Sign In to Follow Application
View All Documents & Correspondence

Development Of Manufacturing Process For High Alumina Insulators Round For Igbt Traction Converter

Abstract: The present invention relates to high alumina ceramic Insulator manufacturing process for Insulator round for IGBT (Insulated Gate Bipolar Transistors) traction converter in Locomotive and relative fields. Alumina ceramic where Al2O3 content is more than 90 percent and remaining of other special additives. The raw material was processed with special technique using Iso-pressing method or by uniaxial die pressing method at moderate pressure/ high pressure to achieve compaction. Pressed cylinder/ bisque fired cylinder was machined with distinct technique to achieve dimensions as per drawing, the machined piece was sintered and special glazed was coated on outer surface. Metal parts were assembled with help of special additive at the both side of the product. After that assembled products had to pass through test of visual inspection, dielectric test, tensile test, compression test, tightening torque test successfully. The product structure is found compacted, with high insulation resistance, breakdown, high temperature resistance, abrasion resistance, high strength.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
20 March 2018
Publication Number
39/2019
Publication Type
INA
Invention Field
CHEMICAL
Status
Email
lsdavar@vsnl.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-12-12
Renewal Date

Applicants

BHARAT HEAVY ELECTRICALS LIMITED
With one its Regional Offices at REGIONAL OPERATIONS DIVISION (ROD), PLOT NO: 9/1, DJ BLOCK 3rd FLOOR, KARUNAMOYEE, SALTLAKE, KOLKATA- 700091, having its Registered Office at BHEL HOUSE, SIRI FORT, NEW DELHI 110049, INDIA

Inventors

1. ANTARA BARAL
BHARAT HEAVY ELECTRICALS LIMITED, CORPORATE R&D, CTI BHEL MALLESWARAM COMPLEX, BANGALORE 560012, KARNATAKA, India
2. K S RAVISHANKAR
BHARAT HEAVY ELECTRICALS LIMITED, CORPORATE R&D, CTI BHEL MALLESWARAM COMPLEX, BANGALORE 560012, KARNATAKA, India
3. RAVI MULLUR
BHARAT HEAVY ELECTRICALS LIMITED, CORPORATE R&D, CTI BHEL MALLESWARAM COMPLEX, BANGALORE 560012, KARNATAKA, India
4. SADANAND ACHARI
BHARAT HEAVY ELECTRICALS LIMITED, CORPORATE R&D, CTI BHEL MALLESWARAM COMPLEX, BANGALORE 560012, KARNATAKA, India
5. M MOHANA
BHARAT HEAVY ELECTRICALS LIMITED, CORPORATE R&D, CTI BHEL MALLESWARAM COMPLEX, BANGALORE 560012, KARNATAKA, India

Specification

DESC:Please find the attached file ,CLAIMS:Please find the attached file

Documents

Application Documents

# Name Date
1 201831010129-STATEMENT OF UNDERTAKING (FORM 3) [20-03-2018(online)].pdf 2018-03-20
2 201831010129-PROVISIONAL SPECIFICATION [20-03-2018(online)].pdf 2018-03-20
3 201831010129-POWER OF AUTHORITY [20-03-2018(online)].pdf 2018-03-20
4 201831010129-FORM 1 [20-03-2018(online)].pdf 2018-03-20
5 201831010129-Proof of Right (MANDATORY) [23-03-2018(online)].pdf 2018-03-23
6 201831010129-CORRESPONDENCE-OTHERS [19-03-2019(online)].pdf 2019-03-19
7 201831010129-COMPLETE SPECIFICATION [19-03-2019(online)].pdf 2019-03-19
8 201831010129-FORM 18 [25-04-2019(online)].pdf 2019-04-25
9 201831010129-OTHERS [20-09-2021(online)].pdf 2021-09-20
10 201831010129-FER_SER_REPLY [20-09-2021(online)].pdf 2021-09-20
11 201831010129-CLAIMS [20-09-2021(online)].pdf 2021-09-20
12 201831010129-ABSTRACT [20-09-2021(online)].pdf 2021-09-20
13 201831010129-FER.pdf 2021-10-18
14 201831010129-PatentCertificate12-12-2023.pdf 2023-12-12
15 201831010129-FORM 4 [28-03-2024(online)].pdf 2024-03-28

Search Strategy

1 SearchStrategyA-162DE_17-03-2021.pdf

ERegister / Renewals

3rd: 29 Mar 2024

From 20/03/2020 - To 20/03/2021

4th: 29 Mar 2024

From 20/03/2021 - To 20/03/2022

5th: 29 Mar 2024

From 20/03/2022 - To 20/03/2023

6th: 29 Mar 2024

From 20/03/2023 - To 20/03/2024

7th: 29 Mar 2024

From 20/03/2024 - To 20/03/2025

8th: 20 Mar 2025

From 20/03/2025 - To 20/03/2026