Sign In to Follow Application
View All Documents & Correspondence

Coordination Of Self Optimization Operations In A Self Organizing Network

Abstract: Embodiments of the present disclosure describe device methods computer readable media and system configurations for coordinating a plurality of self optimization operations such as an energy saving management operation and a capacity and coverage optimization operation to reduce conflicts between changes to configuration parameters of a wireless network access node caused by the self optimization operations. Other embodiments may be described and/or claimed.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
28 April 2014
Publication Number
27/2015
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
iprdel@lakshmisri.com
Parent Application
Patent Number
Legal Status
Grant Date
2021-10-27
Renewal Date

Applicants

INTEL CORPORATION
2200 Mission College Boulevard Santa Clara California 95052

Inventors

1. CHOU Joey
8825 N. 85th Place Scottsdale Arizona 85258
2. VENKATACHALAM Muthaiah
16620 NW Paddington Dr. Beaverton Oregon 97006

Specification

WE CLAIM:
1. An apparatus (400) to be employed in an evolved nodeB (eNB) (12), the apparatus
comprising:
one or more processors (404) operably coupled with one or more non-transitory computer readable media, the one or more processors are to execute instructions to implement a plurality of self-organizing network (SON) functions, wherein each SON function of the plurality of SON functions comprises SON coordination functionality to coordinate configuration parameter changes among the plurality of SON functions, and wherein, to operate the SON coordination functionality of an energy savings management (ESM) function of the plurality of SON functions, the one or more processors are to execute the instructions to:
identify a trigger for the eNB to enter an energy savings (ES) compensation state
to compensate for a cell provided by another eNB that is to enter an energy saving (ES)
state;
determine whether one or more configuration parameters are currently being
changed for the eNB by a SON function of the plurality of SON functions other than the
ESM function; and
instruct the eNB to initiate the ES compensation state when the one or more
configuration parameters are not currently being changed by the SON function other
than the ESM function.
2. The apparatus of claim 1, wherein the one or more processors are to execute the
instructions to:
instruct the eNB to not initiate the ES compensation state based on a determination that the one or more configuration parameters are currently being changed.
3. The apparatus of claim 1, wherein, to instruct the eNB to initiate the ES
compensation state, the one or more processors are to execute the instructions to:
instruct the eNB to adjust a configuration parameter of the one or more configuration parameters.

11

INTL-427-IN

4. The apparatus of claim 1, wherein the eNB is to be triggered by the ESM function to compensate the other eNB at off-peak times to provide coverage to accommodate powering down of the other eNB.
5. The apparatus of claim 1, wherein the SON function other than the ESM function is a capacity and coverage optimization (CCO) function.
6. The apparatus of claim 1, wherein the one or more configuration parameters include one or more of a downlink transmission power, an antenna tilt, or an antenna azimuth.
7. A computer-implemented method comprising:
implementing a plurality of self-organizing network (SON) functions, wherein each SON function of the plurality of SON functions comprises SON coordination functionality to coordinate configuration parameter changes among the plurality of SON functions, and wherein, to operate the SON coordination functionality of an energy savings management (ESM) function of the plurality of SON functions;
determining whether an evolved nodeB (eNB) (12) is to be activated to compensate for another eNB that is to enter an energy saving (ES) state;
determining whether one or more configuration parameters are currently being changed for the eNB by a capacity and coverage optimization (CCO) function, wherein the CCO function is among the plurality of SON functions;
instructing the eNB to not initiate an ES compensate state when it is determined that the one or more configuration parameters are being changed by the CCO function such that the eNB will not compensate for the other eNB that is to enter the ES state.
8. The computer-implemented method of claim 7, further comprising:
instructing the eNB to initiate the ES compensate state when it is determined that the one or more configuration parameters are not being changed by the CCO function such that the eNB will compensate for the other eNB after the other eNB enters the ES state.

12

INTL-427-IN

9. The computer-implemented method of claim 8, wherein instructing the eNB to
initiate the ES compensate state comprises:
instructing the eNB to adjust a configuration parameter of the one or more configuration parameters.
10. The computer-implemented method of claim 7, wherein the eNB is to be activated
to compensate the cell that is to enter ES state by an ES function, and the method further
comprises:
determining whether the eNB is currently in an ES state; and
refraining from instructing the eNB to initiate the ES compensate state when it is determined that the eNB is currently in the ES state.
11. The computer-implemented method of claim 7, wherein the one or more
configuration parameters include one or more of a downlink transmission power, an antenna
tilt, or an antenna azimuth.
12. The computer-implemented method of claim 7, wherein determining whether the
one or more configuration parameters are being changed by the CCO function comprises:
testing a semaphore to determine whether the semaphore is in a locked state; and setting the semaphore to the locked state when it is determined that the semaphore is not in the locked state.
13. An apparatus (400) to be employed as an evolved nodeB (eNB) (12), the apparatus
comprising:
a processor (404) operably coupled with a memory (408, 410, 412), wherein the processor is to operate one or more self-organizing network (SON) functions including a capacity and coverage optimization (CCO) function, wherein each SON function of the one or more SON functions comprises SON coordination functionality to coordinate configuration parameter changes among the one or more SON functions, wherein, to operate the SON coordination functionality of the CCO function, the processor is to execute instructions to:

13

INTL-427-IN

detect an event that triggers the eNB to perform a CCO procedure for a cell (14) provided by the eNB, determine whether one or more configuration parameters are currently being changed for the eNB by a SON function of the one or more SON functions that is different than the CCO function in response to the detection, and
instruct the eNB to initiate performance of the CCO procedure based on a determination that the one or more configuration parameters are not currently being changed by the SON function that is different than the CCO function.
14. The apparatus of claim 13, wherein the processor is to execute the instructions to instruct the eNB to not initiate performance of the CCO procedure based on a determination that the one or more configuration parameters are currently being changed.
15. The apparatus of claim 13, wherein the processor is to execute the instructions to instruct the eNB to adjust configuration parameter of the one or more configuration parameters.
16. The apparatus of claim 14, wherein the SON function other than the CCO function is an energy savings management (ESM) function among the one or more SON functions.
17. The apparatus of claim 13, wherein the one or more configuration parameters include one or more of a downlink transmission power, an antenna tilt, or an antenna azimuth.

Documents

Orders

Section Controller Decision Date

Application Documents

# Name Date
1 3190-CHENP-2014-RELEVANT DOCUMENTS [20-09-2023(online)].pdf 2023-09-20
1 3190-CHENP-2014.pdf 2014-04-28
2 3190-CHENP-2014-IntimationOfGrant27-10-2021.pdf 2021-10-27
2 IPO drawing INTL-427-IN.pdf 2014-04-29
3 FORM 2 for efiling INTL-427-IN.pdf 2014-04-29
3 3190-CHENP-2014-PatentCertificate27-10-2021.pdf 2021-10-27
4 3190-CHENP-2014-Written submissions and relevant documents [26-10-2021(online)].pdf 2021-10-26
4 3190-CHENP-2014 FORM-13 23-05-2014.pdf 2014-05-23
5 Marked up claims INTL-427-IN.pdf 2014-05-26
5 3190-CHENP-2014-US(14)-HearingNotice-(HearingDate-11-10-2021).pdf 2021-10-17
6 Cover letter and Observation INTL-427-IN.pdf 2014-05-26
6 3190-CHENP-2014-Correspondence to notify the Controller [20-09-2021(online)].pdf 2021-09-20
7 Amended claims INTL-427-IN.pdf 2014-05-26
7 3190-CHENP-2014-FORM 3 [20-10-2020(online)].pdf 2020-10-20
8 abstract3190-CHENP-2014.jpg 2014-11-18
8 3190-CHENP-2014-8(i)-Substitution-Change Of Applicant - Form 6 [19-10-2020(online)].pdf 2020-10-19
9 3190-CHENP-2014-ASSIGNMENT DOCUMENTS [19-10-2020(online)].pdf 2020-10-19
9 Other Document [08-08-2016(online)].pdf 2016-08-08
10 3190-CHENP-2014-FORM 13 [19-10-2020(online)].pdf 2020-10-19
10 Marked Copy [08-08-2016(online)].pdf 2016-08-08
11 3190-CHENP-2014-PA [19-10-2020(online)].pdf 2020-10-19
11 Form 13 [08-08-2016(online)].pdf 2016-08-08
12 3190-CHENP-2014-RELEVANT DOCUMENTS [19-10-2020(online)].pdf 2020-10-19
12 Description(Complete) [08-08-2016(online)].pdf_167.pdf 2016-08-08
13 Correspondence by Agent_Form 5_16-09-2019.pdf 2019-09-16
13 Description(Complete) [08-08-2016(online)].pdf 2016-08-08
14 3190-CHENP-2014-ABSTRACT [11-09-2019(online)].pdf 2019-09-11
14 Form 3 [28-02-2017(online)].pdf 2017-02-28
15 3190-CHENP-2014-CLAIMS [11-09-2019(online)].pdf 2019-09-11
15 3190-CHENP-2014-FORM 3 [05-12-2017(online)].pdf 2017-12-05
16 3190-CHENP-2014-FER_SER_REPLY [11-09-2019(online)].pdf 2019-09-11
16 3190-CHENP-2014-FORM 3 [12-11-2018(online)].pdf 2018-11-12
17 3190-CHENP-2014-OTHERS [11-09-2019(online)].pdf 2019-09-11
17 3190-CHENP-2014-FER.pdf 2019-03-11
18 3190-CHENP-2014-PETITION UNDER RULE 137 [11-09-2019(online)].pdf 2019-09-11
18 3190-CHENP-2014-Response to office action (Mandatory) [09-09-2019(online)].pdf 2019-09-09
19 3190-CHENP-2014-FORM 3 [09-09-2019(online)].pdf 2019-09-09
19 3190-CHENP-2014-Information under section 8(2) (MANDATORY) [10-09-2019(online)].pdf 2019-09-10
20 3190-CHENP-2014-FORM 3 [09-09-2019(online)].pdf 2019-09-09
20 3190-CHENP-2014-Information under section 8(2) (MANDATORY) [10-09-2019(online)].pdf 2019-09-10
21 3190-CHENP-2014-PETITION UNDER RULE 137 [11-09-2019(online)].pdf 2019-09-11
21 3190-CHENP-2014-Response to office action (Mandatory) [09-09-2019(online)].pdf 2019-09-09
22 3190-CHENP-2014-FER.pdf 2019-03-11
22 3190-CHENP-2014-OTHERS [11-09-2019(online)].pdf 2019-09-11
23 3190-CHENP-2014-FER_SER_REPLY [11-09-2019(online)].pdf 2019-09-11
23 3190-CHENP-2014-FORM 3 [12-11-2018(online)].pdf 2018-11-12
24 3190-CHENP-2014-FORM 3 [05-12-2017(online)].pdf 2017-12-05
24 3190-CHENP-2014-CLAIMS [11-09-2019(online)].pdf 2019-09-11
25 3190-CHENP-2014-ABSTRACT [11-09-2019(online)].pdf 2019-09-11
25 Form 3 [28-02-2017(online)].pdf 2017-02-28
26 Correspondence by Agent_Form 5_16-09-2019.pdf 2019-09-16
26 Description(Complete) [08-08-2016(online)].pdf 2016-08-08
27 3190-CHENP-2014-RELEVANT DOCUMENTS [19-10-2020(online)].pdf 2020-10-19
27 Description(Complete) [08-08-2016(online)].pdf_167.pdf 2016-08-08
28 3190-CHENP-2014-PA [19-10-2020(online)].pdf 2020-10-19
28 Form 13 [08-08-2016(online)].pdf 2016-08-08
29 3190-CHENP-2014-FORM 13 [19-10-2020(online)].pdf 2020-10-19
29 Marked Copy [08-08-2016(online)].pdf 2016-08-08
30 3190-CHENP-2014-ASSIGNMENT DOCUMENTS [19-10-2020(online)].pdf 2020-10-19
30 Other Document [08-08-2016(online)].pdf 2016-08-08
31 abstract3190-CHENP-2014.jpg 2014-11-18
31 3190-CHENP-2014-8(i)-Substitution-Change Of Applicant - Form 6 [19-10-2020(online)].pdf 2020-10-19
32 Amended claims INTL-427-IN.pdf 2014-05-26
32 3190-CHENP-2014-FORM 3 [20-10-2020(online)].pdf 2020-10-20
33 Cover letter and Observation INTL-427-IN.pdf 2014-05-26
33 3190-CHENP-2014-Correspondence to notify the Controller [20-09-2021(online)].pdf 2021-09-20
34 Marked up claims INTL-427-IN.pdf 2014-05-26
34 3190-CHENP-2014-US(14)-HearingNotice-(HearingDate-11-10-2021).pdf 2021-10-17
35 3190-CHENP-2014-Written submissions and relevant documents [26-10-2021(online)].pdf 2021-10-26
35 3190-CHENP-2014 FORM-13 23-05-2014.pdf 2014-05-23
36 FORM 2 for efiling INTL-427-IN.pdf 2014-04-29
36 3190-CHENP-2014-PatentCertificate27-10-2021.pdf 2021-10-27
37 3190-CHENP-2014-IntimationOfGrant27-10-2021.pdf 2021-10-27
37 IPO drawing INTL-427-IN.pdf 2014-04-29
38 3190-CHENP-2014-RELEVANT DOCUMENTS [20-09-2023(online)].pdf 2023-09-20
38 3190-CHENP-2014.pdf 2014-04-28

Search Strategy

1 3190chenp2014searchstd_11-03-2019.pdf

ERegister / Renewals

3rd: 17 Jan 2022

From 20/03/2014 - To 20/03/2015

4th: 17 Jan 2022

From 20/03/2015 - To 20/03/2016

5th: 17 Jan 2022

From 20/03/2016 - To 20/03/2017

6th: 17 Jan 2022

From 20/03/2017 - To 20/03/2018

7th: 17 Jan 2022

From 20/03/2018 - To 20/03/2019

8th: 17 Jan 2022

From 20/03/2019 - To 20/03/2020

9th: 17 Jan 2022

From 20/03/2020 - To 20/03/2021

10th: 17 Jan 2022

From 20/03/2021 - To 20/03/2022

11th: 17 Jan 2022

From 20/03/2022 - To 20/03/2023

12th: 31 Jan 2023

From 20/03/2023 - To 20/03/2024

13th: 18 Jan 2024

From 20/03/2024 - To 20/03/2025

14th: 31 Jan 2025

From 20/03/2025 - To 20/03/2026