Abstract: A system for humidifying air in a pre-conditioning chamber is disclosed. The system (100) includes a suction fan (102) configured to suck air from a pre-conditioning chamber (104) through an inlet (106). The system (100) also includes a humidifying screen (108) covering a pathway of the sucked air, wherein the humidifying screen (108) enables water to flow through the screen downwardly to facilitate humidification of the sucked air. The system (100) further includes a humidification unit (110) including a water reservoir (110) and an ultrasonic nebulizer immersed in the reservoir, the humidification unit (110) configured to create water mist, wherein the water mist is dispersed with the humidified sucked air. The system (100) includes an outlet (116) configured to release the humidified air to the pre-conditioning chamber (104). FIG. 1
1. A system (100) for humidifying air in a pre-conditioning chamber (104), the system
comprising:
a suction fan (102) configured to suck air from a pre-conditioning chamber (104) through an inlet (106);
a humidifying screen (108) covering a pathway of the sucked air, wherein the humidifying screen (108) enables water to flow through the screen downwardly to facilitate humidification of the sucked air;
a humidification unit (110) comprising a water reservoir (112) and an ultrasonic nebulizer immersed in the reservoir (112), the humidification unit (110) configured to create water mist, wherein the water mist is dispersed with the humidified sucked air;
an outlet (116) configured to release the humidified air to the pre-conditioning chamber (104).
2. The system (100) as claimed in claim 1 further comprising one or more sensors (204-N) configured to detect humidity levels in the system.
3. The system (100) as claimed in claim 1, further comprising a computing unit (510) configured to:
compare the humidity level with one or more threshold values; and disable operation of either the humidifying screen (108) or the humidification unit (110) or both if the humidity level is greater than a first predetermined threshold value.
4. The system (100) as claimed in claim 1, wherein the water reservoir (110) comprises
one or more sub-reservoirs.
| # | Name | Date |
|---|---|---|
| 1 | 202041005095-STATEMENT OF UNDERTAKING (FORM 3) [05-02-2020(online)].pdf | 2020-02-05 |
| 2 | 202041005095-REQUEST FOR EXAMINATION (FORM-18) [05-02-2020(online)].pdf | 2020-02-05 |
| 3 | 202041005095-POWER OF AUTHORITY [05-02-2020(online)].pdf | 2020-02-05 |
| 4 | 202041005095-FORM FOR SMALL ENTITY(FORM-28) [05-02-2020(online)].pdf | 2020-02-05 |
| 5 | 202041005095-FORM FOR SMALL ENTITY [05-02-2020(online)].pdf | 2020-02-05 |
| 6 | 202041005095-FORM 18 [05-02-2020(online)].pdf | 2020-02-05 |
| 7 | 202041005095-FORM 1 [05-02-2020(online)].pdf | 2020-02-05 |
| 8 | 202041005095-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [05-02-2020(online)].pdf | 2020-02-05 |
| 9 | 202041005095-EVIDENCE FOR REGISTRATION UNDER SSI [05-02-2020(online)].pdf | 2020-02-05 |
| 10 | 202041005095-DRAWINGS [05-02-2020(online)].pdf | 2020-02-05 |
| 11 | 202041005095-DECLARATION OF INVENTORSHIP (FORM 5) [05-02-2020(online)].pdf | 2020-02-05 |
| 12 | 202041005095-COMPLETE SPECIFICATION [05-02-2020(online)].pdf | 2020-02-05 |
| 13 | 202041005095-Proof of Right [06-08-2020(online)].pdf | 2020-08-06 |
| 14 | 202041005095-Form1_After Filing_10-08-2020.pdf | 2020-08-10 |
| 15 | 202041005095-FER.pdf | 2021-12-01 |
| 16 | 202041005095-RELEVANT DOCUMENTS [10-12-2021(online)].pdf | 2021-12-10 |
| 17 | 202041005095-POA [10-12-2021(online)].pdf | 2021-12-10 |
| 18 | 202041005095-FORM 13 [10-12-2021(online)].pdf | 2021-12-10 |
| 19 | 202041005095-PETITION UNDER RULE 137 [31-05-2022(online)].pdf | 2022-05-31 |
| 20 | 202041005095-OTHERS [31-05-2022(online)].pdf | 2022-05-31 |
| 21 | 202041005095-FER_SER_REPLY [31-05-2022(online)].pdf | 2022-05-31 |
| 22 | 202041005095-DRAWING [31-05-2022(online)].pdf | 2022-05-31 |
| 23 | 202041005095-COMPLETE SPECIFICATION [31-05-2022(online)].pdf | 2022-05-31 |
| 24 | 202041005095-CLAIMS [31-05-2022(online)].pdf | 2022-05-31 |
| 25 | 202041005095-US(14)-HearingNotice-(HearingDate-05-09-2023).pdf | 2023-08-09 |
| 26 | 202041005095-Correspondence to notify the Controller [04-09-2023(online)].pdf | 2023-09-04 |
| 27 | 202041005095-Written submissions and relevant documents [06-09-2023(online)].pdf | 2023-09-06 |
| 28 | 202041005095-Annexure [06-09-2023(online)].pdf | 2023-09-06 |
| 29 | 202041005095-PatentCertificate21-09-2023.pdf | 2023-09-21 |
| 30 | 202041005095-IntimationOfGrant21-09-2023.pdf | 2023-09-21 |
| 31 | 202041005095-Response to office action [04-01-2024(online)].pdf | 2024-01-04 |
| 32 | 202041005095-Response to office action [23-07-2024(online)].pdf | 2024-07-23 |
| 1 | 202041005095E_30-11-2021.pdf |