Sign In to Follow Application
View All Documents & Correspondence

"Determining Reactive Power Capability Of A Renewable Energy System"

Abstract: Systems and methods for controlling a renewable energy system based on actual reactive power capability of the renewable energy system are provided. The reactive power output of the renewable energy system can be controlled based at least in part on an initial reactive power limit. The initial reactive power limit can be determined based on rated reactive power for the power generation units in the renewable energy system. When a difference between a reactive power demand and the actual reactive power production of the renewable energy system fall outside a threshold, the initial reactive power limit can be adjusted to a corrected reactive power limit that is closer to the actual reactive power capability of the renewable energy system. FIG. 1

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
04 February 2016
Publication Number
34/2016
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
ipo@knspartners.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-09-18
Renewal Date

Applicants

GENERAL ELECTRIC COMPANY
1 River Road Schenectady, New York 12345 USA

Inventors

1. UBBEN, Enno
Holsterfeld 16 Salzbergen, 48499 DE
2. BARTON, Werner Gerhard
Holsterfeld 16 Salzbergen, NI 48499 DE
3. JUNGE, Carsten
Holsterfeld 16 Salzbergen, Niedersachsen 48499 DE
4. SMOLENSKI, Arnim
Holsterfeld 16 Salzbergen, Niedersachsen 48499 DE

Specification

SOFT COPY ATTACHED IN PDF

Documents

Application Documents

# Name Date
1 Power of Attorney [04-02-2016(online)].pdf 2016-02-04
2 Form 5 [04-02-2016(online)].pdf 2016-02-04
3 Form 3 [04-02-2016(online)].pdf 2016-02-04
4 Drawing [04-02-2016(online)].pdf 2016-02-04
5 Description(Complete) [04-02-2016(online)].pdf 2016-02-04
6 201644003932-Power of Attorney-050716.pdf 2016-07-28
7 201644003932-Correspondence-ASSIGNMENT-PA-050716.pdf 2016-07-28
8 201644003932-ASSIGNMENT-050716.pdf 2016-07-28
9 abstract 201644003932.jpg 2016-08-11
10 201644003932-FORM 18 [30-01-2019(online)].pdf 2019-01-30
11 201644003932-RELEVANT DOCUMENTS [31-10-2019(online)].pdf 2019-10-31
12 201644003932-FORM-26 [31-10-2019(online)].pdf 2019-10-31
13 201644003932-FORM 13 [31-10-2019(online)].pdf 2019-10-31
14 201644003932-FER.pdf 2020-06-05
15 201644003932-Verified English translation [30-08-2020(online)].pdf 2020-08-30
16 201644003932-Information under section 8(2) [30-08-2020(online)].pdf 2020-08-30
17 201644003932-FORM-26 [30-08-2020(online)].pdf 2020-08-30
18 201644003932-FORM 3 [30-08-2020(online)].pdf 2020-08-30
19 201644003932-PETITION UNDER RULE 137 [08-10-2020(online)].pdf 2020-10-08
20 201644003932-OTHERS [09-10-2020(online)].pdf 2020-10-09
21 201644003932-FER_SER_REPLY [09-10-2020(online)].pdf 2020-10-09
22 201644003932-DRAWING [09-10-2020(online)].pdf 2020-10-09
23 201644003932-CLAIMS [09-10-2020(online)].pdf 2020-10-09
24 201644003932-ABSTRACT [09-10-2020(online)].pdf 2020-10-09
25 201644003932-Response to office action [19-07-2022(online)].pdf 2022-07-19
26 201644003932-PatentCertificate18-09-2023.pdf 2023-09-18
27 201644003932-IntimationOfGrant18-09-2023.pdf 2023-09-18
28 201644003932-POWER OF AUTHORITY [28-02-2024(online)].pdf 2024-02-28
29 201644003932-FORM-16 [28-02-2024(online)].pdf 2024-02-28
30 201644003932-ASSIGNMENT WITH VERIFIED COPY [28-02-2024(online)].pdf 2024-02-28

Search Strategy

1 2020-03-1712-35-52E_17-03-2020.pdf

ERegister / Renewals

3rd: 20 Nov 2023

From 04/02/2018 - To 04/02/2019

4th: 20 Nov 2023

From 04/02/2019 - To 04/02/2020

5th: 20 Nov 2023

From 04/02/2020 - To 04/02/2021

6th: 20 Nov 2023

From 04/02/2021 - To 04/02/2022

7th: 20 Nov 2023

From 04/02/2022 - To 04/02/2023

8th: 20 Nov 2023

From 04/02/2023 - To 04/02/2024

9th: 20 Nov 2023

From 04/02/2024 - To 04/02/2025

10th: 20 Nov 2023

From 04/02/2025 - To 04/02/2026