Abstract: An embodiment may include circuitry to permit interruption at least in part of a first frame from a sender to an intended recipient in favor of transmitting at least in part a payload of a second frame from the sender to the intended recipient and/or processing at least in part one or more incoming flow control notifications. The payload may be transmitted at least in part to the intended recipient in one or more frame fragments. Many modifications variations and alternatives are possible without departing from this embodiment.
An embodiment may include circuitry to permit interruption at least in part of a first
frame from a sender to an intended recipient in favor of transmitting at least in part a payload
of a second frame from the sender to the intended recipient and/or processing at least in part
one or more incoming flow control notifications. The payload may be transmitted at least in
part to the intended recipient in one or more frame fragments. Many modifications variations
and alternatives are possible without departing from this embodiment.
| # | Name | Date |
|---|---|---|
| 1 | Form-1.pdf | 2012-11-08 |
| 2 | Drawings.pdf | 2012-11-08 |
| 3 | 9389-CHENP-2012 FORM-18 22-11-2012.pdf | 2012-11-22 |
| 4 | 9389-CHENP-2012 CORRESPONDENCE OTHERS 22-11-2012.pdf | 2012-11-22 |
| 5 | 9389-CHENP-2012 POWER OF ATTORNEY 12-12-2012.pdf | 2012-12-12 |
| 6 | 9389-CHENP-2012 CORRESPONDENCE OTHERS 12-12-2012.pdf | 2012-12-12 |
| 7 | FORM-2.pdf | 2014-11-24 |
| 8 | abstract9389-CHENP-2012.jpg | 2014-11-24 |
| 9 | ABSTRACT.pdf | 2014-11-24 |
| 10 | 9389-CHENP-2012-FER.pdf | 2018-08-31 |
| 11 | 9389-CHENP-2012-FORM 3 [21-09-2018(online)].pdf | 2018-09-21 |
| 12 | 9389-CHENP-2012-OTHERS [28-09-2018(online)].pdf | 2018-09-28 |
| 13 | 9389-CHENP-2012-Information under section 8(2) (MANDATORY) [28-09-2018(online)].pdf | 2018-09-28 |
| 14 | 9389-CHENP-2012-FER_SER_REPLY [28-09-2018(online)].pdf | 2018-09-28 |
| 15 | 9389-CHENP-2012-CLAIMS [28-09-2018(online)].pdf | 2018-09-28 |
| 16 | 9389-CHENP-2012-ABSTRACT [28-09-2018(online)].pdf | 2018-09-28 |
| 17 | 9389-CHENP-2012-Proof of Right (MANDATORY) [11-02-2019(online)].pdf | 2019-02-11 |
| 18 | 9389-CHENP-2012-PETITION UNDER RULE 137 [15-02-2019(online)].pdf | 2019-02-15 |
| 19 | Correspondence by Agent_Proof of Right_18-02-2019.pdf | 2019-02-18 |
| 20 | 9389-CHENP-2012-Correspondence to notify the Controller [29-09-2020(online)].pdf | 2020-09-29 |
| 21 | 9389-CHENP-2012-US(14)-HearingNotice-(HearingDate-15-10-2020).pdf | 2021-10-17 |
| 22 | 9389-CHENP-2012-US(14)-ExtendedHearingNotice-(HearingDate-23-10-2020).pdf | 2021-10-17 |
| 1 | searchstrategy_30-08-2018.pdf |