Sign In to Follow Application
View All Documents & Correspondence

Dc Power Supply Device And Refrigeration Cycle Device

Abstract: A DC power supply device (10) for converting an alternating current from a three phase alternating current power supply (1) to a direct current and supplying the same to a load (11) and capable of suppressing an excessive rush current and preventing element damage and circuit burnout is equipped with: a rectifying circuit (2) for rectifying the alternating current from the three phase alternating current power supply (1) and having a reactor (3) connected to the input side or output side thereof; a first capacitor (6a) and a second capacitor (6b) connected in series between the output terminals to the load (11); a charging means (charging unit (7)) for selectively charging the first capacitor (6a) and/or the second capacitor (6b); and a control unit (8) for controlling the charging unit (7). Therein when the charging of the first capacitor (6a) and the second capacitor (6b) starts the control unit (8) decreases the on duty so as to suppress the charging peak current to the first capacitor (6a) and to the second capacitor (6b) to a level at or below the allowable value of the charging unit (7) or rectifying circuit (2) and thereafter gradually increases the on duty after allowing a pre set interval to elapse before reaching the normal on duty.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
13 May 2016
Publication Number
32/2016
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
patent@depenning.com
Parent Application
Patent Number
Legal Status
Grant Date
2022-06-30
Renewal Date

Applicants

MITSUBISHI ELECTRIC CORPORATION
7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310

Inventors

1. KAMIYA Shota
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
2. HATAKEYAMA Kazunori
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
3. ITO Norikazu
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
4. YUASA Kenta
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
5. ISODA Shoji
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310

Specification

Documents

Application Documents

# Name Date
1 Power of Attorney [13-05-2016(online)].pdf 2016-05-13
2 Form 5 [13-05-2016(online)].pdf 2016-05-13
3 Form 3 [13-05-2016(online)].pdf 2016-05-13
4 Form 18 [13-05-2016(online)].pdf 2016-05-13
5 Form 1 [13-05-2016(online)].pdf 2016-05-13
6 Drawing [13-05-2016(online)].pdf 2016-05-13
7 Description(Complete) [13-05-2016(online)].pdf 2016-05-13
8 Other Document [07-06-2016(online)].pdf 2016-06-07
9 Marked Copy [07-06-2016(online)].pdf 2016-06-07
10 Form 13 [07-06-2016(online)].pdf 2016-06-07
11 Description(Complete) [07-06-2016(online)].pdf 2016-06-07
12 201647016699.pdf 2016-06-08
13 201647016699-Form 1-200516.pdf 2016-07-21
14 201647016699-Correspondence-F1-200516.pdf 2016-07-21
15 Form 3 [08-11-2016(online)].pdf 2016-11-08
16 201647016699-FORM 3 [06-12-2018(online)].pdf 2018-12-06
17 201647016699-FORM 3 [07-12-2018(online)].pdf 2018-12-07
18 201647016699-FER.pdf 2019-01-30
19 201647016699-OTHERS [29-07-2019(online)].pdf 2019-07-29
20 201647016699-FORM 3 [29-07-2019(online)].pdf 2019-07-29
21 201647016699-FER_SER_REPLY [29-07-2019(online)].pdf 2019-07-29
22 201647016699-DRAWING [29-07-2019(online)].pdf 2019-07-29
23 201647016699-COMPLETE SPECIFICATION [29-07-2019(online)].pdf 2019-07-29
24 201647016699-CLAIMS [29-07-2019(online)].pdf 2019-07-29
25 201647016699-ABSTRACT [29-07-2019(online)].pdf 2019-07-29
26 201647016699-FORM 3 [26-10-2021(online)].pdf 2021-10-26
27 201647016699-PatentCertificate30-06-2022.pdf 2022-06-30
28 201647016699-IntimationOfGrant30-06-2022.pdf 2022-06-30

Search Strategy

1 searchstrat_30-11-2018.pdf

ERegister / Renewals

3rd: 13 Jul 2022

From 29/10/2015 - To 29/10/2016

4th: 13 Jul 2022

From 29/10/2016 - To 29/10/2017

5th: 13 Jul 2022

From 29/10/2017 - To 29/10/2018

6th: 13 Jul 2022

From 29/10/2018 - To 29/10/2019

7th: 13 Jul 2022

From 29/10/2019 - To 29/10/2020

8th: 13 Jul 2022

From 29/10/2020 - To 29/10/2021

9th: 13 Jul 2022

From 29/10/2021 - To 29/10/2022

10th: 13 Jul 2022

From 29/10/2022 - To 29/10/2023

11th: 12 Sep 2023

From 29/10/2023 - To 29/10/2024