Sign In to Follow Application
View All Documents & Correspondence

Air Conditioner And Air Conditioner Control Method

Abstract: This air conditioner (5) is provided with: a signal receiving unit (56) which receives an operation instruction signal; a rotary compressor (8) which has a motor (1) with a coil (3); an inverter (103) which is connected to the coil (3); a connection switching unit (60) which switches the connection state of the coil (3) between a first connection state and a second connection state; and a control device (50) which controls the inverter (103) and the connection switching unit (60). In the case that the signal receiving unit (56) receives an operation stop signal the connection switching unit (60) switches the connection state of the coil (3) from the first connection states to the second connection state.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
08 April 2019
Publication Number
19/2019
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
patent@depenning.com
Parent Application
Patent Number
Legal Status
Grant Date
2021-11-25
Renewal Date

Applicants

MITSUBISHI ELECTRIC CORPORATION
7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo 100-8310

Inventors

1. NIGO, Masahiro
c/o Mitsubishi Electric Corporation, 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo 100-8310

Specification

We Claim:
1. An air conditioner comprising:
a signal receiving unit to receive an operation instruction signal;
a compressor including a motor including coils;
an inverter connected to the coils;
a connection switching unit to switch a connection state of the coils between a first connection state and a second connection state; and
a controller to control the inverter and the connection switching unit, wherein
when the signal receiving unit receives an operation stop signal, the connection switching unit switches the connection state of the coils from the first connection state to the second connection state.
2. The air conditioner according to claim 1, wherein the controller stops the motor when the signal receiving unit receives the operation stop signal for the air conditioner.
3. The air conditioner according to claim 1 or 2, wherein operation of the air conditioner stops after the connection state of the coils is switched from the first connection state to the second connection state.
4. The air conditioner according to any one of claims 1 to 3, wherein the connection state of the coils is the second connection state after the motor stops.
5. The air conditioner according to any of claims 1 to 4, wherein the connection state of the coils is the second connection state at start-up of the air conditioner, and the connection switching unit switches the connection state of the

coils from the second connection state to the first connection state after the start-up of the air conditioner.
6. The air conditioner according to claim 5, wherein the connection switching unit switches the connection state of the coils from the second connection state to the first connection state when rotation speed of the motor reaches a predetermined rotation speed.
7. The air conditioner according to any one of claims 1 to 6, wherein a line voltage of the inverter in the second connection state is lower than a line voltage of the inverter in the first connection state.
8. The air conditioner according to any one of claims 1 to 7, further comprising a converter to boost voltage to be applied to the motor in which the connection state of the coils is the second connection state at start-up of the air conditioner.
9. The air conditioner according to any one of claims 1 to 8, wherein the coils are three-phase coils.
10. The air conditioner according to claim 9, wherein the first connection state is a state in which the three-phase coils are connected in Y connection.
11. The air conditioner according to claim 9 or 10, wherein the second connection state is a state in which the three-phase coils are connected in delta connection.
12. The air conditioner according to any one of claims 1 to 8, wherein
the coils are three-phase coils connected in Y connection or delta connection,

the first connection state is a state in which the three-phase coils are connected in series in each phase, and
the second connection state is a state in which the three-phase coils are connected in parallel in each phase.
13. The air conditioner according to any one of claims 10 to
12, wherein the three-phase coils are connected in parallel in
each phase at start-up of the air conditioner.
14. The air conditioner according to any one of claims 1 to
13, further comprising:
an indoor unit including the signal receiving unit; and an outdoor unit including the compressor and the connection switching unit.
15. A method for controlling an air conditioner including a
motor including coils, the method comprising:
receiving an operation stop signal for the air conditioner; and
switching a connection state of the coils from a first connection state to a second connection state based on the operation stop signal.

Documents

Application Documents

# Name Date
1 201947014015.pdf 2019-04-08
2 201947014015-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [08-04-2019(online)].pdf 2019-04-08
3 201947014015-STATEMENT OF UNDERTAKING (FORM 3) [08-04-2019(online)].pdf 2019-04-08
4 201947014015-REQUEST FOR EXAMINATION (FORM-18) [08-04-2019(online)].pdf 2019-04-08
5 201947014015-PROOF OF RIGHT [08-04-2019(online)].pdf 2019-04-08
6 201947014015-POWER OF AUTHORITY [08-04-2019(online)].pdf 2019-04-08
7 201947014015-FORM 18 [08-04-2019(online)].pdf 2019-04-08
8 201947014015-FORM 1 [08-04-2019(online)].pdf 2019-04-08
9 201947014015-DRAWINGS [08-04-2019(online)].pdf 2019-04-08
10 201947014015-DECLARATION OF INVENTORSHIP (FORM 5) [08-04-2019(online)].pdf 2019-04-08
11 201947014015-COMPLETE SPECIFICATION [08-04-2019(online)].pdf 2019-04-08
12 201947014015-CLAIMS UNDER RULE 1 (PROVISIO) OF RULE 20 [08-04-2019(online)].pdf 2019-04-08
13 Correspondence by Agent_Form1_15-04-2019.pdf 2019-04-15
14 201947014015-RELEVANT DOCUMENTS [25-04-2019(online)].pdf 2019-04-25
15 201947014015-MARKED COPIES OF AMENDEMENTS [25-04-2019(online)].pdf 2019-04-25
16 201947014015-FORM 13 [25-04-2019(online)].pdf 2019-04-25
17 201947014015-AMMENDED DOCUMENTS [25-04-2019(online)].pdf 2019-04-25
18 201947014015-FORM 3 [09-09-2019(online)].pdf 2019-09-09
19 201947014015-FORM 3 [10-03-2020(online)].pdf 2020-03-10
20 201947014015-FER.pdf 2020-05-04
21 201947014015-OTHERS [28-08-2020(online)].pdf 2020-08-28
22 201947014015-Information under section 8(2) [28-08-2020(online)].pdf 2020-08-28
23 201947014015-FORM-26 [28-08-2020(online)].pdf 2020-08-28
24 201947014015-FORM 3 [28-08-2020(online)].pdf 2020-08-28
25 201947014015-FER_SER_REPLY [28-08-2020(online)].pdf 2020-08-28
26 201947014015-CLAIMS [28-08-2020(online)].pdf 2020-08-28
27 201947014015-ABSTRACT [28-08-2020(online)].pdf 2020-08-28
28 201947014015-FORM 3 [02-08-2021(online)].pdf 2021-08-02
29 201947014015-PatentCertificate25-11-2021.pdf 2021-11-25
30 201947014015-IntimationOfGrant25-11-2021.pdf 2021-11-25
31 201947014015-RELEVANT DOCUMENTS [20-09-2023(online)].pdf 2023-09-20

Search Strategy

1 SearchstrategyE_30-04-2020.pdf

ERegister / Renewals

3rd: 24 Dec 2021

From 31/10/2018 - To 31/10/2019

4th: 24 Dec 2021

From 31/10/2019 - To 31/10/2020

5th: 24 Dec 2021

From 31/10/2020 - To 31/10/2021

6th: 24 Dec 2021

From 31/10/2021 - To 31/10/2022

7th: 15 Sep 2022

From 31/10/2022 - To 31/10/2023

8th: 12 Sep 2023

From 31/10/2023 - To 31/10/2024