines website,
Need to Decommission DEV GSA collection EBU_ SERVERNAME _COLLECTION and EBU_ SERVERNAME _ABCZYGFA
7 Deployment issue Deploy EAR on SERVERNAME
8 Deployment request DCX Production EAR deployment,
ECW Stag Deployment,
Please deploy mentioned EAR on STG server
9 Device not accessible Ariba Staging application is not accessible after Patch upgrade yesterday,
XYZA Dev is not accessible.
10 Grant/remove Access issue/request Access issue,
Access permission require,
All users cant access http://SERVERNAME
11 Internal server error Internal server error after deployment in lrs-dev,
SESAdmin application on stg is giving 'Internal server error'
12 Migration issue/request Migrate EAR file,
Please migrate EAR on production for MaCTrack application,
Migrate PRS EAR from dev to stage
13 Move EAR from Stage Move EAR to Stg for IAM Profitability,
Need to move EAR from Stage to Prod for RPV
14 Promote EAR from Dev to Stage Please promote below EAR from Dev to Stage
15 Provide Application and jvm logs Application and jvm logs for Dutycycle,
Application and jvm logs for Dutycycle SERVERNAME, SERVERNAME01
16 Provide logs Need latest logs,
Need Log files,
Need Logs for Tuition assistance application on DEV
17 Reboot Activity **********************URGENT********** stg app server is very slow/down. Can you please restart it,
Need server restart,
please clear the cache and restart the app server
18 Restart Application Clear cache and restart jvm for IT Time Track application.
19 Slowness issue Apps on SERVERNAME very slow

[030] Upon identifying, the activity complexity module 212 may configure an activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. In one example the data based may be relation database.
TEAM MODULE 214
[031] In the implementation, the team module 214 may obtain second input data. The second input may comprises human resource data, skill data, and resource work experience data, training data, education data and volume of ticket to be resolved data.Further, the team module 214 may store the second input data in system data 222.
[032] Further to obtaining the second input data, the team module 214 may form the low complexity ticket team based on the second input data and a predefined resource identification criterion. In one implementation, the team module 214 may select the human resources from the human resource data and form one or more teams. The predefined identification criterion comprises the total amount of work experience, education data, and volume of ticket to resolve, primary skill of the human resource in a given technology, tenure in a technology.In one example, the total amount of work experience may be 2-4 years, education data may be engineering, and volume of ticket to resolve may be 5 per day, primary skill of the human resource in a given technology may be UNIX™; tenure in a technology may be 6 months.Furthermore the team module 214 may store the team structure or list of team members in system data 222.
WORK PROCESS MODULE 216
[033] In the implementation, the work process module 216 may obtain third input data. The third input may comprises project data, and customer data. Further, the work process module 216 may store the third input data in system data 222.
[034] Further to obtaining third input data, the work process module 216 may define the low complexity resolution process for the low complexity ticket to be performed by the low complexity ticket team. The low complexity resolution process may be based on the third input data and a predefined resolution criterion. The predefined resolution criterion comprises time required for resolution of the ticket. In one example the time required for resolution of the ticket may be 1 hour. Further, in one example the low complexity resolution process may comprises escalation rules and swing rules. An escalation rule may be understood as transferring the ticket to a subject matter expert when ticket 50 % time required for resolution is passed. A Swing rules may be understood transferring the ticket to a subject matter expert when the current resource capacity is not able to handle ticket volume.
[035] Further, the work process module 216 may store the low complexity resolution process in system data 222.
RESOLUTION MODULE 218
[036] In the implementation the resolution module 218 may receive a ticket for resolution from a customer in the information technology framework.The ticket comprises at least one of an issue, an error and a problem being faced by the customer. The resolution module 218 may store the ticket in system data 222.
[037] Upon receiving the ticket, the resolution module 218 may classify the ticket as a low complexity activity or a non-low complexity activity. In one example the classification may be based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity. Further, the tickets classified as low complexity activity may be stored in the system data 222. In one other example, the tickets classified as non-low complexity activity may be forwarded to a subject matter expert’s team for resolution.
[038] Further to classification of the ticket, the resolution module 218 may assign the ticket classified as the low complexity activity to the low complexity ticket team for providing a resolution to the ticket. The low complexity ticket team is at least one of a cross functional and cross technology team.
[039] Finally after assignment of the ticket classified as low complexity activity, the resolution module 218 may enable generation of the resolution. The resolution may be based on a low complexity resolution process for providing the resolution to the ticket. The low complexity resolution process may be executed by the low complexity ticket team.
[040] Exemplary embodiments discussed above may provide certain advantages. Though not required to practice aspects of the disclosure, these advantages may include those provided by the following features.
[041] Some embodiments of the system and the method enables improved consistency of response through building the low complexity team on end to end delivery of pooling common activities across different technology.
[042] Some embodiments of the system and the method reduce follow-ups.
[043] Some embodiments of the system and the method reduced skill variability by aligning human resources to functions and technologies (right work to right skill) ensuring retention of human resources.
[044] Some embodiments of the system and the method enable focused effort on more complex and urgent tasks.
[045] Some embodiments of the system and the method enable freeing up the time of senior technical resources and let them invest it in doing High complexity analysis, mentoring future planning for capacity and improvement of services.
[046] Some embodiments of the system and the method enable improved employee motivation through opportunity to develop deeper expertise on core skill areas, leading to overall improvement in resource quality and job satisfaction.
[047] Some embodiments of the system and the method enable avoid unnecessary escalations.
[048] Some embodiments of the system and the method enable sharing of experience between the team members.
[049] Referring now to Figure 3, a method 300 for providing a resolution to a ticket in a lean information technology framework is shown, in accordance with an embodiment of the present subject matter. The method 300 may be described in the general context of computer executable instructions. Generally, computer executable instructions can include routines, programs, objects, components, data structures, procedures, modules, functions, etc., that perform particular functions or implement particular abstract data types.
[050] The order in which the method 300 is described is not intended to be construed as a limitation, and any number of the described method blocks can be combined in any order to implement the method 300 or alternate methods. Additionally, individual blocks may be deleted from the method 300 without departing from the spirit and scope of the subject matter described herein. Furthermore, the method can be implemented in any suitable hardware, software, firmware, or combination thereof. However, for ease of explanation, in the embodiments described below, the method 300 may be considered to be implemented in the above described system102.
[051] At block 302,an activity complexity database is configured. The activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework. In an implementation, the activity complexity module 212 may configure the activity complexity database based on a plurality of low complexity activities and store the activity complexity database in system data 222.
[052] At block 304,a ticket for resolution is received from a customer in the information technology framework. The ticket comprises at least one of an issue, an error and a problem being faced by the customer.In the implementation, the resolution module 218 may receive a ticket for resolution and store the ticket in system data 222.
[053] At block 306, the ticket may be classified as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database. In the implementation, the resolution module 218 may classify the ticket as a low complexity activity or a non-low complexity activity and store the ticket in system data 222.In one more implementation the resolution module 218 may provide the activity complexity database to a low complexity ticket team for classification of the ticket in to alow complexity activity or a non-low complexity activity.
[054] At block 308, the ticket classified as the low complexity activity may be assigned to a low complexity ticket team for providing a resolution to the ticket in the information technology framework. The low complexity ticket team is at least one of a cross functional and cross technology team. In the implementation, the resolution module 218 may assign the ticket assigned to a low complexity ticket team for providing a resolution to the ticket in the information technology framework and store the resolution in system data 222.
[055] Exemplary embodiments discussed above may provide certain advantages. Though not required to practice aspects of the disclosure, these advantages may include for providing a resolution to a ticket in a lean information technology framework. Although implementations for methods and system for providing a resolution to a ticket in a lean information technology framework have been described in language specific to structural features and/or methods, it is to be understood that the appended claims are not necessarily limited to the specific features or methods described. Rather, the specific features and methods are disclosed as examples of implementations for providing a resolution to a ticket in a lean information technology framework.

Claims:WE CLAIM:

1. A method for providing a resolution to a ticket in an lean information technology framework, the method comprising:
configuring, by a processor, a activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework;
receiving, by the processor, a ticket for resolution from a customer in the information technology framework, wherein the ticket comprises at least one of an issue, an error and a problem being faced by the customer;
classifying, by the processor, the ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database; and
assigning, by the processor, the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework, wherein the low complexity ticket team is at least one of a cross functional and cross technology team.

2. The method of claim 1 further comprising:
generating, by the processor, theresolution based on a low complexity resolution process for providing the resolution to the ticket, wherein the low complexity resolution process is executed by the low complexity ticket team.

3. The method of claim 1 further comprising:
obtaining, by the processor, first input data, wherein the first input data comprises historical activities data, activities resolution trend data, activities time to resolve data, and activities average monthly volume; and
identifying, by the processor, the one or more low complexity activities for each of the industry segments and technology tracks based on the first input data and a predefined activities identification criterion, wherein the predefined activities identification criteria comprises type of environment, impact on environment, and time to resolve the activities.

4. The method of claim 1 further comprising:
obtaining, by the processor, second input data, wherein the second input comprises human resource data, skill data, resource work experience data, training data, education data and volume of ticket to be resolved data; and
forming, by the processor, the low complexity ticket team based on the second input data and a predefined resource identification criterion, wherein the predefined identification criterion comprise the total amount of work experience, education data, and volume of ticket to resolved.

5. The method of claim 2 further comprising:
obtaining, by the processor, third input data, wherein the third input comprises project data, and customer data; and
defining, by the processor, the low complexity resolution process resolution process for the low complexity ticket to be performed by the low complexity ticket team based on the third input data and a predefined resolution criterion; wherein the predefined resolution criterion comprises time required for resolution of the ticket.

6. A system for providing a resolution to a ticket in an lean information technology framework, the system comprising:
a memory; and
a processor coupled to the memory, wherein the processor is capable of executing instructions stored in the memory, to perform steps of:
configuring a activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework;
receiving a ticket for resolution from a customer in the information technology framework, wherein the ticket comprises at least one of an issue, an error and a problem being faced by the customer;
classifying the ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database; and
assigningthe ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework, wherein the low complexity ticket team is at least one of a cross functional and cross technology team.

7. The system of claim 6 further comprising:
generating theresolution based on a low complexity resolution process for providing the resolution to the ticket, wherein the low complexity resolution process is executed by the low complexity ticket team.

8. The system of claim 6 further comprising:
obtaining first input data, wherein the first input data comprises historical activities data, activities resolution trend data, activities time to resolve data, and activities average monthly volume; and
identifying the one or more low complexity activities for each of the industry segments and technology tracks based on the first input data and a predefined activities identification criterion, wherein the predefined activities identification criteria comprises type of environment, impact on environment, and time to resolve the activities.

9. The system of claim 6 further comprising:
obtaining second input data, wherein the second input comprises human resource data, skill data, resource work experience data, training data, education data and volume of ticket to be resolved data; and
forming the low complexity ticket team based on the second input data and a predefined resource identification criterion, wherein the predefined identification criterion comprise the total amount of work experience, education data, and volume of ticket to resolved.

10. The system of claim 7 further comprising:
obtaining third input data, wherein the third input comprises project data, and customer data; and
defining the low complexity resolution process resolution process for the low complexity ticket to be performed by the low complexity ticket team based on the third input data and a predefined resolution criterion; wherein the predefined resolution criterion comprises time required for resolution of the ticket.

11. A non-transitory computer program product having embodied thereon a computer program for providing a resolution to a ticket in an lean information technology framework, the computer program product storing instructions, the instructions comprising instructions for:
obtaining first input data for one or more industry segments and one or more technology tracks, wherein the first input data comprises historical activities data, activities resolution trend data, activities time to resolve data, and activities average monthly volume;
identifying the one or more low complexity activities for each of the industry segments and technology tracks based on the first input data and a predefined activities identification criterion, wherein the predefined activities identification criteria comprises type of environment, impact on environment, and time to resolve the activities;
configuring a activity complexity database based on a plurality of low complexity activities identified across industry segments and technology tracks in an information technology framework;
receiving a ticket for resolution from a customer in the information technology framework, wherein the ticket comprises at least one of an issue, an error and a problem being faced by the customer;
classifyingthe ticket as a low complexity activity or a non-low complexity activity based on a comparison of the ticket with the plurality of low complexity activities stored in the activity complexity database;
assigning the ticket classified as the low complexity activity to a low complexity ticket team for providing a resolution to the ticket in the information technology framework, wherein the low complexity ticket team is at least one of a cross functional and cross technology team; and
generating the resolution based on a low complexity resolution process for providing the resolution to the ticket, wherein the low complexity resolution process is executed by the low complexity ticket team.

12. A non-transitory computer program product of claim 11 further comprising:
obtaining second input data, wherein the second input comprises human resource data, skill data, resource work experience data, training data, education data and volume of ticket to be resolved data;
forming the low complexity ticket team based on the second input data and a predefined resource identification criterion, wherein the predefined identification criterion comprise the total amount of work experience, education data, and volume of ticket to resolved;
obtaining third input data, wherein the third input comprises project data, and customer data; and
defining the low complexity resolution process resolution process for the low complexity ticket to be performed by the low complexity ticket team based on the third input data and a predefined resolution criterion; wherein the predefined resolution criterion comprises time required for resolution of the ticket.

Documents

Application Documents

# Name Date
1 2783-DEL-2015-FER.pdf 2020-01-16
1 Form 3 [04-09-2015(online)].pdf 2015-09-04
2 2783-DEL-2015-FORM 3 [03-05-2018(online)].pdf 2018-05-03
3 Form 3 [05-12-2016(online)].pdf 2016-12-05
3 Drawing [04-09-2015(online)].pdf 2015-09-04
4 Description(Complete) [04-09-2015(online)].pdf 2015-09-04
4 Request For Certified Copy-Online.pdf 2016-07-20
5 REQUEST FOR CERTIFIED COPY [18-07-2016(online)].pdf 2016-07-18
5 2783-del-2015-Form-1-(04-11-2015).pdf 2015-11-04
6 REQUEST FOR CERTIFIED COPY [18-07-2016(online)].pdf_59.pdf 2016-07-18
6 2783-del-2015-Correspondence Others-(04-11-2015).pdf 2015-11-04
7 2783-del-2015-GPA-(17-12-2015).pdf 2015-12-17
7 2783-del-2015-Correspondence Others-(17-12-2015).pdf 2015-12-17
8 2783-del-2015-GPA-(17-12-2015).pdf 2015-12-17
8 2783-del-2015-Correspondence Others-(17-12-2015).pdf 2015-12-17
9 REQUEST FOR CERTIFIED COPY [18-07-2016(online)].pdf_59.pdf 2016-07-18
9 2783-del-2015-Correspondence Others-(04-11-2015).pdf 2015-11-04
10 2783-del-2015-Form-1-(04-11-2015).pdf 2015-11-04
10 REQUEST FOR CERTIFIED COPY [18-07-2016(online)].pdf 2016-07-18
11 Description(Complete) [04-09-2015(online)].pdf 2015-09-04
11 Request For Certified Copy-Online.pdf 2016-07-20
12 Form 3 [05-12-2016(online)].pdf 2016-12-05
12 Drawing [04-09-2015(online)].pdf 2015-09-04
13 2783-DEL-2015-FORM 3 [03-05-2018(online)].pdf 2018-05-03
14 Form 3 [04-09-2015(online)].pdf 2015-09-04
14 2783-DEL-2015-FER.pdf 2020-01-16

Search Strategy

1 TPO2783DEL2015_15-01-2020.pdf