Abstract: A machine management system, comprising one or more sensors (27) arranged to take readings of one or more operating variables for a machine (10). Data processing equipment (29) is arranged to receive data indicative of said operating variable readings for the machine and to analyse the received operational data to determine a probability distribution there-for. The processing equipment comprises one or more modules of machine-readable code for assigning a value to one or more Stable distribution parameters in dependence on the received operational data, and a departure in the machine operation from a predetermined normal operating condition is determined From the assigned distribution parameter.
see wipo
| # | Name | Date |
|---|---|---|
| 1 | 10496-CHENP-2012-AbandonedLetter.pdf | 2019-06-03 |
| 1 | Form-5.pdf | 2012-12-20 |
| 2 | 10496-CHENP-2012-FER.pdf | 2018-11-29 |
| 2 | Form-3.pdf | 2012-12-20 |
| 3 | abstract 10496-CHENP-2012.jpg | 2014-11-29 |
| 3 | Form-1.pdf | 2012-12-20 |
| 4 | 10496-CHENP-2012 POWER OF ATTORNEY 23-01-2013.pdf | 2013-01-23 |
| 4 | ABSTRACT.pdf | 2014-11-29 |
| 5 | FORM-2.pdf | 2014-11-29 |
| 5 | 10496-CHENP-2012 CORRESPONDENCE OTHERS 23-01-2013.pdf | 2013-01-23 |
| 6 | 10496-CHENP-2012 CORRESPONDENCE OTHERS 23-01-2013.pdf | 2013-01-23 |
| 6 | FORM-2.pdf | 2014-11-29 |
| 7 | 10496-CHENP-2012 POWER OF ATTORNEY 23-01-2013.pdf | 2013-01-23 |
| 7 | ABSTRACT.pdf | 2014-11-29 |
| 8 | abstract 10496-CHENP-2012.jpg | 2014-11-29 |
| 8 | Form-1.pdf | 2012-12-20 |
| 9 | 10496-CHENP-2012-FER.pdf | 2018-11-29 |
| 9 | Form-3.pdf | 2012-12-20 |
| 10 | Form-5.pdf | 2012-12-20 |
| 10 | 10496-CHENP-2012-AbandonedLetter.pdf | 2019-06-03 |
| 1 | 10496_CHENP_2012_19-03-2018.pdf |