Sign In to Follow Application
View All Documents & Correspondence

Determining Optimal Decision Parameters For A Demand Response Event Involving A District Cooling Plant

Abstract: The present disclosure provides system and method for determining optimal decision parameters for a demand response (DR) event involving a District Cooling Plant (DCP). Most of conventional DR event techniques address control of building-level energy consumption loads alone while in presence of District Cooling (DC) has not received much attention when a plurality of buildings are served by a District Cooling Plant (DCP). The disclosed system and method determine set points of optimal decision parameters of the plurality of buildings and the DCP, by conditioning and un-conditioning on the DCP parameters such that a thermal discomfort of occupants residing in the plurality of buildings is minimum and achieves a maximum target energy demand reduction during the DR event. The disclosed system and method work for hundreds of buildings and able to determine the optimal decision parameters for each building and the DCP efficiently.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
18 February 2019
Publication Number
34/2020
Publication Type
INA
Invention Field
COMPUTER SCIENCE
Status
Email
ip@legasis.in
Parent Application
Patent Number
Legal Status
Grant Date
2024-09-13
Renewal Date

Applicants

Tata Consultancy Services Limited
Nirmal Building, 9th Floor, Nariman Point, Mumbai - 400021, Maharashtra, India

Inventors

1. NAGARATHINAM, Srinarayana
Tata Consultancy Services Limited, IIT-Madras Research Park, Block A, Second Floor, Phase - 2, Kanagam Road, Taramani, Chennai - 600113, Tamil Nadu, India
2. MURALIDHARAN, Harihara Subramaniam
Tata Consultancy Services Limited, IIT-Madras Research Park, Block A, Second Floor, Phase - 2, Kanagam Road, Taramani, Chennai - 600113, Tamil Nadu, India
3. VASAN, Arunchandar
Tata Consultancy Services Limited, IIT-Madras Research Park, Block A, Second Floor, Phase - 2, Kanagam Road, Taramani, Chennai - 600113, Tamil Nadu, India
4. SARANGAN, Venkatesh
Tata Consultancy Services Limited, IIT-Madras Research Park, Block A, Second Floor, Phase - 2, Kanagam Road, Taramani, Chennai - 600113, Tamil Nadu, India
5. SIVASUBRAMANIAM, Anand
Tata Consultancy Services Limited, IIT-Madras Research Park, Block A, Second Floor, Phase - 2, Kanagam Road, Taramani, Chennai - 600113, Tamil Nadu, India

Specification

Claims: A processor implemented method (300) for determining optimal decision parameters for a Demand Response (DR) event involving a District Cooling Plant (DCP) serving at least some of a plurality of buildings, wherein the DCP and each of the at least some of the plurality of buildings are configured to participate with an associated electrical utility from a plurality of electrical utilities in the DR event, wherein each of the at least some of the plurality of buildings and the DCP comprises one or more power consuming units, the method (300) comprising the steps of : receiving input parameters from the associated electrical utility, by one or more hardware processors, wherein the input parameters comprise a time interval of the DR event, a total target energy reduction value (R_T) to be achieved after the DR event, an initial supply chilled water temperature value (T_s) of the DCP from a predefined range and an initial demand energy reduction value (R_D^((n) )) of the DCP, wherein an initial value of n is zero and the time interval of the DR event comprises a start time (t) and an end time (t+T) where T is a total time duration of the DR event (302); determining an energy reduction vector (R) comprising an energy reduction value (R_x) for each building (x) of the at least some of the plurality of buildings such that (i) a total thermal discomfort value (?_B¦G_x ) of occupants thereof is minimum, by the one or more hardware processors, wherein the total thermal discomfort value (?_B¦G_x ) of occupants is a sum of a thermal discomfort value (G_x ) of occupants for each building (x) of the at least some of the plurality of buildings and (ii) a sum of energy reduction value (?_B¦R_x ) thereof and the initial demand energy reduction value (R_D^((n) )) of the DCP is greater than or equal to the total target energy reduction value (R_T) (304); identifying, by the one or more hardware processors, a temperature set point (T_SP) and a lighting intensity factor (L_(f )) for each building (x) of the at least some of the plurality of buildings based on an associated energy reduction value (R_x) using a look-up table and by using an inverse mapping technique (306); extracting, by the one or more hardware processors, a cooling load (Q_x (t)) for each building (x) of the at least some of the plurality of buildings and a chilled water mass flow rate? (m?_x (t)) thereof based on an associated temperature set point (T_SP) and an associated lighting intensity factor (L_(f )), using a British Thermal Units (BTU) meter installed in a corresponding building (308); calculating, by the one or more hardware processors, a cooling load ?(Q?_D (t)) of the DCP and a chilled water mass flowrate ?(m?_D (t)) of the DCP by summing cooling loads and chilled water mass flow rates of each building (x) of the at least some of the plurality of buildings respectively (310); estimating, by the one or more hardware processors, an intermediate energy reduction value ( R_D^((*)) ) of the DCP based on the cooling load ?(Q?_D (t)) of the DCP and the chilled water mass flowrate ?(m?_D (t)) of the DCP using a chiller performance curve and a pump performance curve of the DCP (312); determining, by the one or more hardware processors, a new demand energy reduction value ( R_D^((n+1)) ) of the DCP based on the initial demand energy reduction value (R_D^((n) )), the intermediate energy reduction value ( R_D^((*)) ) and a relaxation parameter ß (314); iteratively performing, by the one or more hardware processors, steps (a) through (g) by taking the new demand energy reduction value ( R_D^((n+1)) ) of the DCP as the initial demand energy reduction value (R_D^((n))) of the DCP until a condition ?|R?_D^((n+1))-R_D^((n) ) |

Documents

Orders

Section Controller Decision Date

Application Documents

# Name Date
1 201921006308-IntimationOfGrant13-09-2024.pdf 2024-09-13
1 201921006308-STATEMENT OF UNDERTAKING (FORM 3) [18-02-2019(online)].pdf 2019-02-18
2 201921006308-PatentCertificate13-09-2024.pdf 2024-09-13
2 201921006308-REQUEST FOR EXAMINATION (FORM-18) [18-02-2019(online)].pdf 2019-02-18
3 201921006308-FORM 1 [18-02-2019(online)].pdf 2019-02-18
3 201921006308-Covering Letter [15-03-2024(online)].pdf 2024-03-15
4 201921006308-PETITION u-r 6(6) [15-03-2024(online)].pdf 2024-03-15
4 201921006308-FIGURE OF ABSTRACT [18-02-2019(online)].jpg 2019-02-18
5 201921006308-Written submissions and relevant documents [15-03-2024(online)].pdf 2024-03-15
5 201921006308-DRAWINGS [18-02-2019(online)].pdf 2019-02-18
6 201921006308-US(14)-ExtendedHearingNotice-(HearingDate-01-03-2024).pdf 2024-02-28
6 201921006308-COMPLETE SPECIFICATION [18-02-2019(online)].pdf 2019-02-18
7 201921006308-Proof of Right (MANDATORY) [20-03-2019(online)].pdf 2019-03-20
7 201921006308-Correspondence to notify the Controller [26-02-2024(online)].pdf 2024-02-26
8 201921006308-FORM-26 [26-02-2024(online)].pdf 2024-02-26
8 201921006308-FORM-26 [04-04-2019(online)].pdf 2019-04-04
9 201921006308-US(14)-ExtendedHearingNotice-(HearingDate-27-02-2024).pdf 2024-02-02
9 Abstract1.jpg 2019-05-20
10 201921006308-ORIGINAL UR 6(1A) FORM 1-290319.pdf 2019-11-04
10 201921006308-US(14)-HearingNotice-(HearingDate-14-02-2024).pdf 2024-01-16
11 201921006308-CLAIMS [29-11-2021(online)].pdf 2021-11-29
11 201921006308-ORIGINAL UR 6(1A) FORM 26-120419.pdf 2020-01-04
12 201921006308-COMPLETE SPECIFICATION [29-11-2021(online)].pdf 2021-11-29
12 201921006308-Request Letter-Correspondence [11-08-2020(online)].pdf 2020-08-11
13 201921006308-FER_SER_REPLY [29-11-2021(online)].pdf 2021-11-29
13 201921006308-Power of Attorney [11-08-2020(online)].pdf 2020-08-11
14 201921006308-Form 1 (Submitted on date of filing) [11-08-2020(online)].pdf 2020-08-11
14 201921006308-OTHERS [29-11-2021(online)].pdf 2021-11-29
15 201921006308-CERTIFIED COPIES TRANSMISSION TO IB [11-08-2020(online)].pdf 2020-08-11
15 201921006308-FER.pdf 2021-10-19
16 201921006308-FORM 3 [17-09-2020(online)].pdf 2020-09-17
17 201921006308-FER.pdf 2021-10-19
17 201921006308-CERTIFIED COPIES TRANSMISSION TO IB [11-08-2020(online)].pdf 2020-08-11
18 201921006308-OTHERS [29-11-2021(online)].pdf 2021-11-29
18 201921006308-Form 1 (Submitted on date of filing) [11-08-2020(online)].pdf 2020-08-11
19 201921006308-FER_SER_REPLY [29-11-2021(online)].pdf 2021-11-29
19 201921006308-Power of Attorney [11-08-2020(online)].pdf 2020-08-11
20 201921006308-COMPLETE SPECIFICATION [29-11-2021(online)].pdf 2021-11-29
20 201921006308-Request Letter-Correspondence [11-08-2020(online)].pdf 2020-08-11
21 201921006308-CLAIMS [29-11-2021(online)].pdf 2021-11-29
21 201921006308-ORIGINAL UR 6(1A) FORM 26-120419.pdf 2020-01-04
22 201921006308-ORIGINAL UR 6(1A) FORM 1-290319.pdf 2019-11-04
22 201921006308-US(14)-HearingNotice-(HearingDate-14-02-2024).pdf 2024-01-16
23 201921006308-US(14)-ExtendedHearingNotice-(HearingDate-27-02-2024).pdf 2024-02-02
23 Abstract1.jpg 2019-05-20
24 201921006308-FORM-26 [26-02-2024(online)].pdf 2024-02-26
24 201921006308-FORM-26 [04-04-2019(online)].pdf 2019-04-04
25 201921006308-Proof of Right (MANDATORY) [20-03-2019(online)].pdf 2019-03-20
25 201921006308-Correspondence to notify the Controller [26-02-2024(online)].pdf 2024-02-26
26 201921006308-US(14)-ExtendedHearingNotice-(HearingDate-01-03-2024).pdf 2024-02-28
26 201921006308-COMPLETE SPECIFICATION [18-02-2019(online)].pdf 2019-02-18
27 201921006308-Written submissions and relevant documents [15-03-2024(online)].pdf 2024-03-15
27 201921006308-DRAWINGS [18-02-2019(online)].pdf 2019-02-18
28 201921006308-PETITION u-r 6(6) [15-03-2024(online)].pdf 2024-03-15
28 201921006308-FIGURE OF ABSTRACT [18-02-2019(online)].jpg 2019-02-18
29 201921006308-FORM 1 [18-02-2019(online)].pdf 2019-02-18
29 201921006308-Covering Letter [15-03-2024(online)].pdf 2024-03-15
30 201921006308-REQUEST FOR EXAMINATION (FORM-18) [18-02-2019(online)].pdf 2019-02-18
30 201921006308-PatentCertificate13-09-2024.pdf 2024-09-13
31 201921006308-IntimationOfGrant13-09-2024.pdf 2024-09-13
31 201921006308-STATEMENT OF UNDERTAKING (FORM 3) [18-02-2019(online)].pdf 2019-02-18

Search Strategy

1 2020-12-2812-17-45E_28-12-2020.pdf

ERegister / Renewals

3rd: 13 Dec 2024

From 18/02/2021 - To 18/02/2022

4th: 13 Dec 2024

From 18/02/2022 - To 18/02/2023

5th: 13 Dec 2024

From 18/02/2023 - To 18/02/2024

6th: 13 Dec 2024

From 18/02/2024 - To 18/02/2025

7th: 13 Dec 2024

From 18/02/2025 - To 18/02/2026