Double Unit Bio Gas Plant

Abstract: A Double Unit Biogas Plant configured to be installed in domestic and commercial sites incorporating a doube unit technology - one accommodating the bio digester and the other with gas holder that consists of two containers, an inner chamber and an outer chamber. It contains a gas purification mechanism applying absorption method to minimize contamination of gas by impurities, HYDROGEN SULPHIDE (H2S) AND CARBON- DIOXIDE (C02). The unit is manufactured with LLDP (Liner Low Density Polyethelene) and the production can be mechanized reducing the cost and efficiency without compromising on quality and strength. The narrowing of gap between chambers prevents moisture being gathered thus eliminating mosquito breeding and spread of odor. The outer chamber is filled with water and the inner chamber is kept immersed in the outer one. A valve with double side hose holder is used to pass the gas from digester to the unit with the pipe extending to the outer chamber in a way to keep end of the pipe constantly dipped in the water. Another valve connects the inner chamber to the stove enabling the purified gas to reach the stove. Letting the produced gas pass through and the contaminants absorbed by the water ensures purity of gas reaching the stove avoiding blocking of the nozzles. This quality acts against blocks in transportation of gas among components and corrosion of parts. FIG.6

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
05 August 2021
Publication Number
37/2021
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
Parent Application

Applicants

MISSION E3 ENVIRONMENTAL TECHNOLOGIES PVT LTD
KONNOLA TOWER, DOWN HILL, MALAPPURAM, KERALA, INDIA - 676519.

Inventors

1. MISSION E3 ENVIRONMENTAL TECHNOLOGIES PVT LTD
KONNOLA TOWER, DOWN HILL, MALAPPURAM, KERALA, INDIA - 676519.

Specification

I CLAIM
1. A new biogas plant designed to resolve all problems cited so far related to biogas that hinders the spread of the otherwise best solution for home bio-waste management, with features listed against specific claims.
2. A biogas plant with the double unit design that provide for space and mechanism to purify the gas emanated from the digester using absorption technique thus minimizing impurities, C20 and H2S, avoiding clogging and corrosion.
3. A biogas plant with design that eliminates the erstwhile troubling problem of mosquito breeding and spread of bad odor in biogas plants for ever.
4. A biogas plant manufactured with LDPE material instead of FRP enabling mechanized production instead of manual work, making the units affordable and flexible to design the components in a way to make it problem free and convenient for daily use.
5. A biogas plant that provides a permanent and practical solution for bio waste management at homes and commercial outlets

Documents

Application Documents

# Name Date
1 202141035259-Form-5_As Filed_05-08-2021.pdf 2021-08-05
2 202141035259-Form-3_As Filed_05-08-2021.pdf 2021-08-05
3 202141035259-Form-28_Small Entity_As Filed_05-08-2021.pdf 2021-08-05
4 202141035259-Form-1_As Filed_05-08-2021.pdf 2021-08-05
5 202141035259-Form 2(Title Page)Provisional_05-08-2021.pdf 2021-08-05
6 202141035259-Description Provisional_As Filed_05-08-2021.pdf 2021-08-05
7 202141035259-Correspondence_As Filed_05-08-2021.pdf 2021-08-05
8 202141035259-Form9_Early Publication_06-09-2021.pdf 2021-09-06
9 202141035259-Form5_Complete After Provisional_06-09-2021.pdf 2021-09-06
10 202141035259-Form3_Complete After Provisional_06-09-2021.pdf 2021-09-06
11 202141035259-Form2 Title Page_Complete_06-09-2021.pdf 2021-09-06
12 202141035259-Form1_Complete After Provisional_06-09-2021.pdf 2021-09-06
13 202141035259-Form18_Examination Request_06-09-2021.pdf 2021-09-06
14 202141035259-Drawing_Complete After Provisional_06-09-2021.pdf 2021-09-06
15 202141035259-Description Complete_Complete After Provisional_06-09-2021.pdf 2021-09-06
16 202141035259-Claims_Complete After Provisional_06-09-2021.pdf 2021-09-06
17 202141035259-Abstract_Complete After Provisional_06-09-2021.pdf 2021-09-06
18 202141035259-FER.pdf 2022-05-11

Search Strategy

1 SEARCHSTRATEGYE_09-05-2022.pdf
2 SCREENSHOTE_09-05-2022.pdf