Abstract: An apparatus and system for edge server deployment are described. The service provider and management system can deploy edge applications servers, edge enable servers, edge configuration servers, and the 5G mobile networks to support edge computing for 3 GPP. In response to a request to install an edge computing (EC) network function (NF), a VNF is instantiated and connected to 5th generation core (5GC) NFs to send information over edge interfaces. In response to a request to terminate the EC NF, the EC NF associated with the EC NF identifier in the request is terminated and the EC NF disconnected from the 5GC NFs. An appropriate notification is sent to indicate successful installation or termination of the EC NF.
| # | Name | Date |
|---|---|---|
| 1 | 202247070596-PRIORITY DOCUMENTS [07-12-2022(online)].pdf | 2022-12-07 |
| 2 | 202247070596-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105-PCT Pamphlet) [07-12-2022(online)].pdf | 2022-12-07 |
| 3 | 202247070596-FORM 1 [07-12-2022(online)].pdf | 2022-12-07 |
| 4 | 202247070596-DRAWINGS [07-12-2022(online)].pdf | 2022-12-07 |
| 5 | 202247070596-DECLARATION OF INVENTORSHIP (FORM 5) [07-12-2022(online)].pdf | 2022-12-07 |
| 6 | 202247070596-COMPLETE SPECIFICATION [07-12-2022(online)].pdf | 2022-12-07 |
| 7 | 202247070596.pdf | 2022-12-26 |
| 8 | 202247070596-FORM 3 [07-06-2023(online)].pdf | 2023-06-07 |
| 9 | 202247070596-FORM-26 [19-06-2023(online)].pdf | 2023-06-19 |
| 10 | 202247070596-Proof of Right [08-09-2023(online)].pdf | 2023-09-08 |
| 11 | 202247070596-FORM 3 [07-12-2023(online)].pdf | 2023-12-07 |
| 12 | 202247070596-FORM 3 [08-05-2024(online)].pdf | 2024-05-08 |
| 13 | 202247070596-FORM 18 [19-07-2024(online)].pdf | 2024-07-19 |
| 14 | 202247070596-POA [15-01-2025(online)].pdf | 2025-01-15 |
| 15 | 202247070596-FORM 13 [15-01-2025(online)].pdf | 2025-01-15 |