Sign In to Follow Application
View All Documents & Correspondence

Controlled Interrupted Quenching Process

Abstract: A method of interrupted quenching process in a single quenching medium for producing higher strength steel product from a carburised material, comprising the steps of immersing the carburised material into a quenching medium at a predefined temperature of first stage to cool the material rapidly until the material reaches below than martensite starting (Ms) temperature; further cooling the said carburised material into the quenching medium by varying the temperature of the quenching medium to a predefined temperature of second stage to obtain the constant rate of slow cooling with a slow agitation rate below the martensite finish temperature; and withdrawing the material from the quenching medium when the material has reached a temperature lower than martensite finish (Mf) temperature wherein the temperature of the quenching medium is varied and controlled by switching and/ or operating the variable agitation motor fans and variable power controlled heaters.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
14 February 2019
Publication Number
34/2020
Publication Type
INA
Invention Field
METALLURGY
Status
Email
info@krishnaandsaurastri.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-10-04
Renewal Date

Applicants

MAHINDRA & MAHINDRA LIMITED
Mahindra Research Valley, Mahindra World City, P.O. – Anjur,Chengalpattu – 603204, Distt. – Kancheepuram, Tamil Nadu), India.

Inventors

1. Surendar Shawn Paul
Mahindra Research Valley, Mahindra World City, P.O. Anjur, Chengalpattu,Kancheepuram Distt, Tamil Nadu - 603 204.
2. Vijay Sankar G
Mahindra Research Valley, Mahindra World City, P.O. Anjur, Chengalpattu, Distt. – Kancheepuram, Tamil Nadu - 603 204.
3. Sivakumar V
Mahindra Research Valley, Mahindra World City, P.O. Anjur, Chengalpattu, Distt. – Kancheepuram, Tamil Nadu - 603 204.
4. C Karthikeyan
Mahindra Research Valley, Mahindra World City, P.O. Anjur, Chengalpattu, Distt. – Kancheepuram, Tamil Nadu - 603 204.

Specification

WE CLAIM:
1. A method of interrupted quenching process in a single quenching
medium for producing higher strength steel product from a
carburised material, comprising the steps of:
a) immersing the carburised material into a quenching medium at a predefined temperature of first stage to cool the material rapidly until the material reaches below than martensite starting Ms temperature;
b) further cooling the said carburised material into the quenching medium by varying the temperature of the quenching medium to a predefined temperature of second stage to obtain the constant rate of slow cooling with a slow agitation rate below the martensite finish temperature; and
c) withdrawing the material from the quenching medium when the material has reached a temperature lower than martensite finish Mf temperature;
wherein the temperature of the quenching medium is varied and controlled by switching and/ or operating the variable agitation electric motor fans, variable power-controlled heaters and coolers.
2. The method as claimed in claim 1, wherein the carburised material
is quenched into the quenching medium having the predetermined
temperature of the first stage less than the predetermined

temperature of the second stage to obtain the higher strength steel product having hard case.
3. The method as claimed in claim 2, wherein the predetermined temperature of the first stage ranges from 80 to 140 degree Celsius.
4. The method as claimed in claim 1, wherein the carburised material is quenched into a quenching medium having the predetermined temperature of the first stage higher than the predetermined temperature of second stage to obtain the low distortion steel product.
5. The method as claimed in claim 4, wherein the predetermined temperature of the first stage ranges from 140 to 170 degree Celsius.
6. The method as claimed in claim 1, wherein the temperature of the
cooling medium is increased by operating the variable power
controlled heaters.
7. The method as claimed in claim one of the preceding claims 1-5,
wherein the temperature difference between the predetermined

temperatures of the first stage quenching medium and the second stage quenching medium is atleast 100 degree Celsius.
8. The method as claimed in claim 1, wherein the electric motor is operated between 800 to 2400 revolutions per minute for rapid cooling and the slow agitation rate is obtained by operating the electric motor fan between 200-800 revolutions per minutes.
9. The method as claimed in claim 1, wherein the viscosity of the cooling medium ranges between 70 to 150 centistokes.
10. .The method as claimed in claim 1, wherein the carburised product attains fifty percent of the martensite on the case of the said material to achieve the maximum compressive residual stress of the carburised material before reaching the martensite starting (Ms) temperature of the case of the carburised material and the hundred percent of martensite conversion is achieved by the carburised

material before reaching the martensite finish (Mf) temperature of the case of the material.

Documents

Orders

Section Controller Decision Date

Application Documents

# Name Date
1 201941005857-IntimationOfGrant04-10-2023.pdf 2023-10-04
1 201941005857-STATEMENT OF UNDERTAKING (FORM 3) [14-02-2019(online)].pdf 2019-02-14
2 201941005857-PatentCertificate04-10-2023.pdf 2023-10-04
2 201941005857-REQUEST FOR EXAMINATION (FORM-18) [14-02-2019(online)].pdf 2019-02-14
3 201941005857-Written submissions and relevant documents [26-09-2023(online)].pdf 2023-09-26
3 201941005857-FORM 18 [14-02-2019(online)].pdf 2019-02-14
4 201941005857-FORM-26 [08-09-2023(online)].pdf 2023-09-08
4 201941005857-FORM 1 [14-02-2019(online)].pdf 2019-02-14
5 201941005857-DRAWINGS [14-02-2019(online)].pdf 2019-02-14
5 201941005857-Correspondence to notify the Controller [06-09-2023(online)].pdf 2023-09-06
6 201941005857-US(14)-HearingNotice-(HearingDate-11-09-2023).pdf 2023-07-28
6 201941005857-DECLARATION OF INVENTORSHIP (FORM 5) [14-02-2019(online)].pdf 2019-02-14
7 201941005857-Response to office action [09-08-2022(online)].pdf 2022-08-09
7 201941005857-COMPLETE SPECIFICATION [14-02-2019(online)].pdf 2019-02-14
8 201941005857-Proof of Right (MANDATORY) [12-04-2019(online)].pdf 2019-04-12
8 201941005857-FER.pdf 2021-10-17
9 201941005857-ABSTRACT [30-03-2021(online)].pdf 2021-03-30
9 201941005857-FORM-26 [12-04-2019(online)].pdf 2019-04-12
10 201941005857-CLAIMS [30-03-2021(online)].pdf 2021-03-30
10 Correspondence by Agent_General Power Of Attorney_22-04-2019.pdf 2019-04-22
11 201941005857-COMPLETE SPECIFICATION [30-03-2021(online)].pdf 2021-03-30
11 201941005857-OTHERS [30-03-2021(online)].pdf 2021-03-30
12 201941005857-DRAWING [30-03-2021(online)].pdf 2021-03-30
12 201941005857-FER_SER_REPLY [30-03-2021(online)].pdf 2021-03-30
13 201941005857-DRAWING [30-03-2021(online)].pdf 2021-03-30
13 201941005857-FER_SER_REPLY [30-03-2021(online)].pdf 2021-03-30
14 201941005857-COMPLETE SPECIFICATION [30-03-2021(online)].pdf 2021-03-30
14 201941005857-OTHERS [30-03-2021(online)].pdf 2021-03-30
15 201941005857-CLAIMS [30-03-2021(online)].pdf 2021-03-30
15 Correspondence by Agent_General Power Of Attorney_22-04-2019.pdf 2019-04-22
16 201941005857-ABSTRACT [30-03-2021(online)].pdf 2021-03-30
16 201941005857-FORM-26 [12-04-2019(online)].pdf 2019-04-12
17 201941005857-Proof of Right (MANDATORY) [12-04-2019(online)].pdf 2019-04-12
17 201941005857-FER.pdf 2021-10-17
18 201941005857-Response to office action [09-08-2022(online)].pdf 2022-08-09
18 201941005857-COMPLETE SPECIFICATION [14-02-2019(online)].pdf 2019-02-14
19 201941005857-US(14)-HearingNotice-(HearingDate-11-09-2023).pdf 2023-07-28
19 201941005857-DECLARATION OF INVENTORSHIP (FORM 5) [14-02-2019(online)].pdf 2019-02-14
20 201941005857-DRAWINGS [14-02-2019(online)].pdf 2019-02-14
20 201941005857-Correspondence to notify the Controller [06-09-2023(online)].pdf 2023-09-06
21 201941005857-FORM-26 [08-09-2023(online)].pdf 2023-09-08
21 201941005857-FORM 1 [14-02-2019(online)].pdf 2019-02-14
22 201941005857-Written submissions and relevant documents [26-09-2023(online)].pdf 2023-09-26
22 201941005857-FORM 18 [14-02-2019(online)].pdf 2019-02-14
23 201941005857-REQUEST FOR EXAMINATION (FORM-18) [14-02-2019(online)].pdf 2019-02-14
23 201941005857-PatentCertificate04-10-2023.pdf 2023-10-04
24 201941005857-STATEMENT OF UNDERTAKING (FORM 3) [14-02-2019(online)].pdf 2019-02-14
24 201941005857-IntimationOfGrant04-10-2023.pdf 2023-10-04
25 201941005857-FORM 4 [06-05-2025(online)].pdf 2025-05-06

Search Strategy

1 176SSME_09-09-2020.pdf

ERegister / Renewals

3rd: 29 Dec 2023

From 14/02/2021 - To 14/02/2022

4th: 29 Dec 2023

From 14/02/2022 - To 14/02/2023

5th: 29 Dec 2023

From 14/02/2023 - To 14/02/2024

6th: 29 Dec 2023

From 14/02/2024 - To 14/02/2025

7th: 13 May 2025

From 14/02/2025 - To 14/02/2026