Sign In to Follow Application
View All Documents & Correspondence

Electrical Switching Apparatus And Trip Latch Assembly Therefor

Abstract: A trip latch assembly (100) is provided for an electrical switching apparatus (2) such as a circuit breaker. The circuit breaker operating mechanism (8) includes a pole shaft (10). The trip latch assembly (100) includes a trip latch (102) pivotably coupled to the circuit breaker housing and being movable between a latched position and an unlatched position. A trip latch reset spring (104) is structured to bias the trip latch (102) toward the latched position. A spring housing (106) at least partially overlays the trip latch reset spring (104). A trip latch spring link (108) includes a first end (110) movably coupled to the pole shaft (10) and a second end (112) cooperating with the spring housing (106). When the circuit breaker needs to be reset the trip latch spring link (108) engages the spring housing (106) in order apply torque to the trip latch reset spring (104). When the circuit breaker (2) is closed the bias of the trip latch reset spring (104) on the trip latch (102) is removed.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
14 April 2014
Publication Number
40/2015
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
Parent Application
Patent Number
Legal Status
Grant Date
2021-12-08
Renewal Date

Applicants

EATON CORPORATION
Eaton Center 1111 Superior Avenue Cleveland Ohio 44114

Inventors

1. GOTTSCHALK Andrew Lawrence
131 Elm Drive Monaca Pennsylvania 15061
2. RAKUS Paul R.
115 Chestnut Ridge Drive Beaver Falls Pennsylvania 15010

Specification

Documents

Application Documents

# Name Date
1 GPA.pdf 2014-04-15
2 F5.pdf 2014-04-15
3 F3.pdf 2014-04-15
4 F2.pdf 2014-04-15
5 DW.pdf 2014-04-15
6 829-KOLNP-2014.pdf 2014-04-21
7 829-KOLNP-2014-(18-06-2014)-CORRESPONDENCE.pdf 2014-06-18
8 829-KOLNP-2014-(18-06-2014)-ASSIGNMENT.pdf 2014-06-18
9 829-KOLNP-2014-Information under section 8(2) (MANDATORY) [19-07-2018(online)].pdf 2018-07-19
10 829-KOLNP-2014-FER.pdf 2018-12-19
11 829-KOLNP-2014-OTHERS [12-06-2019(online)].pdf 2019-06-12
12 829-kolnp-2014-Information under section 8(2) (MANDATORY) [12-06-2019(online)].pdf 2019-06-12
13 829-KOLNP-2014-FORM-26 [12-06-2019(online)].pdf 2019-06-12
14 829-KOLNP-2014-FORM 3 [12-06-2019(online)].pdf 2019-06-12
15 829-KOLNP-2014-FER_SER_REPLY [12-06-2019(online)].pdf 2019-06-12
16 829-KOLNP-2014-DRAWING [12-06-2019(online)].pdf 2019-06-12
17 829-KOLNP-2014-CLAIMS [12-06-2019(online)].pdf 2019-06-12
18 829-kolnp-2014-Certified Copy of Priority Document (MANDATORY) [12-06-2019(online)].pdf 2019-06-12
19 829-KOLNP-2014-ABSTRACT [12-06-2019(online)].pdf 2019-06-12
20 829-KOLNP-2014-FORM 13 [23-04-2021(online)].pdf 2021-04-23
21 829-KOLNP-2014-PA [26-04-2021(online)].pdf 2021-04-26
22 829-KOLNP-2014-ASSIGNMENT DOCUMENTS [26-04-2021(online)].pdf 2021-04-26
23 829-KOLNP-2014-8(i)-Substitution-Change Of Applicant - Form 6 [26-04-2021(online)].pdf 2021-04-26
24 829-KOLNP-2014-Correspondence to notify the Controller [11-08-2021(online)].pdf 2021-08-11
25 829-KOLNP-2014-Written submissions and relevant documents [18-08-2021(online)].pdf 2021-08-18
26 829-KOLNP-2014-RELEVANT DOCUMENTS [18-08-2021(online)].pdf 2021-08-18
27 829-KOLNP-2014-PETITION UNDER RULE 137 [18-08-2021(online)].pdf 2021-08-18
28 829-KOLNP-2014-MARKED COPIES OF AMENDEMENTS [18-08-2021(online)].pdf 2021-08-18
29 829-KOLNP-2014-FORM 13 [18-08-2021(online)].pdf 2021-08-18
30 829-KOLNP-2014-AMMENDED DOCUMENTS [18-08-2021(online)].pdf 2021-08-18
31 829-KOLNP-2014-US(14)-HearingNotice-(HearingDate-16-08-2021).pdf 2021-10-03
32 829-KOLNP-2014-PatentCertificate08-12-2021.pdf 2021-12-08
33 829-KOLNP-2014-IntimationOfGrant08-12-2021.pdf 2021-12-08
34 829-KOLNP-2014-RELEVANT DOCUMENTS [30-09-2023(online)].pdf 2023-09-30

Search Strategy

1 search_28-08-2018.pdf

ERegister / Renewals

3rd: 04 Mar 2022

From 06/12/2014 - To 06/12/2015

4th: 04 Mar 2022

From 06/12/2015 - To 06/12/2016

5th: 04 Mar 2022

From 06/12/2016 - To 06/12/2017

6th: 04 Mar 2022

From 06/12/2017 - To 06/12/2018

7th: 04 Mar 2022

From 06/12/2018 - To 06/12/2019

8th: 04 Mar 2022

From 06/12/2019 - To 06/12/2020

9th: 04 Mar 2022

From 06/12/2020 - To 06/12/2021

10th: 04 Mar 2022

From 06/12/2021 - To 06/12/2022

11th: 02 Dec 2022

From 06/12/2022 - To 06/12/2023

12th: 05 Dec 2023

From 06/12/2023 - To 06/12/2024

13th: 29 Nov 2024

From 06/12/2024 - To 06/12/2025