Abstract: An administration system administers a storage system and a server computer. The administration system: (A) acquires from the storage system storage level pool information which includes information of the capacity of a storage level pool; (B) acquires from the server computer server level pool information which includes information of the capacity of a server level pool; (C) determines on the basis of the storage level pool information a first degree of risk which denotes the risk of the available capacity of the storage level pool being used up; (D) determines on the basis of the server level pool information a second degree of risk which denotes the risk of the available capacity of the server level pool being used up; and (E) displays information relating to the first degree of risk and the second degree of risk which denote risk of the available capacity of the storage level pool and the server level pool being used up.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
13 March 2015
Publication Number
33/2015
Publication Type
INA
Invention Field
COMPUTER SCIENCE
Status
Email
Parent Application

Applicants

HITACHI LTD.
6 6 Marunouchi 1 chome Chiyoda ku Tokyo 1008280

Inventors

1. NODA Mitsumasa
c/o IT Platform Division Group HITACHI LTD. 292 Yoshida cho Totsuka ku Yokohama shi Kanagawa 2440817
2. UCHIDA Tomohito
c/o IT Platform Division Group HITACHI LTD. 292 Yoshida cho Totsuka ku Yokohama shi Kanagawa 2440817
3. TAKAMOTO Yoshifumi
c/o IT Platform Division Group HITACHI LTD. 292 Yoshida cho Totsuka ku Yokohama shi Kanagawa 2440817

Specification

[Technical Field]
[0001]
The present invention relates to a technique for managing a storage system
and a server computer.
[Background Art]
[0002]
In recent years, a capacity virtualization technique has been used for a
storage system and a server computer for the purpose of increasing the
intensity to reduce a cost. As the capacity virtualization technique, there
can be mentioned a virtual hard disk that is configured to be used for a
virtual computer (VM) for instance. For a virtual hard disk file, there are a
virtual hard disk of a fixed type in which a file of a size that is equivalent to a
disk size of a virtual hard disk is prepared in creation and a virtual hard disk
of a variable type in which a file size is extended in accordance with a volume
usage size on a virtual hard disk. The virtual hard disk of a variable type
consumes only a capacity that is being used as a practical matter.
Consequently, an extra capacity is not consumed and a resource can be
utilized with no waste. A similar capacity virtualization technique exists
for a storage system.
[0003]
In the case where such a capacity virtualization technique is used, since an
actual physical capacity and a logical capacity that is allocated to a
server/virtual server (virtual machine) are greatly different from each other,
a management has a tendency to be complicated. Moreover, in the case
where a physical capacity is depleted, there is a real possibility that a work is
stopped by a disk I/O error and a virtual computer that is configured to use a
virtual hard disk of a variable type on a volume in which a capacity has been
depleted is stopped.
[0004]
3
As a technique for simplifying a management of a computer system in which
a capacity virtualization technique is used and a management is complicated,
a technique that is disclosed in Patent Literature 1 is publicly known. The
technique that is disclosed in Patent Literature 1 is a technique for executing
an extension of a storage pool and a migration of a virtual server in the case
where a value that is called an END-TO-END leverage ratio that is a ratio of
a total capacity of one or more server level virtual volumes that are
corresponded to a storage level pool to a capacity of the storage level pool
exceeds a threshold value.
[Citation List]
[Patent Literature]
[0005]
[PTL 1]
Japanese Patent Publication No. 4815518
[Summary of Invention]
[Technical Problem]
[0006]
The technique that is disclosed in Patent Literature 1 is a technique that is
effective for adjusting a ratio of a logical allocation capacity to a total
physical capacity of a computer system in such a manner that the ratio is
suppressed to be within a certain value. However, there is a real possibility
that a processing of a computer system is stopped, for instance, a stoppage of
a virtual machine cannot be detected in an appropriate manner.
[0007]
Such a situation will be described by citing a specific example in the
following.
[0008]
Fig. 28 is a view showing an example of a status for a computer system in
which a capacity virtualization according to a Thin-Provisioning technique is
carried out for the both of a storage system and a server computer.
[0009]
The total capacity of a storage level pool (LLP) of a storage system is 300 GB
4
and a used capacity thereof is 100 GB. The total capacity of LL-VVOL1 in a
storage level virtual volume (LL-VVOL) that has been configured for the LLP
is 100 GB and a used capacity thereof is 90 GB. The total capacity of
LL-VVOL2 is 100 GB and a used capacity thereof is 10 GB. The total
capacity of HLP1 that is a server level pool (HLP) that is configured by
LL-VVOL1 is 100 GB and a used capacity thereof is 90 GB. Moreover, the
total capacity of HLP2 that is a server level pool (HLP) that is configured by
LL-VVOL2 is 100 GB and a used capacity thereof is 10 GB.
[0010]
The total capacity of HL-VVOL1 in a server level virtual volume (HL-VVOL)
that is configured for the HLP1 is 100 GB and a used capacity thereof is 40
GB. The total capacity of HL-VVOL2 that is configured for the HLP1 is 50
GB and a used capacity thereof is 20 GB. The total capacity of HL-VVOL3
that is configured for the HLP2 is 50 GB and a used capacity thereof is 10
GB.
[0011]
In the status shown in Fig. 28, the total capacity of the HLP1 is 100 GB and
a used capacity thereof is 90 GB. Consequently, a remaining capacity that
can be used is only 10 GB and there is a real possibility that a capacity of the
HLP1 is depleted. In the case where a capacity of the HLP1 is depleted,
there is a real possibility that the virtual servers (VM1 and VM2) that are
operated using an area on the HLP1 are stopped.
[0012]
On the other hand, according to the technique that is disclosed in Patent
Literature 1, in the status shown in Fig. 28, a capacity of the LLP is 300 GB
and the total capacity of all HL-VVOLs that are corresponded to the LLP is
200 GB. Consequently, an END-TO-END leverage ratio that is calculated
to be 100*(200/300) = 67%. Since an END-TO-END leverage ratio is 67%, it
is indicated that the total capacity that has been allocated to a virtual
machine sufficiently falls within a physical capacity that is included in the
storage system. In addition, a manager (user) cannot recognize that there
is a real possibility that the virtual server is stopped.
5
[Solution to Problem]
[0013]
A management system is configured to manage a storage system configured
to comprise one or more volumes which belongs to a storage level pool and a
server computer coupled to the storage system and configured to execute a
computer program.
[0014]
The storage system is configured to supply a storage level virtual volume
that is associated with the storage level pool, and an or all areas of the
storage level virtual volume are areas to which areas in the one or more
volumes which belong to the storage level pool are not allocated. The server
computer is configured to manage a server level pool to which the storage
level virtual volume belongs and is configured to supply a server level virtual
volume that is associated with the server level pool.
[0015]
The management system comprises a communication interface device, a
storage device, and a processor that is coupled to the communication
interface device and the storage device. The communication interface
device is configured to communicate with the storage system and the server
computer. The processor is configured to (A) acquire the storage level pool
information that includes the information of a capacity of the storage level
pool from the storage system and store the storage level pool information to
the storage device, (B) acquire the server level pool information that includes
the information of a capacity of the server level pool from the server
computer and store the server level pool information to the storage device,
(C) determine a first risk degree that indicate a risk of a depletion of a free
capacity of the storage level pool based on the storage level pool information,
(D) determine a second risk degree that indicate a risk of a depletion of a free
capacity of the server level pool based on the server level pool information,
and (E) display the information that is associated with the first risk degree
that indicate a risk of a depletion of a free capacity of the storage level pool
and the second risk degree that indicate a risk of a depletion of a free
6
capacity of the server level pool. The communication interface device can
also be a plurality of communication interface devices of different types.
The storage device can also be a plurality of storage devices, for instance, a
memory such as a main storage device and a storage device such as an
auxiliary storage device.
[Advantageous Effects of Invention]
[0016]
According to the present invention, a risk of a stoppage of a wide variety of
processing in which a server level pool and a storage level pool are utilized
can be detected in an appropriate manner for the computer system.
[Brief Description of Drawings]
[0017]
[Fig. 1]
Fig. 1 is a view showing a configuration of a computer system according to an
embodiment of the present invention.
[Fig. 2]
Fig. 2 is a view showing a configuration of a management server 100.
[Fig. 3A]
Fig. 3A is a view showing an example of a configuration of a volume
information table 1000.
[Fig. 3B]
Fig. 3B is a view showing an example of a configuration of a storage level
pool information table 1100.
[Fig. 4A]
Fig. 4A is a view showing an example of a configuration of a storage level
virtual volume information table 1200.
[Fig. 4B]
Fig. 4B is a view showing an example of a configuration of a server level pool
information table 1300.
[Fig. 5A]
Fig. 5A is a view showing an example of a configuration of a server level
virtual volume information table 1400.
7
[Fig. 5B]
Fig. 5B is a view showing an example of a configuration of a virtual server
level file system information table 1500.
[Fig. 6A]
Fig. 6A is a view showing an example of a configuration of a server level
virtual volume extension table 1700.
[Fig. 6B]
Fig. 6B is a view showing an example of a configuration of an unnecessary
virtual server table 1600.
[Fig. 7A]
Fig. 7A is a view showing an example of a configuration of a migration table
1900.
[Fig. 7B]
Fig. 7B is a view showing an example of a configuration of a storage level
pool extension table 1800.
[Fig. 8A]
Fig. 8A is a view showing an example of a configuration of an inter-storage
level pool volume adjustment table 2000.
[Fig. 8B]
Fig. 8B is a view showing an example of a configuration of a virtual server
risk degree table 2100.
[Fig. 9]
Fig. 9 is a view showing an example of a configuration of a virtual server
information table 2200.
[Fig. 10]
Fig. 10 is a flowchart of a risk degree calculation processing of an HLP.
[Fig. 11]
Fig. 11 is a flowchart of a discrepancy degree calculation processing of an
HLP.
[Fig. 12]
Fig. 12 is a view for illustrating a risk degree determination.
[Fig. 13]
8
Fig. 13 is a flowchart of an influence degree calculation processing of an HLP.
[Fig. 14]
Fig. 14 is a flowchart of a risk degree calculation processing of a VM.
[Fig. 15]
Fig. 15 is a view showing an example of a display screen for displaying a risk
degree of a storage level pool and a server level pool.
[Fig. 16]
Fig. 16 is a flowchart of a coping execution availability determination
processing.
[Fig. 17]
Fig. 17 is a flowchart of a coping execution availability determination
processing of an HLP.
[Fig. 18]
Fig. 18 is a flowchart of a coping execution availability determination
processing of an LLP.
[Fig. 19]
Fig. 19 is a flowchart of an HL-VVOL capacity reduction availability
determination processing for an HLP.
[Fig. 20]
Fig. 20 is a flowchart of an extension availability determination processing of
an HLP.
[Fig. 21]
Fig. 21 is a flowchart of an unnecessary VM deletion availability
determination processing.
[Fig. 22]
Fig. 22 is a flowchart of a migration execution availability determination
processing between HLPs.
[Fig. 23]
Fig. 23 is a flowchart of an HL-VVOL capacity reduction availability
determination processing for an LLP.
[Fig. 24]
Fig. 24 is a flowchart of an extension availability determination processing of
9
an LLP.
[Fig. 25]
Fig. 25 is a flowchart of a VOL adjustment availability determination
processing between LLPs.
[Fig. 26]
Fig. 26 is a view showing an example of a display screen for displaying an
executable coping and a VM risk status.
[Fig. 27]
Fig. 27 is a view showing an example of a display screen for displaying a
selection and a simulation result of an executable coping.
[Fig. 28]
Fig. 28 is a view showing an example of a status for a computer system.
[Description of Embodiments]
[0018]
An embodiment will be described with reference to drawings in the following.
The embodiment that will be described in the following do not restrict the
invention according to the claims, and all of elements and all of combinations
of the elements that will be described in the embodiment are not necessarily
essential for the means for solving the problems of the invention.
[0019]
In the following descriptions, while the information according to the present
invention will be described in the expression such as “aaa table” in some
cases, the information can be represented by other than the data structure
such as a table. In order to indicate that the information is not depended on
a data structure, the expression of “aaa table” can also be referred to as “aaa
information” in some cases.
[0020]
In the following descriptions, the processing will be described while a
“program” or a program module is handled as a subject in some cases. In
the case where the program or the program module is executed by a
processor (CPU (Central Processing Unit) in a quintessential way), the
predetermined processing is executed while using a memory and an I/F
10
(interface). Consequently, a subject of a processing can also be a processor.
The processing that is disclosed while a program is handled as a subject can
also be a processing that is executed by a management system (for instance,
a management server that will be described later). Moreover, a part or a
whole of a program can also be implemented by a dedicated hardware. A
wide variety of programs can be installed to each of the computers by a
program distribution server or a storage medium that can be read by a
computer. The storage medium can also be an IC card, an SD card, and a
DVD for instance.
[0021]
Moreover, an aggregate of one or more computers that are configured to
manage a computer system and to display the display information may be
called a management system in some cases. In the case where a
management server displays the display information, the management
server is a management system. Moreover, a combination of the
management server and a display computer is also a management system.
A processing that is equivalent to the management server can also be
implemented by using a plurality of computers for speeding up and
increasing reliability for a management processing. In this case, the
plurality of computers is a management system (in the case where a display
is executed by the display computer, the display computer can also be
included in the plurality of computers).
[0022]
An act of “display” of a management system (or a processor) can also be any
one of an act of displaying the information on a display device of the
management system by the management system and an act of transmitting
the information that is displayed on a display device to another computer
that is provided with a display device by the management system.
[0023]
A “volume” is a logical storage area (a logical volume) that is supplied based
on one or more physical storage devices (such as hard disk drives or flash
memories). The volume is supplied based on a storage space of a RAID
11
(Redundant Array of Independent (or Inexpensive) Disks) group for instance.
The RAID group is configured by a plurality of physical storage devices, and
data is stored according to a determined RAID level. The “volume” can also
be written as VOL in some cases.
[0024]
A “storage level pool” is a pool that is constructed by one or more volumes.
An area of the storage level pool is allocated to a write destination area from
a physical server for a storage level virtual volume. The storage level pool
can also be an aggregate of a plurality of pools (virtual pools) to which one or
more volume belong. The “storage level pool” is an example of a lower level
pool and is written as LLP in some cases.
[0025]
A “storage level virtual volume” is a virtual volume that is supplied by a
storage controller. All of areas (storage areas) of the storage level virtual
volume are not necessarily allocated to a physical storage area. More
specifically, an area of one or more volumes that belong to the storage level
pool is not allocated to a part or a whole of areas of the storage level virtual
volume in the initial stage for instance. In other words, An area of the
storage level pool can also be allocated to an area of the storage level virtual
volume in the initial stage for instance. Here, the initial stage is immediately
after the storage level virtual volume is defined or after the storage level
virtual volume is defined and is accessible from a physical server for instance.
The “storage level virtual volume” is written as LL-VVOL in some cases.
[0026]
A “server level pool” is a storage area that is constructed from one or more
storage level virtual volumes to which a server (a physical server or a virtual
server) has been allocated from the storage system. The server level pool is
used from a virtual server via a server level virtual volume. More
specifically, in the case where data is written from a virtual server to a server
level virtual volume, an area of a server level pool is allocated to a write
destination area of the data (an area of a server level virtual volume). A
write request that specifies an area in the storage level virtual volume that
12
is corresponded to an area that have been allocated is transmitted from a
physical server to a storage system that supplies the storage level virtual
volume. A storage controller of the storage system allocates an area in the
storage level pool to an area that is specified by the write request (an area in
the storage level virtual volume) in response to the write request, and writes
data to the area that has been allocated. More specifically, data is written
to a physical storage area (an area in a physical storage device) that is a
basis of the area that has been allocated (an area in the storage level pool).
The “server level pool” is an example of an upper level pool and is written as
HLP in some cases.
[0027]
A “server level virtual volume” is a virtual volume that is constructed by a
virtualization program of a server. All of storage areas of the server level
virtual volume are not necessarily allocated to a physical storage area. A
storage area of the server level virtual volume is accessed by a virtual server.
The server level virtual volume is recognized as a virtual hard disk (VHD) for
a server level pool. The “server level virtual volume” is written as
HL-VVOL in some cases.
[0028]
The server level virtual volume is managed in such a manner that a capacity
of a volume is extended in accordance with a used capacity of a volume on a
virtual hard disk. However, even in the case where a used capacity of a
volume on a virtual hard disk is reduced, a capacity of a volume that has
been extended is not reduced in an automated way. In the present
embodiment, a capacity reduction processing is executed in which a capacity
that is equal to or larger than a used capacity on a virtual hard disk for the
server level virtual volume is reduced to be a capacity that is equivalent to a
used capacity on a virtual hard disk. The processing in which a capacity
that is equal to or larger than a used capacity on a virtual hard disk for the
server level virtual volume is reduced to be a capacity that is equivalent to a
used capacity on a virtual hard disk is referred to as a “capacity reduction of
the server level virtual volume”.
13
[0029]
A computer system according to the present embodiment will be described in
the first place.
[0030]
For the computer system according to the present embodiment, a
management server collects the storage level pool information from the
storage system, collects the server level storage pool information from
physical server of a management target, analyzes a risk of that the storage
level pool and the server level pool provoke a stoppage of the processing from
the acquired information, and displays the result of the analysis. The
details will be described in the following.
[0031]
Fig. 1 is a view showing a configuration of a computer system according to an
embodiment of the present invention.
[0032]
The computer system is provided with a storage system 300, a physical
server 200, and a management server 100. The number of at least one of
the storage system 300, the physical server 200, and the management server
100 can be a plural number. Moreover, the storage system 300 can also be
hierarchized.
[0033]
The storage system 300 and the physical server 200 are coupled to each other
via a communication network, such as a SAN 10 and a LAN 20. The SAN
10 can include an FC (Fibre channel) switch 11 for instance. The
management server 100 is coupled to the storage system 300 and the
physical server 200 via a communication network, such as a SAN 10 and a
LAN 20.
[0034]
The storage system 300 is provided with a plurality of PDEV (physical
storage devices) and a plurality of storage controllers (CTL). The PDEV
and the storage controllers are coupled to each other by using an internal
network or a bus for instance. The storage controller stores data in a
14
storage area based on the PDEV. The storage controller is provided with a
processor, a memory, a management I/F 310 and so on. The management
I/F 310 is an interface that is coupled to the physical server 200 and the
management server 100 via the LAN 20.
[0035]
The storage system 300 is provided with a storage level pool 330 that is
configured by the storage areas of a plurality of PDEV. For the storage
system 300, one or more storage level virtual volumes 320 (such as
LL-VVOL1 and LL-VVOL2) to which an area of the storage level pool 330 is
allocated are constructed.
[0036]
The physical server 200 is an example of a server computer and is provided
with a processor, a memory, an HBA 230, and a NIC (Network Interface
Card) 240. The processor, the memory, the HBA 230, and the NIC (Network
Interface Card) 240 are coupled to each other by using an internal network.
[0037]
The HBA 230 is an interface that is coupled to the storage system 300 via a
network such as the SAN 10 and the LAN 20. More specifically, the HBA
230 outputs an I/O request from the processor to the storage system 300 for
instance. The NIC 240 is an interface that is coupled to the storage system
300 and the management server 100 via the LAN 20.
[0038]
For the physical server 200, the processor executes a program that is stored
in a memory to carry out a wide variety of processing. For instance, by
transmitting an I/O request (a write request or a read request) to the storage
system 300, the processor can execute an input/output (a write or a read) of
data to one or more storage level virtual volumes 320 that are supplied by
the storage system 300.
[0039]
For the physical server 200, by executing a server virtualization program,
the processor constructs one or more virtual server environments (a virtual
server 210) by using a physical resource that is included in the physical
15
server 200. For the physical server 200, a server level pool 220 is
constructed. In the present embodiment, the HLP1 of the physical server 1
is constructed by LL-VVOL1, and the HLP2 of the physical server 2 is
constructed by LL-VVOL2.
[0040]
For the virtual server (VM) 210, a server level virtual volume 212 is
constructed. In the present embodiment, the HL-VVOL1based on the HLP1
is constructed for the VM1, the HL-VVOL2 based on the HLP1 is constructed
for the VM2, and the HL-VVOL3 based on the HLP2 is constructed for the
VM3. Moreover, for the virtual server 210, one or more file systems (VFS)
211 are constructed for managing an access to data in a file unit. In the
present embodiment, the VFS1 and VFS2 are constructed on the HL-VVOL1
for the VM1, the VFS3 is constructed on the HL-VVOL2 for the VM2, and the
VFS4 is constructed on the HL-VVOL3 for the VM3.
[0041]
Fig. 2 is a view showing a configuration of a management server 100.
[0042]
The management server 100 is a computer that is provided with a processor
140, a memory 110, and a NIC 150. The processor 140, the memory 110,
and the NIC 150 are coupled to each other by an internal network.
[0043]
The processor 140 carries out a wide variety of processing by executing a
program that is stored in the memory 110.
[0044]
The memory 110 stores a program that is executed by the processor 140 and
the information that is required by the processor 140. For instance, the
memory 110 stores a management program 120 and a storage part 130.
The memory 110 can be a semiconductor memory, a storage device, or a
combination thereof.
[0045]
The management program 120 manages a storage system 300 and a physical
server 200. The management program 120 includes an information
16
collection processing part 1210, a risk degree calculation part 1220, a
cause/improvement point selection part 1230, a coping execution availability
determination part 1240, and a coping simulation part 1250.
[0046]
The information collection processing part 1210 collects the information that
is associated with a configuration of a storage level pool and the information
that is associated with a configuration of a storage level virtual volume from
the storage system 300 for instance. The information collection processing
part 1210 collects the information that is associated with a configuration of a
server level pool and the information that is associated with a configuration
of a server level virtual volume from the physical server 200 for instance.
Moreover, the information collection processing part 1210 can also acquire
the necessary information from the information that has been acquired by
other program of the management server 100 without acquiring the
information from the storage system 300 and the physical server 200 in a
direct manner. The risk degree calculation part 1220 calculates a risk
degree that is an index for indicating a risk that raises a stoppage of a
processing for a storage level pool and a server level pool and executes a
processing for analyzing a risk. The cause/improvement point selection
part 1230 selects a point of a cause that raises a stoppage of a processing and
executes a processing for selecting a point that can improve a risk. The
coping execution availability determination part 1240 executes a processing
for determining whether or not a coping measure for improving a risk can be
executed. The coping simulation part 1250 executes a simulation for a
coping measure that has been determined as executable and executes a
processing for displaying a simulation result.
[0047]
The storage part 130 stores a wide variety of information. The storage part
130 stores a volume information table 1000, a storage level pool information
table 1100, a storage level virtual volume information table 1200, a server
level pool information table 1300, a server level virtual volume information
table 1400, a virtual server level file system information table 1500, an
17
unnecessary virtual server table 1600, a server level virtual volume
extension table 1700, a storage level pool extension table 1800, a migration
table 1900, an inter-storage level pool volume adjustment table 2000, a
virtual server risk degree table 2100, and a virtual server information table
2200.
[0048]
The volume information table 1000 stores the information that is associated
with a volume. The storage level pool information table 1100 stores the
information that is associated with storage level pool. The storage level
virtual volume information table 1200 stores the information that is
associated with a storage level virtual volume. The server level pool
information table 1300 stores the information that is associated with a
server level pool. The server level virtual volume information table 1400
stores the information that is associated with a server level virtual volume.
The virtual server level file system information table 1500 stores the
information that is associated with a virtual server level file system. The
unnecessary virtual server table 1600 stores the information that is
associated with an unnecessary virtual server. The server level virtual
volume extension table 1700 stores the information that is associated with
an extension of a server level virtual volume. The storage level pool
extension table 1800 stores the information that is associated with an
extension of a storage level pool. The migration table 1900 stores the
information that is associated with a migration of a server level virtual
volume. The inter-storage level pool volume adjustment table 2000 stores
the information that is associated with an adjustment of a volume between
storage level pools. The virtual server risk degree table 2100 stores the
information that is associated with a risk degree of a virtual server. The
virtual server information table 2200 stores the information that is
associated with a virtual server.
[0049]
The NIC 150 is an interface that is coupled to the physical server 200 and the
storage system 300 via a network such as the LAN 20.
18
[0050]
The management server 100 can be provided with an input/output device
160. The input/output device 160 in the management server 100 is also be
coupled to an internal network.
[0051]
It is thought that an example of the input/output device 160 is a display, a
keyboard, and a pointer device. However, the input/output device 160 can
also be an apparatus other than those. As substitute for the input/output
device 160, a serial interface and an Ethernet (registered trademark)
interface can also be used as the input/output device 160. Moreover, a
display computer that is provided with a display, a keyboard, or a pointer
device can also be coupled to the interface. The display information can also
be transmitted to the display computer, and the display information can also
be received from the display computer. By this configuration, a display for
the display computer can also be executed. By receiving an input, an
input/output for the input/output device 160 can also be executed.
[0052]
The management server 100 can also be divided into an apparatus for
managing the storage system 300 and an apparatus for managing the
physical server 200.
[0053]
Fig. 3A is a view showing an example of a configuration of a volume
information table 1000.
[0054]
The volume information table 1000 is provided with a record in which a
volume identifier 1000, a total capacity (TOTAL capacity) 1002, a used
capacity (USED capacity) 1003, a free capacity (FREE capacity) 1004, and a
disk device identifier 1005 are attribute values for every volume.
[0055]
The volume identifier 1000 is an identifier that is allocated to a volume.
The total capacity 1002 is a physical total capacity of a volume. The used
capacity 1003 is a capacity of an area to which data is written and that is
19
used as a practical matter in the total capacity. The free capacity 1004 is a
capacity of an area that is not used in the total capacity. The disk device
identifier 1005 is an identifier of a disk device that configures a volume. In
the case where a volume is configured by a plurality of disk devices, the disk
device identifier 1005 is an identifier of a plurality of disk devices.
[0056]
Fig. 3B is a view showing an example of a configuration of a storage level
pool information table 1100.
[0057]
The storage level pool information table 1100 is provided with a record in
which a storage level pool identifier 1101, a total capacity (TOTAL capacity)
1102, an allocated capacity (ASSIGNED capacity) 1103, a used capacity
(USED capacity) 1104, a free capacity (FREE capacity) 1105, a volume
identifier 1106, a reducible capacity (REDUCIBLE capacity) 1107, a
corresponded storage 1108, a risk degree 1109, and an influence degree 1110
are attribute values for every storage level pool.
[0058]
The storage level pool identifier 1101 is an identifier that is allocated to a
storage level pool. The total capacity 1102 is a physical total capacity of a
storage level pool. The allocated capacity1103 is a total value of a capacity
that has been virtually allocated as a storage level virtual volume. The
used capacity 1104 is a capacity of an area to which data is written and that
is used as a practical matter in the total capacity 1102. The free capacity
1105 is a capacity of an area that is not used in the total capacity 1102. The
volume identifier 1106 is an identifier of a volume that configures a storage
level pool. The reducible capacity 1107 is a capacity that can be reduced in
the case where a capacity reduction of a server level virtual volume is carried
out. The corresponded storage 1108 is an identifier of a storage system 300
to which a storage level pool belongs. The risk degree 1109 is a risk degree
(a first risk degree) to a depletion of a free capacity for the storage level pool.
The influence degree 1110 is an influence degree that indicates a degree of an
influence in the case where a depletion of a free capacity occurs.
20
[0059]
Fig. 4A is a view showing an example of a configuration of a storage level
virtual volume information table 1200.
[0060]
The storage level virtual volume information table 1200 includes the
information of a storage level pool to which a storage level virtual volume
belongs in addition to the information that is associated with a storage level
virtual volume. The storage level virtual volume information table 1200 is
provided with a record in which a storage level virtual volume identifier 1201,
a total capacity (TOTAL capacity) 1202, a used capacity (USED capacity)
1203, a free capacity (FREE capacity) 1204, and a storage level pool
identifier 1205 are attribute values for every storage level virtual volume.
[0061]
The storage level virtual volume identifier 1201 is an identifier that is
allocated to a storage level virtual volume. The total capacity 1202 is a total
capacity that has been allocated from a storage level pool to a storage level
virtual volume The used capacity 1203 is a capacity that is used in the total
capacity 1202. The free capacity 1204 is a capacity of an area that is not
used in the total capacity 1202. The storage level pool identifier 1205 is an
identifier of a storage level pool to which a storage level virtual volume
belongs.
[0062]
Fig. 4B is a view showing an example of a configuration of a server level pool
information table 1300.
[0063]
The server level pool information table 1300 includes the information of a
storage level virtual volume to which a server level pool belongs and the
information of a physical server in addition to the information that is
associated with a server level pool. The server level pool information table
1300 is provided with a record in which a server level pool identifier 1301, a
total capacity (TOTAL capacity) 1302, an allocated capacity (ASSIGNED
capacity) 1303, a used capacity (USED capacity) 1304, a free capacity (FREE
21
capacity) 1305, a storage level virtual volume identifier 1306, a reducible
capacity (REDUCIBLE capacity) 1307, a connection method 1308, a
corresponded physical server 1309, a risk degree 1310, and an influence
degree 1311 are attribute values for every server level pool.
[0064]
The server level pool identifier 1301 is an identifier that is allocated to a
server level pool. The total capacity 1302 is a total capacity that is allocated
from a storage level virtual volume. The allocated capacity 1303 is a total
value of a capacity that has been virtually allocated as a server level virtual
volume. The used capacity 1304 is a capacity of an area to which data is
written and that is used as a practical matter in the total capacity 1302.
The free capacity 1305 is a capacity of an area that is not used in the total
capacity 1302. The storage level virtual volume identifier 1306 is an
identifier of a storage level virtual volume that configures a server level pool.
The reducible capacity 1307 is a capacity that can be reduced in the case
where a capacity reduction of a server level virtual volume is carried out.
The connection method 1308 is a connection method to a storage level virtual
volume. The corresponded physical server 1309 is an identifier of a physical
server 200 to which a server level pool belongs. The risk degree 1310 is a
risk degree (a second risk degree) to a depletion of a free capacity for the
server level pool. The influence degree 1311 is an influence degree that
indicates a degree of an influence in the case where a depletion of a free
capacity occurs.
[0065]
Fig. 5A is a view showing an example of a configuration of a server level
virtual volume information table 1400.
[0066]
The server level virtual volume information table 1400 includes the
information of a server level pool to which a server level virtual volume
belongs in addition to the information that is associated with a server level
virtual volume. The server level virtual volume information table 1400 is
provided with a record in which a server level virtual volume identifier 1401,
22
a total capacity (TOTAL capacity) 1402, a used capacity (USED capacity)
1403, a free capacity (FREE capacity) 1404, a server level pool identifier
1405, a reducible capacity (REDUCIBLE capacity) 1406, a virtual hard disk
(VHD) type 1407, and a virtual hard disk file size 1408 are attribute values
for every server level virtual volume.
[0067]
The server level virtual volume identifier 1401 is an identifier that is
allocated to a server level virtual volume. The total capacity 1402 is a total
capacity that is virtually allocated from a server level pool. The used
capacity 1404 is a capacity of an area to which data is written and that is
used as a practical matter in the total capacity 1402. The free capacity 1404
is a capacity of an area that is not used in the total capacity 1402. The
server level pool identifier 1405 is an identifier of a server level pool to which
a server level virtual volume belongs. The reducible capacity 1406 is a
capacity that can be reduced by a capacity reduction. The virtual hard disk
type 1407 is a type of a virtual hard disk file (a variable type or a fixed type).
The variable type is a type for extending a file size of a virtual hard disk file
in accordance with a used capacity of a virtual hard disk. The fixed type is
a type for ensuring a file size of a total capacity of a virtual hard disk in the
case where a virtual hard disk file is created. In Fig. 5A, a variable type is
written as Dynamic, and a fixed type is written as Fixed. The virtual hard
disk file size 1408 is a file size of a virtual hard disk file.
[0068]
Fig. 5B is a view showing an example of a configuration of a virtual server
level file system information table 1500.
[0069]
The virtual server level file system information table 1500 includes the
information of a server level virtual volume to which a virtual server level
file system belongs in addition to the information that is associated with a
virtual server level file system. The virtual server level file system
information table 1500 is provided with a record in which a virtual server
level file system identifier 1501, a total capacity (TOTAL capacity) 1502, a
23
used capacity (USED capacity) 1503, a free capacity (FREE capacity) 1504, a
server level virtual volume identifier 1505, and a corresponded virtual server
identifier 1506 are attribute values for every virtual server level file system.
[0070]
The virtual server level file system identifier 1501 is an identifier that is
allocated to a virtual server level file system. The total capacity 1502 is a
total capacity that is allocated from a server level virtual volume. The used
capacity 1503 is a capacity of an area that is used in the total capacity 1502.
The free capacity 1504 is a capacity of an area that is not used in the total
capacity 1502. The server level virtual volume identifier 1505 is an
identifier of a server level virtual volume to which a virtual server level file
system belongs. The corresponded virtual server identifier 1506 is an
identifier of a virtual server that uses the virtual server level file system.
[0071]
Fig. 6A is a view showing an example of a configuration of a server level
virtual volume extension table 1700.
[0072]
The server level virtual volume extension table 1700 is provided with a
record in which an improvement point (a server level pool identifier) 1701, an
extensibility 1702, a storage level pool identifier 1703, and a maximum
extensible capacity 1704 are attribute values.
[0073]
The improvement point (a server level pool identifier) 1701 is a point of a
target in which a risk degree is improved. In the present embodiment, the
improvement point 1701 is an identifier of a server level pool of a target that
is improved. The extensibility 1702 is an extensibility for the improvement
point 1701. The extensibility 1702 is any one of an “extensible” that
indicates that an extension is possible, “HLP extensible after LLP extension”
that indicates that a server level pool can be extended after a storage level
pool is extended, and “extension impossible” that indicates that an extension
is not possible. The storage level pool identifier 1703 is an identifier of a
storage level pool that is required to be extended. The maximum extensible
24
capacity 1704 is a maximum capacity that can be extended.
[0074]
Fig. 6B is a view showing an example of a configuration of an unnecessary
virtual server table 1600.
[0075]
The unnecessary virtual server table 1600 is provided with a record in which
an improvement point (a server level pool identifier) 1601, an unnecessary
virtual server identifier 1602, and a reducible capacity 1603 are attribute
values.
[0076]
The improvement point 1601 is a point of a target in which a risk degree is
improved. In the present embodiment, the improvement point 1601 is an
identifier of a server level pool of a target that is improved. The
unnecessary virtual server identifier 1602 is an identifier of a virtual server
that is unnecessary. The reducible capacity 1603 is a capacity that can be
deleted from a used capacity in the case where a virtual server that is
unnecessary is deleted.
[0077]
Fig. 7A is a view showing an example of a configuration of a migration table
1900.
[0078]
The migration table 1900 includes the information of a server level virtual
volume that can be migrated on a server level pool of an improvement target
and a server level pool of a migration destination. The migration table 1900
is provided with a record in which an improvement point (a server level pool
identifier) 1901, a migration destination server level pool identifier 1902, a
target server level virtual volume 1903, and a target server level virtual
volume capacity 1904 are attribute values.
[0079]
The improvement point (a server level pool identifier) 1901 is an identifier of
a server level pool that is a target that is improved. The migration
destination server level pool identifier 1902 is an identifier of a server level
25
pool of a migration destination of a server level virtual volume. The target
server level virtual volume 1903 is an identifier of a server level virtual
volume of a target of a migration. The target server level virtual volume
capacity 1904 is a capacity of a server level virtual volume of a target of a
migration.
[0080]
Fig. 7B is a view showing an example of a configuration of a storage level
pool extension table 1800.
[0081]
The storage level pool extension table 1800 is provided with a record in
which an improvement point (a server level pool identifier) 1801 and a
maximum extensible capacity 1802 are attribute values.
[0082]
The improvement point (a storage level pool identifier) 1801 is an identifier
of a storage level pool that is a target that is improved. The maximum
extensible capacity 1802 is a maximum capacity that can be extended for a
storage level pool.
[0083]
Fig. 8A is a view showing an example of a configuration of an inter-storage
level pool volume adjustment table 2000.
[0084]
The inter-storage level pool volume adjustment table 2000 includes the
information of a volume that can be adjusted between storage level pools and
the information of the capacity thereof. The inter-storage level pool volume
adjustment table 2000 is provided with a record in which an improvement
point (a storage level pool identifier) 2001, a migration source server level
pool identifier 2002, a target volume 2003, and a target volume capacity 2004
are attribute values.
[0085]
The improvement point (a server level pool identifier) 2001 is an identifier of
a storage level pool that is a target that is improved. The migration source
server level pool identifier 2002 is an identifier of a server level pool of a
26
migration source for migrating a volume. The target volume 2003 is an
identifier of a volume that is to be migrated. The target volume capacity
2004 is a capacity of a volume that is to be migrated.
[0086]
Fig. 8B is a view showing an example of a configuration of a virtual server
risk degree table 2100.
[0087]
The virtual server risk degree table 2100 is provided with a record in which a
virtual server identifier 2101, a cause region 2102, and a risk degree 2103,
are attribute values.
[0088]
The virtual server identifier 2101 is an identifier of a virtual server. The
cause region 2102 is an identifier of a region that is a cause (a storage level
pool identifier or a server level pool identifier). The risk degree 2103 is a
risk degree for a cause region.
[0089]
Fig. 9 is a view showing an example of a configuration of a virtual server
information table 2200.
[0090]
The virtual server information table 2200 is provided with a record in which
a virtual server identifier 2201, a last use data and time 2202, and a risk
degree 2203, are attribute values.
[0091]
The virtual server information table 2200 is an identifier of a virtual server.
The last use data and time 2202 is a last use data and time when a virtual
server is used. The risk degree 2203 is a risk degree (a third risk degree) for
a virtual server.
[0092]
An operation of a computer system according to the present embodiment will
be described in the next place.
[0093]
27
The information collection processing part 1210 of the management server
100 executes the information collection processing at an interval of a
predetermined time for instance. The predetermined time can be a time
that is specified by a user or can be a time that is decided by the
management server 100 as it chooses.
[0094]
The information collection processing part 1210 collects the information that
is associated with a storage level pool and the information that is associated
with a storage level virtual volume from the storage system 300, and collects
the information that is associated with a server level pool and the
information that is associated with a server level virtual volume from the
physical server 200. In the next place, the information collection processing
part 1210 stores the information that has been collected into the volume
information table 1000, the storage level pool information table 1100, the
storage level virtual volume information table 1200, the server level pool
information table 1300, and the server level virtual volume information table
1400. By this information collection processing, it is possible to collect a
wide variety of attribute values that are required for the volume information
table 1000, the storage level pool information table 1100, the storage level
virtual volume information table 1200, the server level pool information
table 1300, and the server level virtual volume information table 1400. In
the present embodiment, the information collection processing part 1210
stores a history of the information that is associated with a capacity of a
server level pool and a capacity of a storage level pool (for instance, a history
of a used capacity) into the storage part 130.
[0095]
Fig. 10 is a flowchart of a risk degree calculation processing of an HLP.
[0096]
A risk degree calculation processing of an HLP is executed by the risk degree
calculation part 1220 after the information collection processing is executed.
[0097]
(Step S11) The risk degree calculation part 1220 refers to the server level
28
pool information table 1300 and identifies (an identifier of) all server level
pools that exist in the computer system.
[0098]
(Step S12) The risk degree calculation part 1220 selects (an identifier of) a
certain server level pool that is a processing target from a server level pool
group that has been identified.
[0099]
(Step S13) The risk degree calculation part 1220 executes a discrepancy
degree calculation processing that is shown in Fig. 11 to a server level pool of
a processing target. According to a discrepancy degree calculation
processing of an HLP, a discrepancy degree of an HLP is calculated. Here, a
discrepancy degree of an HLP indicates a degree of a discrepancy for a size of
a physical free capacity of an HLP and a size of a free capacity that has been
allocated virtually. The details will be described in a discrepancy degree
calculation processing of an HLP.
[0100]
(Step S14) The risk degree calculation part 1220 executes a grace time
calculation processing for calculating a grace time of an HLP to a server level
pool of a processing target. Here, a grace time is a time that is estimated as
a time until a physical free capacity of an HLP becomes 0 (a second grace
time). As a method for calculating a grace time for instance, a history of a
past use capacity of a server level pool is stored, an increased amount of a
use capacity in a unit time of a server level pool is calculated from the history,
and a time until a free capacity becomes 0 (a grace time: a second grace time)
is calculated based on an increased amount of a use capacity in a unit time
that has been calculated and a free capacity 1305 of the server level pool
information table 1300. A method for calculating a grace time is not
restricted to this method, and can be any method as long as a time until a
free capacity becomes 0 can be predicted. Moreover, a time until a physical
free capacity of a storage level pool becomes 0 (a first grace time) can also be
calculated by a processing similar to the above processing.
[0101]
29
(Steps S15 to S19) The risk degree calculation part 1220 executes a
processing for determining a risk degree of a depletion of the server level
pool.
[0102]
A concept of a processing for determining a risk degree will be described in
the following.
[0103]
Fig. 12 is a view for illustrating a risk degree determination processing.
[0104]
In the present embodiment, a risk degree of a depletion of a free capacity of
the server level pool is determined by using a grace time and a discrepancy
degree. Moreover, a risk degree can also be determined by using any one of
a grace time and a discrepancy degree.
[0105]
In the present embodiment, a threshold value X (a second threshold value)
that is a standard of a grace time for determining that a risk degree of a
depletion of a free capacity of the server level pool is high and a threshold
value Y (a first threshold value) that is a standard of a discrepancy degree
for determining that a risk degree of a depletion of a free capacity of the
server level pool is high are prepared. Here, the threshold value X and the
threshold value Y can also be configured uniquely in advance by the
computer system, or can also be configured by a manager as one chooses.
[0106]
In the present embodiment, (1) a risk degree is determined as “Danger” in
the case where a grace time to the server level pool is smaller than the
threshold value X (a grace time is short) and a discrepancy degree is larger
than the threshold value Y, (2) a risk degree is determined as “Caution” in
the case where a grace time to the server level pool is smaller than the
threshold value X and a discrepancy degree is equal to or less than the
threshold value Y or in the case where a grace time to the server level pool is
equal to or larger than the threshold value X (a grace time is long) and a
discrepancy degree is larger than the threshold value Y, and (3) a risk degree
30
is determined as “Safe” in the case where a grace time to the server level pool
is equal to or larger than the threshold value X (a grace time is long) and a
discrepancy degree is less than the threshold value Y. According to this
processing, a risk degree of a depletion of a free capacity of the server level
pool can be determined in an appropriate manner based on the different
standards of a discrepancy degree and a grace time.
[0107]
The description is returned to that of Fig. 11 and the step S15 and
subsequent steps will be described in detail.
(Step S15) The risk degree calculation part 1220 determines whether or not a
discrepancy degree that has been calculated is larger than the threshold
value X and a grace time that has been calculated is smaller than the
threshold value Y. As a result, in the case where a discrepancy degree is
larger than the threshold value X and a grace time is smaller than the
threshold value Y (step S15: YES), the risk degree calculation part 1220 goes
ahead with the processing to the step S16. On the other hand, otherwise,
that is, in the case where a discrepancy degree is equal to or less than the
threshold value X and a grace time is equal to or larger than the threshold
value Y (step S15: NO), the risk degree calculation part 1220 goes ahead
with the processing to the step S17.
[0108]
(Step S16) The risk degree calculation part 1220 sets “Danger” to a risk
degree 1310 of a record that is corresponded to the server level pool of a
target of the server level pool information table 1300.
[0109]
(Step S17) The risk degree calculation part 1220 determines whether or not a
discrepancy degree that has been calculated is equal to or less than the
threshold value X and a grace time that has been calculated is equal to or
larger than the threshold value Y. As a result, in the case where a
discrepancy degree that has been calculated is equal to or less than the
threshold value X and a grace time that has been calculated is equal to or
larger than the threshold value Y (step S157: YES), the risk degree
31
calculation part 1220 goes ahead with the processing to the step S18. On
the other hand, otherwise, that is, in the case where a discrepancy degree is
equal to or less than the threshold value X and a grace time is larger than
the threshold value Y or a discrepancy degree is larger than the threshold
value X and a grace time is equal to or less than the threshold value Y (step
S17: NO), the risk degree calculation part 1220 goes ahead with the
processing to the step S19.
[0110]
(Step S18) The risk degree calculation part 1220 sets “Safe” to a risk degree
1310 of a record that is corresponded to the server level pool of a target of the
server level pool information table 1300.
[0111]
(Step S19) The risk degree calculation part 1220 sets “Caution” to a risk
degree 1310 of a record that is corresponded to the server level pool of a
target of the server level pool information table 1300.
[0112]
(Step S20) The risk degree calculation part 1220 determines whether or not a
processing for all the server level pools that have been identified in the step
S11 has been completed. As a result, in the case where a processing has not
been completed (step S20: NO), the risk degree calculation part 1220 goes
ahead with the processing to the step S12 and executes a processing in which
a server level pool that has not been processed is a target. On the other
hand, in the case where a processing for all the server level pools has been
completed (step S20: YES), the risk degree calculation processing is
terminated.
[0113]
According to the risk degree calculation processing of the HLP, a risk degree
that is associated with a depletion of a free capacity for the server level pool
can be determined in an appropriate manner.
[0114]
Fig. 11 is a flowchart of a discrepancy degree calculation processing of an
HLP.
32
[0115]
A discrepancy degree calculation processing of an HLP is a processing that is
corresponded to the step S13 of the risk degree calculation processing of an
HLP of Fig. 10.
[0116]
(Step S21) The risk degree calculation part 1220 refers to a free capacity
1305 of the server level pool information table 1300 and obtains a physical
free capacity of a server level pool of a processing target.
[0117]
(Step S22) The risk degree calculation part 1220 searches the server level
virtual volume information table 1400 and identifies a server level virtual
volume that is corresponded to all records in which a value of a server level
pool identifier 1405 matches up with an identifier of a server level pool of a
processing target, that is, a server level virtual volume on a server level pool
of a processing target.
[0118]
(Step S23) The risk degree calculation part 1220 selects one of the server
level virtual volumes that have been identified as a server level virtual
volume of a processing target.
[0119]
(Step S24) The risk degree calculation part 1220 searches the virtual server
level file system information table 1500 and identifies a virtual server level
file system that is corresponded to all records in which a value of a server
level virtual volume identifier 1505 matches up with an identifier of a server
level virtual volume of a processing target.
[0120]
(Step S25) The risk degree calculation part 1220 selects one of the virtual
server level file systems that have been identified as a virtual server level
file system of a processing target.
[0121]
(Step S26) The risk degree calculation part 1220 adds a value of a free
capacity 1504 of a record that is corresponded to the virtual server level file
33
system that has been selected for the virtual server level file system
information table 1500 to the total sum value of a virtual free capacity that is
a variable. The total sum value of a virtual free capacity is initialized to 0
when the discrepancy degree calculation processing of an HLP is started.
[0122]
(Step S27) The risk degree calculation part 1220 determines whether or not a
processing for all the virtual server level file systems that have been
identified in the step S24 has been completed. As a result, in the case
where a processing for all the virtual server level file systems that have been
identified has not been completed (step S27: NO), the risk degree calculation
part 1220 goes ahead with the processing to the step S25. On the other
hand, in the case where a processing for all the virtual server level file
systems that have been identified has been completed (step S27: YES), the
risk degree calculation part 1220 goes ahead with the processing to the step
S28.
[0123]
(Step S28) The risk degree calculation part 1220 determines whether or not a
processing for all the virtual server level virtual volumes that have been
identified in the step S22 has been completed. As a result, in the case
where a processing for all the virtual server level virtual volumes that have
been identified has not been completed (step S28: NO), the risk degree
calculation part 1220 goes ahead with the processing to the step S23. On
the other hand, in the case where a processing for all the virtual server level
virtual volumes that have been identified has been completed (step S28:
YES), the risk degree calculation part 1220 goes ahead with the processing to
the step S29.
[0124]
(Step S29) The risk degree calculation part 1220 calculates a discrepancy
degree that is associated with a physical free capacity and a virtual free
capacity for a server level pool based on the total sum value of a free capacity
and a virtual free capacity that have been obtained in the step S21. In the
present embodiment, the risk degree calculation part 1220 calculates a
34
discrepancy degree by using the following expression 1. The discrepancy
degree indicates that a virtual free capacity is larger as compared with a
physical free capacity as a value is larger. The discrepancy degree is an
index that can indicate that a risk degree of a depletion of a free capacity of
the server level pool is high in an appropriate manner.
(Expression 1) Discrepancy degree = (total sum value of virtual free capacity
- physical free capacity) / physical free capacity
[0125]
A discrepancy degree (a first discrepancy degree) that is associated with a
physical free capacity and a virtual free capacity for a storage level pool can
be calculated by a processing similar to the above processing.
[0126]
The risk degree calculation processing for the HLP1 and the HLP2 in the
case where the computer system is in the status that is shown in Fig. 28 will
be described in detail.
[0127]
Since a physical free capacity is 10 GB and a virtual free capacity is 90 GB
(30 GB on VFS1, 30 GB onVFS2, and 30 GB on VFS3) for the HLP1, a
discrepancy degree is (90-10) / 10 = 8.
[0128]
A trend of a past capacity of the HLP1 is that a use capacity of 3 days ago is
84 GB, a use capacity of 2 days ago is 86 GB, and a use capacity of 1 day ago
is 88 GB for instance, an increased amount of a use capacity in a unit time
(for instance, 1 day) is 2 GB. A grace time until a depletion of a free
capacity of the HLP1 is 10 / 2 = 5 (days).
[0129]
In the case where the threshold value X that is associated with a grace time
that is used for determining a risk degree is assumed to be 10 and the
threshold value Y that is associated with a discrepancy degree is assumed to
be 3, since a discrepancy degree is 8 and is larger than the threshold value Y
and a grace time is 5 and is shorter than the threshold value X for the HLP1,
a risk degree is determined as “Danger”.
35
[0130]
Since a physical free capacity is 90 GB and a virtual free capacity is 40 GB
(40 GB on VFS4) for the HLP2, a discrepancy degree is (40-90) / 90 = -0.55.
[0131]
A trend of a past capacity of the HLP2 is that a use capacity of 3 days ago is 7
GB, a use capacity of 2 days ago is 8 GB, and a use capacity of 1 day ago is 9
GB for instance, an increased amount of a use capacity in a unit time (for
instance, 1 day) is 21 GB. A grace time until a depletion of a free capacity of
the HLP2 is 90 / 1 = 90 (days).
[0132]
In this case, since a discrepancy degree is -0.55 and is equal to or less than
the threshold value Y and a grace time is 90 and is equal to or larger than
the threshold value X for the HLP2, a risk degree is determined as “Safe”.
[0133]
Fig. 13 is a flowchart of an influence degree calculation processing of an HLP.
[0134]
An influence degree calculation processing of an HLP is a processing for
calculating an influence degree in the case where a free capacity of the server
level pool is depleted, and is executed for each server level pool as a target at
any point of time (for instance, immediately after the risk degree calculation
processing of an HLP).
[0135]
(Step S41) The risk degree calculation part 1220 refers to the server level
virtual volume information table 1400 and identifies a server level virtual
volume that is corresponded to all records in which a value of a server level
pool identifier 1405 matches up with an identifier of a server level pool of a
processing target, that is, a server level virtual volume on a server level pool
of a processing target.
[0136]
(Step S42) The risk degree calculation part 1220 selects one of the server
level virtual volumes that have been identified as a server level virtual
volume of a processing target.
36
[0137]
(Step S43) The risk degree calculation part 1220 determines whether or not a
virtual hard disk type 1407 for a record that is corresponded to the selected
server level virtual volume of the server level virtual volume information
table 1400 is a variable type (”Dynamic”). As a result, in the case where the
virtual hard disk type 1407 is a variable type (step S43: YES), since there is a
possibility that a capacity cannot be allocated to the server level virtual
volume if a free capacity of the server level pool is depleted, the risk degree
calculation part 1220 goes ahead with the processing to the step S44. On
the other hand, in the case where the virtual hard disk type 1407 is not a
variable type (step S43: NO), since a capacity of the server level virtual
volume has already been ensured and there is no influence of a depletion of a
free capacity of the server level pool, the risk degree calculation part 1220
goes ahead with the processing to the step S45.
[0138]
(Step S44) The risk degree calculation part 1220 identifies a virtual server
that belongs to the server level virtual volume that has been selected by
referring to a corresponded virtual server identifier 1506 of the virtual server
level file system information table 1500, and stores the virtual server
identifier as an identifier of a virtual server that may be stopped in the case
where a free capacity of the server level pool is depleted.
[0139]
(Step S45) The risk degree calculation part 1220 determines whether or not a
processing for all the virtual server level virtual volumes that have been
identified in the step S41 has been completed. As a result, in the case
where a processing for all the virtual server level virtual volumes that have
been identified has not been completed (step S45: NO), the risk degree
calculation part 1220 goes ahead with the processing to the step S42. On
the other hand, in the case where a processing for all the virtual server level
virtual volumes that have been identified has been completed (step S45:
YES), the risk degree calculation part 1220 goes ahead with the processing to
the step S46.
37
[0140]
(Step S46) The risk degree calculation part 1220 stores the number of the
identifiers of the virtual server that has been stored as one that may be
stopped in the case where a free capacity of the server level pool is depleted
into an influence degree 1311 of a record that is corresponded to the server
level pool of a processing target of the server level pool information table
1300, and terminates the processing. An influence degree is not restricted
to the number of the virtual servers that may be stopped, and a parameter
such as a degree of importance can also be corresponded to each virtual
server and an influence degree can be calculated in consideration of
weighting by this parameter for instance.
[0141]
The risk degree calculation processing for a server level pool and so on have
been described with reference to Fig. 10 to Fig. 13. Moreover, the risk
degree calculation part 1220 executes the risk degree calculation processing
and so on similar to the above processing for a storage level pool. For the
risk degree calculation processing for the storage level pool, a server level
pool and a corresponded table and so on are substituted for a storage level
pool and a corresponded table and so on in Fig. 10 to Fig. 13 in the
elementary sense.
[0142]
The risk degree calculation processing for the LLP in the case where the
computer system is in the status that is shown in Fig. 28 will be described in
detail.
[0143]
Since a physical free capacity is 200 GB and a virtual free capacity is 130 GB
(30 GB on VFS1, 30 GB onVFS2, 30 GB on VFS3, and 40 GB on VFS4) for
the LLP, a discrepancy degree (a first discrepancy degree) is (130-200) / 200 =
-0.35.
[0144]
A trend of a past capacity of the LLP is that a use capacity of 3 days ago is 94
GB, a use capacity of 2 days ago is 97 GB, and a use capacity of 1 day ago is
38
100 GB for instance, an increased amount of a use capacity in a unit time (for
instance, 1 day) is 3 GB. A grace time until a depletion of a free capacity of
the LLP (a first grace time) is 200 / 3 ≒ 66 (days).
[0145]
In the case where the threshold value X that is associated with a grace time
that is used for determining a risk degree is assumed to be 10 and the
threshold value Y that is associated with a discrepancy degree is assumed to
be 3, since a discrepancy degree is -0.35 and is equal to or less than the
threshold value Y and a grace time is 66 and is equal to or larger than the
threshold value X for the LLP, a risk degree is determined as “Safe”.
[0146]
Fig. 14 is a flowchart of a risk degree calculation processing of a VM.
[0147]
The risk degree calculation processing of a VM is executed after a risk degree
calculation processing is completed to a server level pool and a storage level
pool. A risk degree of a virtual server is an index for indicating a height of
possibility that a virtual server is stopped by a depletion of a free capacity for
a server level pool or a storage level pool.
[0148]
(Step S51) The risk degree calculation part 1220 refers to the virtual server
information table 2200 and identifies all virtual servers that exist in the
computer system.
[0149]
(Step S52) The risk degree calculation part 1220 selects one of the virtual
servers that have been identified as a virtual server of a processing target.
[0150]
(Step S53) The risk degree calculation part 1220 identifies an identifier of all
server level pools that are associated with the virtual server that has been
selected. More specifically, the risk degree calculation part 1220 refers to
the server level virtual volume information table 1400 and the virtual server
level file system information table 1500, and identifies an identifier of a
server level pool that is corresponded to a virtual server identifier of a virtual
39
server of a processing target.
[0151]
(Step S54) The risk degree calculation part 1220 selects one of the identifiers
of the server level pools that have been identified as a identifier of a server
level pool of a processing target.
[0152]
(Step S55) The risk degree calculation part 1220 identifies a record that is
corresponded to an identifier of a server level pool of a processing target of
the server level pool information table 1300, and determines whether or not
a risk degree 1310 of the record is “Danger” or “Caution”. As a result, in the
case where a risk degree 1310 of the record is “Danger” or “Caution” (step
S55: YES), the risk degree calculation part 1220 goes ahead with the
processing to the step S56. On the other hand, in the case where a risk
degree 1310 of the record is not “Danger” or “Caution” (step S55: NO), the
risk degree calculation part 1220 goes ahead with the processing to the step
S57.
[0153]
(Step S56) The risk degree calculation part 1220 adds a record that is
corresponded to a server level pool of a processing target to the virtual server
risk degree table 2100. More specifically, the risk degree calculation part
1220 configures an identifier of a virtual server that is a processing target in
the step S52 to the virtual server identifier 2101, configures an identifier of
the server level pool that has been selected in the step S54 to the cause
region 2102, and adds a record in which a value of the risk degree 1310 that
has been determined in the step S55 has been configured to the risk degree
2103 to the virtual server risk degree table 2100.
[0154]
(Step S57) The risk degree calculation part 1220 identifies an identifier of all
storage level pools that belong to the server level pool that has been selected.
More specifically, the risk degree calculation part 1220 refers to the storage
level virtual volume information table 1200 and the server level pool
information table 1300, and identifies an identifier of a storage level pool
40
that is corresponded to an identifier of a server level pool of a processing
target.
[0155]
(Step S58) The risk degree calculation part 1220 selects one of the identifiers
of the storage level pools that have been identified as a identifier of a storage
level pool of a processing target.
[0156]
(Step S59) The risk degree calculation part 1220 identifies a record that is
corresponded to an identifier of a storage level pool of a processing target of
the storage level pool information table 1100, and determines whether or not
a risk degree 1109 of the record is “Danger” or “Caution”. As a result, in the
case where a risk degree 1109 of the record is “Danger” or “Caution” (step
S59: YES), the risk degree calculation part 1220 goes ahead with the
processing to the step S60. On the other hand, in the case where a risk
degree 1109 of the record is not “Danger” or “Caution” (step S59: NO), the
risk degree calculation part 1220 goes ahead with the processing to the step
S61.
[0157]
(Step S60) The risk degree calculation part 1220 adds a record that is
corresponded to a storage level pool of a processing target to the virtual
server risk degree table 2100. More specifically, the risk degree calculation
part 1220 configures an identifier of a virtual server that is a processing
target in the step S52 to the virtual server identifier 2101, configures an
identifier of the storage level pool that has been selected in the step S58 to
the cause region 2102, and adds a record in which a value of the risk degree
1109 that has been determined in the step S59 has been configured to the
risk degree 2103 to the virtual server risk degree table 2100.
[0158]
(Step S61) The risk degree calculation part 1220 determines whether or not a
processing for all the storage level pools that have been identified in the step
S57 has been completed. As a result, in the case where a processing for all
the storage level pools that have been identified has not been completed (step
41
S61: NO), the risk degree calculation part 1220 goes ahead with the
processing to the step S58. On the other hand, in the case where a
processing for all the storage level pools that have been identified has been
completed (step S61: YES), the risk degree calculation part 1220 goes ahead
with the processing to the step S62.
[0159]
(Step S62) The risk degree calculation part 1220 determines whether or not a
processing for all the server level pools that have been identified in the step
S57 has been completed. As a result, in the case where a processing for all
the server level pools that have been identified has not been completed (step
S62: NO), the risk degree calculation part 1220 goes ahead with the
processing to the step S54. On the other hand, in the case where a
processing for all the server level pools that have been identified has been
completed (step S62: YES), the risk degree calculation part 1220 goes ahead
with the processing to the step S63.
[0160]
(Step S63) The risk degree calculation part 1220 decides a risk degree of the
virtual server based on a record that is corresponded to the virtual server
that has been selected in the step S52. More specifically, in the case where
there are one or more records that are corresponded to the virtual server that
has been selected in the virtual server risk degree table 2100, the risk degree
calculation part 1220 decides a high risk degree in the risk degree 2103 of
the record as a risk degree to the virtual server. For instance, in the case
where there is “Danger” or “Caution” as the risk degree 2103 that is
corresponded to a certain virtual server, the risk degree calculation part
1220 decides “Danger”. On the other hand, in the case where there is no
record that is corresponded to the virtual server that has been selected in the
virtual server risk degree table 2100, the risk degree calculation part 1220
decides a risk degree to the virtual server as “Safe”. In the next place, the
risk degree calculation part 1220 configures a priority that has been decided
to a risk degree 2203 of a record of the virtual server of the virtual server
information table 2200.
42
[0161]
(Step S64) The risk degree calculation part 1220 determines whether or not a
processing for all the virtual servers that have been identified in the step S51
has been completed. As a result, in the case where a processing for all the
virtual servers that have been identified has not been completed (step S64:
NO), the risk degree calculation part 1220 goes ahead with the processing to
the step S52. On the other hand, in the case where a processing for all the
virtual servers that have been identified has been completed (step S64: YES),
the risk degree calculation part 1220 terminates the processing.
[0162]
According to this processing, a risk degree for each virtual server can be
determined in an appropriate manner.
[0163]
The risk degree calculation processing for the VM1, the VM2, and the VM3
in the case where the computer system is in the status that is shown in Fig.
28 will be described in detail.
[0164]
Since the VM1 belongs to the HLP1 and the LLP, the HLP1 is “Danger”, and
the LLP is “Safe”, a risk degree of the VM1 is determined as “Danger”.
Since the VM2 belongs to the HLP1 and the LLP, the HLP1 is “Danger”, and
the LLP is “Safe”, a risk degree of the VM2 is determined as “Danger”.
Since the VM3 belongs to the HLP2 and the LLP, the HLP2 is “Safe”, and the
LLP is “Safe”, a risk degree of the VM3 is determined as “Safe”.
[0165]
In the next place, a display processing for displaying a risk degree of the
storage level pool and the server level pool will be described.
[0166]
The display processing is executed by the risk degree calculation part 1220
based on an instruction of a manager to the input/output device 160 for the
management server 100 for instance.
[0167]
The risk degree calculation part 1220 refers to the server level pool
43
information table 1300, identifies all records in which a risk degree 1310 is
“Caution” or “Danger”, acquires the server level pool identifier 1301, the risk
degree 1310, and the influence degree 1311 of the record, refers to the
storage level pool information table 1100, identifies all records in which a
risk degree 1109 is “Caution” or “Danger”, acquires the server level pool
identifier 1101, the risk degree 1109, and the influence degree 1110 of the
record, and displays a display screen that is shown in Fig. 15 or the like
based on the information that has been acquired.
[0168]
Fig. 15 is a view showing an example of a display screen for displaying a risk
degree of a storage level pool and a server level pool.
[0169]
In this display screen, an identifier, a risk degree, and an influence degree
for a server level pool are displayed, and an identifier, a risk degree, and an
influence degree for a storage level pool are displayed. By this display
screen, a manager can comprehend a server level pool and a storage level
pool that is provided with a high risk degree in an appropriate manner.
Moreover, a manager can comprehend a degree of an influence caused by a
depletion of a free capacity of the server level pool or a storage level pool in
an appropriate manner.
[0170]
In the next place, for a virtual server in which a risk degree is determined as
high (for instance, “Danger”), the following describes an improvement point
selection processing for identifying a region that is a cause in which the
virtual server is determined as “Danger” (an improvement point) and a
coping execution availability determination processing for determining a
coping measure that is executable for an improvement point that has been
identified.
[0171]
An improvement point selection processing will be described. The
improvement point selection processing is executed by the
cause/improvement point selection part 1230.
44
[0172]
The cause/improvement point selection part 1230 refers to the virtual server
information table 2200 and identifies a virtual server identifier in which a
risk degree 2203 is “Danger” or “Caution”. In the next place, the
cause/improvement point selection part 1230 refers to the virtual server risk
degree table 2100, acquires all records that are corresponded to an identifier
of the virtual server that has been identified, and configures a cause region
2102 of the records as an improvement point.
[0173]
In the next place, a coping execution availability determination processing
will be described.
[0174]
Fig. 16 is a flowchart of a coping execution availability determination
processing.
[0175]
The coping execution availability determination processing is executed by
the coping execution availability determination part 1240 after the
improvement point selection processing is executed for instance.
[0176]
(Step S71) The coping execution availability determination part 1240
acquires an identifier of all server level pools that have been configured as an
improvement point for the improvement point selection processing.
[0177]
(Step S72) The coping execution availability determination part 1240 selects
one of the identifiers of the server level pools that have been acquired as a
identifier of a server level pool of a processing target.
[0178]
(Step S73) The coping execution availability determination part 1240
executes a coping execution availability determination processing of an HLP
that is shown in Fig. 17 for a server level pool of a processing target. By the
coping execution availability determination processing of an HLP, a coping
measure that is executable to a server level pool of a processing target is
45
detected.
[0179]
(Step S74) The coping execution availability determination part 1240
determines whether or not a processing for all the server level pools that
have been acquired in the step S71 has been completed. As a result, in the
case where a processing for all the server level pools that have been
identified has not been completed (step S74: NO), the coping execution
availability determination part 1240 goes ahead with the processing to the
step S72. On the other hand, in the case where a processing for all the
server level pools that have been identified has been completed (step S74:
YES), the coping execution availability determination part 1240 goes ahead
with the processing to the step S75.
[0180]
(Step S75) The coping execution availability determination part 1240
acquires an identifier of all storage level pools that have been configured as
an improvement point for the improvement point selection processing.
[0181]
(Step S76) The coping execution availability determination part 1240 selects
one of the identifiers of the storage level pools that have been acquired as a
identifier of a storage level pool of a processing target.
[0182]
(Step S77) The coping execution availability determination part 1240
executes a coping execution availability determination processing of an LLP
that is shown in Fig. 18 for a storage level pool of a processing target. By
the coping execution availability determination processing of an LLP, a
coping measure that is executable to a storage level pool of a processing
target is detected.
[0183]
(Step S78) The coping execution availability determination part 1240
determines whether or not a processing for all the storage level pools that
have been acquired in the step S75 has been completed. As a result, in the
case where a processing for all the storage level pools that have been
46
identified has not been completed (step S78: NO), the coping execution
availability determination part 1240 goes ahead with the processing to the
step S76. On the other hand, in the case where a processing for all the
storage level pools that have been identified has been completed (step S78:
YES), the coping execution availability determination part 1240 terminates
the processing.
[0184]
Fig. 17 is a flowchart of a coping execution availability determination
processing of an HLP.
[0185]
A coping execution availability determination processing of an HLP is a
processing that is corresponded to the step S73 of the coping execution
availability determination processing of an HLP of Fig. 16. A coping
measure to a server level pool is not restricted to the coping measure that is
described in the following, and can be a coping measure in which a risk
degree for a server level pool can be reduced.
[0186]
(Step S81) The coping execution availability determination part 1240
executes a capacity reduction availability determination processing of a
server level virtual volume that is shown in Fig. 19 for a server level pool of a
processing target. By the capacity reduction availability determination
processing of a server level virtual volume, whether or not a capacity
reduction of a server level virtual volume can be executed as a coping
measure is determined.
[0187]
(Step S82) The coping execution availability determination part 1240
executes a migration availability determination processing between server
level pools of a server level virtual volume that is shown in Fig. 22 for a
server level pool of a processing target. By the migration availability
determination processing between server level pools of a server level virtual
volume, whether or not a migration between server level pools of a server
level virtual volume can be executed as a coping measure is determined.
47
[0188]
(Step S83) The coping execution availability determination part 1240
executes a deletion availability determination processing of an unnecessary
virtual server that is shown in Fig. 21 for a server level pool of a processing
target. By the deletion availability determination processing of an
unnecessary virtual server, whether or not a deletion of an unnecessary
virtual server can be executed as a coping measure is determined.
[0189]
(Step S84) The coping execution availability determination part 1240
executes an extension availability determination processing of a server level
pool that is shown in Fig. 20 for a server level pool of a processing target.
By the extension availability determination processing of a server level pool,
whether or not an extension of a server level pool can be executed as a coping
measure is determined.
[0190]
According to the coping execution availability determination processing of an
HLP, a coping measure that is executable to a server level pool of a
processing target is detected.
[0191]
Fig. 18 is a flowchart of a coping execution availability determination
processing of an LLP.
[0192]
A coping execution availability determination processing of an LLP is a
processing that is corresponded to the step S77 of the coping execution
availability determination processing of Fig. 16. A coping measure to a
storage level pool is not restricted to the coping measure that is described in
the following, and can be a coping measure in which a risk degree for a
storage level pool can be reduced.
[0193]
(Step S91) The coping execution availability determination part 1240
executes a capacity reduction availability determination processing of a
server level virtual volume that is shown in Fig. 23 for a storage level pool of
48
a processing target. By the capacity reduction availability determination
processing of a server level virtual volume, whether or not a capacity
reduction of a server level virtual volume can be executed as a coping
measure is determined.
[0194]
(Step S92) The coping execution availability determination part 1240
executes a volume adjustment availability determination processing between
storage level pools that is shown in Fig. 25 for a storage level pool of a
processing target. By the volume adjustment availability determination
processing between storage level pools, whether or not an adjustment of a
volume between storage level pools can be executed as a coping measure is
determined.
[0195]
(Step S93) The coping execution availability determination part 1240
executes an extension availability determination processing of a storage
level pool that is shown in Fig. 24 for a storage level pool of a processing
target. By the extension availability determination processing of a storage
level pool, whether or not an extension of a storage level pool can be executed
as a coping measure is determined.
[0196]
Fig. 19 is a flowchart of an HL-VVOL capacity reduction availability
determination processing for an HLP. An HL-VVOL capacity reduction
availability determination processing for an HLP is a processing that is
corresponded to the step S81 of the coping execution availability
determination processing of a server level pool of Fig. 17.
[0197]
(Step S101) The coping execution availability determination part 1240
identifies an identifier of all storage level virtual volumes that belong to the
server level pool of a processing target. More specifically, the coping
execution availability determination part 1240 refers to the server level
virtual volume information table 1400, and identifies a server level virtual
volume identifier 1401 of all records in which the server level pool identifier
49
1405 is the server level pool identifier of a processing target.
[0198]
(Step S102) The coping execution availability determination part 1240
selects one of the server level virtual volume identifiers that have been
acquired as a server level virtual volume of a processing target.
[0199]
(Step S103) The coping execution availability determination part 1240
determines whether or not there is a reducible capacity in the server level
virtual volume that has been selected. More specifically, the coping
execution availability determination part 1240 determines whether or not a
capacity exists in a reducible capacity 1406 of the server level virtual volume
information table 1400. As a result, in the case where a reducible capacity
exists (step S103: YES), the coping execution availability determination part
1240 goes ahead with the processing to the step S104. On the other hand,
in the case where a reducible capacity does not exist (step S103: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S107.
[0200]
(Step S104) The coping execution availability determination part 1240 refers
to the history and determines whether or not a capacity reduction of the
server level virtual volume is effective. Here, in the case where a temporary
file is created in large quantity in a batch processing for a virtual server that
executes a nighttime batch processing and the files are deleted after the
batch processing for instance, since a size of the server level virtual volume is
increased every when the batch processing is executed, it is determined that
a capacity reduction of the server level virtual volume is not effective.
[0201]
(Step S105) The coping execution availability determination part 1240
determines whether or not a capacity reduction of the server level virtual
volume is effective based on the determination of the step S104. As a result,
in the case where a capacity reduction of the server level virtual volume is
effective (step S105: YES), the coping execution availability determination
50
part 1240 goes ahead with the processing to the step S106. On the other
hand, in the case where a capacity reduction of the server level virtual
volume is not effective (step S105: NO), the coping execution availability
determination part 1240 goes ahead with the processing to the step S107.
[0202]
(Step S106) The coping execution availability determination part 1240 stores
an identifier of a server level virtual volume of a processing target as an
identifier of a server level virtual volume in which a capacity can be reduced
into the memory 110.
[0203]
(Step S107) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
server level virtual volumes that have been acquired in the step S101. As a
result, in the case where the processing has not been completed for all the
server level virtual volumes that have been identified (step S107: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S102. On the other hand, in the case where the
processing has been completed for all the server level virtual volumes that
have been identified (step S107: YES), the coping execution availability
determination part 1240 terminates the processing.
[0204]
According to the HL-VVOL capacity reduction availability determination
processing for an HLP, a server level virtual volume in which a capacity can
be reduced can be detected in an appropriate manner.
[0205]
The HL-VVOL capacity reduction availability determination processing for
an HLP in the case where the computer system is in the status that is shown
in Fig. 28 will be described in detail.
[0206]
Since a file size of the HL-VVOL1 (VHD1) is 70 GB and a capacity that is
used for the VM1 on the HL-VVOL1 is 40 GB, it is thought that a useless
capacity of 30 GB can be reduced by a capacity reduction of the HL-VVOL1.
51
On the other hand, since a file size of the HL-VVOL2 (VHD2) is 20 GB and a
capacity that is used for the VM2 on the HL-VVOL2 is 20 GB, it is thought
that a capacity reduction of the HL-VVOL2 is not effective. Consequently,
according to the HL-VVOL capacity reduction availability determination
processing for an HLP, it is determined that a capacity reduction of 30 GB is
possible for the HL-VVOL1 by a capacity reduction processing.
[0207]
Fig. 20 is a flowchart of an extension availability determination processing of
an HLP. An extension availability determination processing of an HLP is a
processing that is corresponded to the step S84 of the coping execution
availability determination processing of a server level pool that is shown in
Fig. 17.
[0208]
(Step S111) The coping execution availability determination part 1240
determines whether or not a server level pool of a processing target is a SAN
connection. Whether or not a server level pool is a SAN connection can be
identified by referring to a connection method 1308 of a record that is
associated with a server level pool of a processing target of the server level
pool information table 1300. As a result, in the case where a server level
pool is a SAN connection (step S111: YES), the coping execution availability
determination part 1240 goes ahead with the processing to the step S112.
On the other hand, in the case where a server level pool is not a SAN
connection (step S111: NO), that is, in the case where a server level pool is an
internal HDD, since it can be determined that an extension is impossible, the
coping execution availability determination part 1240 terminates the
processing.
[0209]
(Step S112) The coping execution availability determination part 1240
determines whether or not a free capacity of a predetermined threshold
value or larger exists in a storage level pool to which a server level pool of a
processing target belongs. More specifically, the coping execution
availability determination part 1240 refers to the server level pool
52
information table 1300, the storage level virtual volume information table
1200, and the storage level pool information table 1100, identifies a storage
level pool to which a server level pool of a processing target belongs,
identifies a free capacity of the storage level pool, and determines whether or
not the free capacity of the storage level pool is equal to or larger than a
predetermined threshold value. The threshold value can be defined by a
manager, or can be defined in the system in advance. As a result, in the
case where a free capacity of a predetermined threshold value or larger
exists (step S112: YES), the coping execution availability determination part
1240 goes ahead with the processing to the step S113. On the other hand,
in the case where a free capacity of a predetermined threshold value or
larger does not exist (step S112: NO), the coping execution availability
determination part 1240 goes ahead with the processing to the step S114.
[0210]
(Step S113) The coping execution availability determination part 1240 stores
an identifier of a server level pool of a processing target as an identifier of a
server level pool that can be extended. More specifically, the coping
execution availability determination part 1240 adds a record to the server
level virtual volume extension table 1700, makes the improvement point
1701 to be an identifier of a server level pool of a processing target, and
makes an extensibility 1702 to be “extensible”.
[0211]
(Step S114) The coping execution availability determination part 1240
determines whether or not a storage level pool to which a server level pool of
a processing target belongs can be extended. The determination processing
for determining whether or not a storage level pool can be extended is
illustrated in Fig. 24. As a result, in the case where a storage level pool can
be extended (step S114: YES), the coping execution availability
determination part 1240 goes ahead with the processing to the step S115.
On the other hand, in the case where a storage level pool cannot be extended
(step S114: NO), the coping execution availability determination part 1240
terminates the processing.
53
[0212]
(Step S115) The coping execution availability determination part 1240 stores
an identifier of a server level pool of a processing target into the memory 110
as an identifier of a server level pool that can be extended with some
conditions. More specifically, the coping execution availability
determination part 1240 adds a record to the server level virtual volume
extension table 1700, makes the improvement point 1701 to be an identifier
of a server level pool of a processing target, makes an extensibility 1702 to be
“extension of LPP is necessary”, and makes the LLP identifier 1703 to be an
identifier of a storage level pool that has been determined as extensible.
[0213]
By the extension availability determination processing of a server level pool,
a server level pool that can be extended is detected.
[0214]
The extension availability determination processing of a server level pool in
the case where the computer system is in the status that is shown in Fig. 28
will be described in detail.
[0215]
Since the HLP1 is connected to the LLP by the SAN and a physical free
capacity exists in the LLP, it is determined that the HLP1 can be extended.
[0216]
Fig. 21 is a flowchart of an unnecessary VM deletion availability
determination processing. An unnecessary VM deletion availability
determination processing is a processing that is corresponded to the step S83
of the coping execution availability determination processing of a server level
pool that is shown in Fig. 17.
[0217]
(Step S121) The coping execution availability determination part 1240
identifies an identifier of all virtual servers that belong to the server level
pool of a processing target. More specifically, the coping execution
availability determination part 1240 refers to the server level virtual volume
information table 1400 and the virtual server level file system information
54
table 1500, and identifies all the virtual server identifiers that are
corresponded to the server level pool identifier of a processing target.
[0218]
(Step S122) The coping execution availability determination part 1240
selects one of the virtual server identifiers that have been identified as an
identifier of a virtual server of a processing target.
[0219]
(Step S123) The coping execution availability determination part 1240
determines whether or not an unused time of a virtual server that has been
selected exceeds a predetermined threshold value. More specifically, the
coping execution availability determination part 1240 calculates an unused
time from the last use data and time 2202 of a record that is corresponded to
an identifier of a virtual server that has been selected for the virtual server
information table 2200 and the present data and time, and compares the
unused time with the threshold value. As a result, in the case where an
unused time exceeds a predetermined threshold value (step S123: YES), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S124. On the other hand, in the case where an
unused time does not exceed a predetermined threshold value (step S123:
NO), the coping execution availability determination part 1240 goes ahead
with the processing to the step S125.
[0220]
(Step S124) The coping execution availability determination part 1240 stores
an identifier of a virtual server of a processing target into the memory 110 as
an identifier of an unnecessary virtual server. More specifically, the coping
execution availability determination part 1240 adds a record to the
unnecessary virtual server table 1600, makes the improvement point 1601 to
be an identifier of a server level pool of a processing target, makes the
unnecessary virtual server identifier 1602 to be an identifier of a virtual
server of a processing target, and makes the reducible capacity 1603 to be a
used capacity of a virtual server of a processing target.
[0221]
55
(Step S125) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
virtual servers that have been acquired in the step S121. As a result, in the
case where the processing has not been completed for all the virtual servers
that have been identified (step S125: NO), the coping execution availability
determination part 1240 goes ahead with the processing to the step S122.
On the other hand, in the case where the processing has been completed for
all the virtual servers that have been identified (step S125: YES), the coping
execution availability determination part 1240 terminates the processing.
[0222]
By the deletion availability determination processing of an unnecessary
virtual server, an unnecessary virtual server can be detected.
[0223]
Fig. 22 is a flowchart of a migration execution availability determination
processing between HLPs. A migration execution availability
determination processing between HLPs is a processing that is corresponded
to the step S82 of the coping execution availability determination processing
of a server level pool that is shown in Fig. 17.
[0224]
(Step S131) The coping execution availability determination part 1240
identifies an identifier of all other server level pools to which the server level
pool of a processing target belongs. More specifically, the coping execution
availability determination part 1240 refers to the server level pool
information table 1300, and identifies the server level pool identifier 1301 of
all records that are a physical server identifier 1309 that is equivalent to a
corresponded physical server 1309 of a record that is corresponded to the
server level pool identifier of a processing target.
[0225]
(Step S132) The coping execution availability determination part 1240
selects one of the server level pool identifier 1301 that has been identified as
an identifier of a server level pool of a processing target.
[0226]
56
(Step S133) The coping execution availability determination part 1240 refers
to the server level pool information table 1300, identifies a free capacity of a
server level pool of a processing target, and stores it into the memory 110.
[0227]
(Step S134) The coping execution availability determination part 1240 refers
to the server level virtual volume information table 1400, and acquires an
identifier of all server level virtual volumes that belong to the server level
pool of a processing target.
[0228]
(Step S135) The coping execution availability determination part 1240
selects one of the server level virtual volume that has been identified as an
identifier of a server level virtual volume of a processing target.
[0229]
(Step S136) The coping execution availability determination part 1240
subtracts a capacity of a server level virtual volume from a free capacity of a
server level pool, and determines whether or not the subtraction result is
larger than a threshold value. As a result, in the case where the
subtraction result is larger than a threshold value (step S136: YES), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S137. On the other hand, in the case where the
subtraction result is not larger than a threshold value (step S136: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S138.
[0230]
(Step S137) The coping execution availability determination part 1240 stores
an identifier of a server level pool of a processing target and an identifier of a
server level virtual volume of a processing target into the memory 110 as a
combination capable of performing a migration. More specifically, the
coping execution availability determination part 1240 adds a record to the
migration table 1900, makes the improvement point 1901 to be an identifier
of a server level pool of a processing target, makes the migration destination
server level pool identifier 1902 to be an identifier of a server level pool that
57
has been selected in the step S132, makes the target server level virtual
volume 1903 to be a server level virtual volume of a processing target, and
makes the target server level virtual volume capacity 1904 to be a capacity of
a server level virtual volume of a processing target.
[0231]
(Step S138) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
server level virtual volumes that have been acquired in the step S134. As a
result, in the case where the processing has not been completed for all the
server level virtual volumes that have been identified (step S138: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S135. On the other hand, in the case where the
processing has been completed for all the server level virtual volumes that
have been identified (step S138: YES), the coping execution availability
determination part 1240 goes ahead with the processing to the step S139.
[0232]
(Step S139) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
server level pools that have been acquired in the step S131. As a result, in
the case where the processing has not been completed for all the server level
pools that have been identified (step S139: NO), the coping execution
availability determination part 1240 goes ahead with the processing to the
step S132. On the other hand, in the case where the processing has been
completed for all the server level pools that have been identified (step S139:
YES), the coping execution availability determination part 1240 terminates
the processing.
[0233]
By the migration execution availability determination processing between
HLPs, a server level virtual volume capable of performing a migration can be
detected.
[0234]
The migration execution availability determination processing between
58
HLPs in the case where the computer system is in the status that is shown in
Fig. 28 will be described in detail.
[0235]
Another pool that is the HLP2 exists on a physical server that is equivalent
to the HLP1. For the HLP2, only 10 GB is used to the total capacity of 100
GB. Consequently, it is determined that a migration is possible for both of
the HL-VVOL1 of which a file size is 70 GB and the HL-VVOL2 of which a
file size is 20 GB.
[0236]
Fig. 23 is a flowchart of an HL-VVOL capacity reduction availability
determination processing for an LLP. An HL-VVOL capacity reduction
availability determination processing for an LLP is a processing that is
corresponded to the step S91 of the coping execution availability
determination processing of a storage level pool that is shown in Fig. 18.
[0237]
(Step S141) The coping execution availability determination part 1240
identifies an identifier of all server level virtual volumes that belong to the
storage level pool of a processing target. More specifically, the coping
execution availability determination part 1240 refers to the storage level
pool information table 1100, the storage level virtual volume information
table 1200, the server level pool information table 1300, and the server level
virtual volume information table 1400, and identifies all the server level
virtual volume identifiers that are corresponded to the storage level pool
identifier.
[0238]
(Step S142) The coping execution availability determination part 1240
selects one of the server level virtual volume identifiers that have been
acquired as an identifier of a server level virtual volume of a processing
target.
[0239]
(Step S143) The coping execution availability determination part 1240
determines whether or not there is a reducible capacity in the server level
59
virtual volume that has been selected. More specifically, the coping
execution availability determination part 1240 determines whether or not a
capacity exists in a reducible capacity 1406 of the server level virtual volume
information table 1400. As a result, in the case where a reducible capacity
exists (step S143: YES), the coping execution availability determination part
1240 goes ahead with the processing to the step S144. On the other hand,
in the case where a reducible capacity does not exist (step S143: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S147.
[0240]
(Step S144) The coping execution availability determination part 1240 refers
to the history for the server level virtual volume and determines whether or
not a capacity reduction of the server level virtual volume is effective. Here,
in the case where a temporary file is created in large quantity in a batch
processing for a virtual server that executes a nighttime batch processing
and the files are deleted after the batch processing for instance, since a size
of the server level virtual volume is increased every when the batch
processing is executed, it is determined that a capacity reduction of the
server level virtual volume is not effective.
[0241]
(Step S145) The coping execution availability determination part 1240
determines whether or not a capacity reduction of the server level virtual
volume is effective based on the determination of the step S144. As a result,
in the case where a capacity reduction of the server level virtual volume is
effective (step S145: YES), the coping execution availability determination
part 1240 goes ahead with the processing to the step S146. On the other
hand, in the case where a capacity reduction of the server level virtual
volume is not effective (step S145: NO), the coping execution availability
determination part 1240 goes ahead with the processing to the step S147.
[0242]
(Step S146) The coping execution availability determination part 1240 stores
an identifier of a server level virtual volume of a processing target as an
60
identifier of a server level virtual volume in which a capacity can be reduced
into the memory 110.
[0243]
(Step S147) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
server level virtual volumes that have been acquired in the step S141. As a
result, in the case where the processing has not been completed for all the
server level virtual volumes that have been identified (step S147: NO), the
coping execution availability determination part 1240 goes ahead with the
processing to the step S142. On the other hand, in the case where the
processing has been completed for all the server level virtual volumes that
have been identified (step S147: YES), the coping execution availability
determination part 1240 terminates the processing.
[0244]
According to the HL-VVOL capacity reduction availability determination
processing for an LLP, a server level virtual volume that belongs to an LLP
in which a capacity can be reduced can be detected in an appropriate
manner.
[0245]
Fig. 24 is a flowchart of an extension availability determination processing of
an LLP. An extension availability determination processing of an LLP is a
processing that is corresponded to the step S93 of the coping execution
availability determination processing of a storage level pool that is shown in
Fig. 18.
[0246]
(Step S151) The coping execution availability determination part 1240 refers
to the storage level pool information table 1100, and identifies an identifier of
the storage system to which the storage level pool of a processing target
belongs.
[0247]
(Step S152) The coping execution availability determination part 1240 refers
to the information of the storage system and determines whether or not
61
there is a surplus volume in the storage system. As a result, in the case
where there is a surplus volume (step S152: YES), the coping execution
availability determination part 1240 goes ahead with the processing to the
step S153. On the other hand, in the case where there is not a surplus
volume (step S152: NO), since an extension of the storage level pool cannot
be executed, the coping execution availability determination part 1240
terminates the processing.
[0248]
(Step S153) The coping execution availability determination part 1240 stores
a storage level pool of a processing target as a storage level pool that can be
extended into the memory 110. More specifically, the coping execution
availability determination part 1240 adds a record to the storage level pool
extension table 1800, makes the improvement point 1801 to be an identifier
of a storage level pool, and makes a maximum extensible capacity 1802 to be
a capacity of a surplus volume.
[0249]
By the extension availability determination processing of an LLP, whether or
not an extension of a storage level pool can be executed can be detected in an
appropriate manner.
[0250]
Fig. 25 is a flowchart of a VOL adjustment availability determination
processing between LLPs. A VOL adjustment availability determination
processing between LLPs is a processing that is corresponded to the step S92
of the coping execution availability determination processing of a storage
level pool that is shown in Fig. 18.
[0251]
(Step S161) The coping execution availability determination part 1240 refers
to the storage level pool information table 1100, and identifies an identifier of
the storage system to which the storage level pool of a processing target
belongs.
(Step S162) The coping execution availability determination part 1240 refers
to the storage level pool information table 1100, and acquires an identifier of
62
all other storage level pools that belong to the storage system that has been
identified.
[0252]
(Step S163) The coping execution availability determination part 1240
selects one of the identifiers of the storage level pools that have been
acquired as an identifier of a storage level virtual volume of a processing
target.
[0253]
(Step S164) The coping execution availability determination part 1240 refers
to the volume information table 1000 and determines whether or not there is
an unused volume in the storage level pool that has been selected. As a
result, in the case where there is an unused volume in the storage level pool
that has been selected (step S164: YES), the coping execution availability
determination part 1240 goes ahead with the processing to the step S165.
On the other hand, in the case where there is not an unused volume in the
storage level pool that has been selected (step S164: NO), since an extension
of the storage level pool cannot be executed, the coping execution availability
determination part 1240 goes ahead with the processing to the step S166.
[0254]
(Step S165) The coping execution availability determination part 1240 stores
an unused volume as a volume that can be adjusted into the memory 110.
[0255]
(Step S166) The coping execution availability determination part 1240
determines whether or not the processing has been completed for all the
storage level pools that have been acquired in the step S162. As a result, in
the case where the processing has not been completed for all the storage level
pools that have been identified (step S166: NO), the coping execution
availability determination part 1240 goes ahead with the processing to the
step S163. On the other hand, in the case where the processing has been
completed for all the storage level pools that have been identified (step S166:
YES), the coping execution availability determination part 1240 terminates
the processing.
63
[0256]
According to the VOL adjustment availability determination processing
between LLPs, a volume that can be adjusted between storage level pools can
be detected in an appropriate manner.
[0257]
In the next place, a coping display processing for displaying a coping
measure that has been determined as executable by the coping execution
availability determination part 1240 will be described in the following.
[0258]
The coping display processing is executed in the case where an execution
instruction is received from a manager via the input/output device 160 and
immediately after a coping execution availability determination processing is
executed by the coping execution availability determination part 1240 for
instance.
[0259]
The coping simulation part 1250 displays a screen that is shown in Fig. 26
and that indicates a risk degree for a virtual server, a server level pool, and a
storage level pool on the input/output device 160 based on the information of
the server level pool information table 1300, the storage level pool
information table 1100, and the virtual server information table 2200. By
this configuration a manager can comprehend a virtual server in which a
risk of a stoppage is high in an appropriate manner. Moreover, the coping
simulation part 1250 displays a coping measure that has been determined as
executable by the coping execution availability determination part 1240, that
is, the information for a coping measure that can be executed near an
improvement point in a selectable manner on a screen shown in Fig. 26
based on the information of a coping measure that has been stored into the
unnecessary virtual server table 1600, the server level virtual volume
extension table 1700, the storage level pool extension table 1800, the
migration table 1900, and the inter-storage level pool volume adjustment
table 2000 or the like.
[0260]
64
Fig. 26 is a view showing an example of a display screen for displaying an
executable coping and a VM risk status.
[0261]
The display screen displays the information that is corresponded to a risk
degree on a graphic that indicates a virtual server in the case where a risk
degree that indicates a possibility of a stoppage of a virtual server is high.
Moreover, the information that indicates a risk degree is displayed and a list
of coping measures that can be taken to a risk degree is also displayed on a
graphic that indicates a point that is a cause a risk degree that indicates a
possibility of a stoppage of a virtual server (for instance, a storage level pool
in Fig. 26). For instance, in the example of Fig. 26, a mark that indicates a
risk is displayed for the VM1 and VM3, and a risk is displayed for the LLP.
By the screen, a risk degree of a virtual server and a status of a point that is
a cause can be comprehended in an appropriate manner.
[0262]
Moreover, in the display screen of Fig. 26, a capacity reduction of a storage
level virtual volume and an extension of a server level pool are displayed as a
coping measure that can be executed to the LLP. In the example of Fig. 26,
a selection area that is configured to select the coping measure is displayed
corresponding to each coping measure in the list of coping measures. By
this configuration, a manager can comprehend a coping measure that can be
taken in an appropriate manner.
[0263]
In the present embodiment, in the case where a selection area that is
corresponded to a coping measure of the display screen is selected by an
operation of the input/output device 160, the coping simulation part 1250
executes a simulation processing in the case where it is assumed that a
coping measure that is corresponded to the selection area has been executed
and displays a screen that is shown in Fig. 27 based on the simulation result.
Moreover, a plurality of coping measures can also be selected simultaneously
and the coping simulation part 1250 can also execute a simulation processing
in the case where a plurality of coping measures are executed.
65
[0264]
In the simulation processing, the coping simulation part 1250 identifies a
record that is corresponded to a coping measure that has been selected from
the unnecessary virtual server table 1600, the server level virtual volume
extension table 1700, the storage level pool extension table 1800, the
migration table 1900, or the inter-storage level pool volume adjustment table
2000, calculates a capacity for a server level pool and a storage level pool in
the case where a coping measure is executed based on the information of the
record that has been identified, and executes a wide variety of processing (a
risk degree calculation processing or the like) by a risk degree calculation
part 1210 that has been described above based on the capacity that has been
calculated.
[0265]
Fig. 27 is a view showing an example of a display screen for displaying a
selection and a simulation result of an executable coping.
[0266]
For the display screen, a selection area that is corresponded to a coping
measure that has been selected is displayed as a selection status, a
processing that is executed is displayed in a region that is corresponded to
the coping measure (a server level virtual volume in Fig. 17), a risk degree in
the case where the coping measure is executed is displayed to the virtual
server, and the information that indicates a status in the case where the
coping measure is executed in a point that is a cause. For instance, in the
example of Fig. 27, since a risk degree is resolved for the VM1 and VM3, a
mark that indicates a risk degree is not displayed and “Safe” is displayed for
the LLP that is a point that is a cause. By the screen, a simulation result in
the case where the coping measure is executed can be comprehended in an
appropriate manner.
[0267]
A simulation result in the case where a computer system is in a status that is
shown in Fig. 28 will be described in detail.
[0268]
66
In the case where a capacity of the HL-VVOL1 (VHD1) is reduced by 30 GB
and is made to be 40 GB as a coping measure for instance, a use capacity of
the HLP1 is 60 GB and a free capacity is 40 GB. Consequently, in the case
where a risk degree is calculated again, a discrepancy degree is (90-40) / 40 =
1.25 and a grace time is 40 / 2 = 20. As a result, a risk degree is “Safe”.
[0269]
Moreover, in the case where the HL-VVOL2 is migrated to the HLP2 as a
coping measure for instance, a use capacity of the HLP1 is 90-20 = 70 GB
and a free capacity is 30 GB. Consequently, in the case where a risk degree
is calculated again, a discrepancy degree is (60-30) / 30 = 1 and a grace time
is 30 / 2 = 15. As a result, a risk degree is “Safe”. Furthermore, a use
capacity of the HLP2 is 10 + 20 = 30 GB and a free capacity is 70 GB.
Consequently, in the case where a risk degree is calculated again, a
discrepancy degree is (70-70)/70=1 and a grace time is 70 / 2 = 35. As a
result, a risk degree is “Safe”.
[0270]
Moreover, in the case where the VM2 is deleted as a coping measure for
instance, a use capacity of the HLP1 is 70 GB and a free capacity is 30 GB.
Consequently, in the case where a risk degree is calculated again, a
discrepancy degree is (90-30) / 30 = 3 and a grace time is 30 / 2 = 15. As a
result, a risk degree is “Safe”.
[0271]
Moreover, in the case where ta capacity of the HLP1 is extended by 50 GB as
a coping measure for instance, a free capacity of the HLP1 is 60 GB.
Consequently, in the case where a risk degree is calculated again, a
discrepancy degree is (90-60) / 60 = 0.5 and a grace time is 60 / 2 = 30. As a
result, a risk degree is “Safe”.
[0272]
While the some preferred embodiments according to the present invention
have been described above, the embodiments are examples for describing the
present invention and the scope of the present invention is not restricted to
the above embodiments. In other words, the present invention can also be
67
executed by other modes of every sort and kind.
[Reference Signs List]
[0273]
100: Management server
120: Management program
200: Physical server
220: Server level pool
300: Storage system
330: Storage level pool

WE CLAIMS:-
A management system for managing a storage system configured to comprise
one or more volumes which belong to a storage level pool and a server
computer coupled to the storage system and configured to execute a
computer program,
wherein the storage system is configured to supply a storage
level virtual volume that is associated with the storage level pool, wherein an
or all areas of the storage level virtual volume are areas to which areas in the
one or more volumes which belong to the storage level pool are not allocated,
and
wherein the server computer is configured to manage a server
level pool to which the storage level virtual volume belongs and is configured
to supply a server level virtual volume that is associated with the server
level pool,
the management system comprising:
a communication interface device configured to communicate with
the storage system and the server computer;
a storage device; and
a processor coupled to the communication interface device and the
storage device, and
wherein the processor is configured to:
(A) acquire the storage level pool information that includes
the information of a capacity of the storage level pool from the storage
system and store the storage level pool information that has been acquired to
the storage device;
(B) acquire the server level pool information that includes the
information of a capacity of the server level pool from the server computer
and store the server level pool information that has been acquired to the
storage device;
(C) determine a first risk degree that indicates a risk of a
depletion of a free capacity of the storage level pool based on the storage level
69
pool information;
(D) determine a second risk degree that indicates a risk of a
depletion of a free capacity of the server level pool based on the server level
pool information; and
(E) display the information that is associated with the first
risk degree that indicate a risk of a depletion of a free capacity of the storage
level pool and the second risk degree that indicate a risk of a depletion of a
free capacity of the server level pool.
[Claim 2]
A management system according to claim 1,
wherein the storage level pool information is configured to include
the information that indicates a physical free capacity of the storage level
pool,
wherein the server level pool information is configured to include the
information that indicates a physical free capacity of the server level pool
and a capacity that is unallocated to the server level virtual volume, and
wherein the processor is configured to:
in (C), calculate a first discrepancy degree that indicates the
relationship between the physical free capacity of the storage level pool and
an unallocated capacity in a virtual capacity to the server level virtual
volume that is associated with the storage level pool based on the storage
level pool information, and determine a first risk degree that indicates a risk
of a depletion of a free capacity of the storage level pool based on the first
discrepancy degree; and
in (D), calculate a second discrepancy degree that indicates
the relationship between the physical free capacity of the server level pool
and an unallocated capacity in a virtual capacity to the server level virtual
volume that is associated with the server level pool based on the server level
pool information, and determine a second risk degree that indicates a risk of
a depletion of a free capacity of the server level pool based on the second
discrepancy degree.
[Claim 3]
70
A management system according to claim 2,
wherein the processor is configured to:
in (C), calculate a first grace period to a depletion of a free
capacity of the storage level pool based on the capacity variation information
that indicates a variation tendency of a used capacity of the storage level
pool, and determine a first risk degree that indicates a risk of a depletion of a
free capacity of the storage level pool based on the first discrepancy degree
and the first grace period; and
in (D), calculate a second grace period to a depletion of a free
capacity of the server level pool based on the capacity variation information
that indicates a variation tendency of a used capacity of the server level pool,
and determine a second risk degree that indicates a risk of a depletion of a
free capacity of the server level pool based on the second discrepancy degree
and the second grace period.
[Claim 4]
A management system according to claim 1,
wherein the processor is configured to:
in (C), calculate a first grace period to a depletion of a free
capacity of the storage level pool based on the capacity variation information
that indicates a variation tendency of a used capacity of the storage level
pool, and determine a first risk degree that indicates a risk of a depletion of a
free capacity of the storage level pool based on the first grace period; and
in (D), calculate a second grace period to a depletion of a free
capacity of the server level pool based on the capacity variation information
that indicates a variation tendency of a used capacity of the server level pool,
and determine a second risk degree that indicates a risk of a depletion of a
free capacity of the server level pool based on the second grace period.
[Claim 5]
A management system according to claim 1,
wherein the server computer is configured to store data that is used
for a virtual machine to the server level virtual volume, and
wherein the processor is configured to:
71
determine a third risk degree that indicates a risk of a
stoppage of the virtual machine based on the first risk degree and the second
risk degree; and
display the information that is associated with the third risk
degree.
[Claim 6]
A management system according to claim 2,
wherein the processor is configured to determine the first risk degree
and the second risk degree based on the comparison result of the first and
second discrepancy degrees and a first threshold value that is associated
with a discrepancy degree that has been configured in advance.
[Claim 7]
A management system according to claim 4,
wherein the processor is configured to determine the first risk degree
and the second risk degree based on the comparison result of the first and
second grace periods and a second threshold value that is associated with a
grace period that has been configured in advance.
[Claim 8]
A management system according to claim 1,
wherein the processor is configured to detect a virtual machine that
is configured to use the storage level pool that indicates that the risk degree
is high, calculate an influence degree caused by a depletion of a free capacity
of the storage level pool based on the virtual machine that has been detected,
and display the influence degree in conjunction with the risk degree.
[Claim 9]
A management system according to claim 1,
wherein the processor is configured to detect an executable coping
measure for reducing a risk degree of the storage level pool and the server
level pool that indicate that the risk degree is high, and display the
information that is associated with the coping measure.
[Claim 10]
A management system according to claim 9,
72
wherein the processor is configured to receive a selection of any one
of the coping measure, re-determine a risk degree of the storage level pool
and the server level pool in the case where the coping measure is executed,
and display the result of the re-determination.
[Claim 11]
A management system according to claim 9,
wherein the coping measure is any one of a reduction of a capacity of
the server level virtual volume, a migration of the server level virtual volume,
a reduction of the virtual machine, and an extension of a capacity of the
server level pool.
[Claim 12]
A management method for managing a storage system configured to
comprise one or more volumes which belong to a storage level pool and a
server computer coupled to the storage system and configured to execute a
computer program,
wherein the storage system is configured to supply a storage
level virtual volume that is associated with the storage level pool, wherein an
or all areas of the storage level virtual volume are areas to which areas in the
one or more volumes which belong to the storage level pool are not allocated,
and
wherein the server computer is configured to manage a server
level pool to which the storage level virtual volume belongs and is configured
to supply a server level virtual volume that is associated with the server
level pool,
the management method comprising the steps of:
(A) acquiring the storage level pool information that includes the
information of a capacity of the storage level pool from the storage system;
(B) acquiring the server level pool information that includes the
information of a capacity of the server level pool from the server computer;
(C) determining a first risk degree that indicates a risk of a depletion
of a free capacity of the storage level pool based on the storage level pool
information;
73
(D) determining a second risk degree that indicates a risk of a
depletion of a free capacity of the server level pool based on the server level
pool information; and
(E) displaying the information that is associated with the first risk
degree that indicate a risk of a depletion of a free capacity of the storage level
pool and the second risk degree that indicate a risk of a depletion of a free
capacity of the server level pool.
[Claim 13]
A management method according to claim 12,
wherein the storage level pool information is configured to include
the information that indicates a physical free capacity of the storage level
pool,
wherein the server level pool information is configured to include the
information that indicates a physical free capacity of the server level pool
and a capacity that is unallocated to the server level virtual volume, and
wherein the management method comprises the steps of:
in (C), calculating a first discrepancy degree that indicates
the relationship between the physical free capacity of the storage level pool
and an unallocated capacity in a virtual capacity to the server level virtual
volume that is associated with the storage level pool based on the storage
level pool information, and determining a first risk degree that indicates a
risk of a depletion of a free capacity of the storage level pool based on the
first discrepancy degree; and
in (D), calculating a second discrepancy degree that indicates
the relationship between the physical free capacity of the server level pool
and an unallocated capacity in a virtual capacity to the server level virtual
volume that is associated with the server level pool based on the server level
pool information, and determining a second risk degree that indicates a risk
of a depletion of a free capacity of the server level pool based on the second
discrepancy degree.
[Claim 14]
A management method according to claim 12, further comprising the steps
74
of:
in (C), calculating a first grace period to a depletion of a free capacity
of the storage level pool based on the capacity variation information that
indicates a variation tendency of a used capacity of the storage level pool,
and determining a first risk degree that indicates a risk of a depletion of a
free capacity of the storage level pool based on the first grace period; and
in (D), calculating a second grace period to a depletion of a free
capacity of the server level pool based on the capacity variation information
that indicates a variation tendency of a used capacity of the server level pool,
and determining a second risk degree that indicates a risk of a depletion of a
free capacity of the server level pool based on the second grace period.