Abstract: The present disclosure relates to a method and a system for monitoring health of a refrigeration system. The present disclosure also relates to an Internet Of Things (IOT) enabled method and system for monitoring health of the WIF based on performance parameters like defrost cycle related parameters, defrost cycle duration, schedule and frequency. In one embodiment, the method receives a plurality of real-time temperature data collected by a temperature sensor and determines a steady state value based on the received real-time temperature data. Further, the method computes a plurality of defrost cycle parameter values and generate alarm signals based on deviations of the computed defrost cycle parameters from the respective threshold values. The method generates reports indicating patterns of defrost duration and defrost distribution over a time and provide recommendations to support maintenance of the refrigeration system in response to the deviations. Figure 3
Claims:We Claim:
1. A method of monitoring a refrigeration system, the method comprising:
receiving, by a refrigeration monitoring system (102), a plurality of real-time temperature data (208) from at least one temperature sensor (104) coupled with the refrigeration system;
determining, by the refrigeration monitoring system (102), at least a first steady state value and a second steady state value based on the plurality of real-time temperature data;
computing, by the refrigeration monitoring system (102), a plurality of defrost cycle parameter values (210) including at least defrost start time value, defrost end time value, peak temperature value, heater OFF time value, and heater ON duration value based on at least the first steady state value and the second steady state values; and
generating, by the refrigeration monitoring system (102), one or more alarm signals based on determination of deviations of at least one of the defrost cycle parameter values from respective predetermined threshold values.
2. The method as claimed in claim 1, wherein the determining the first steady state value comprises:
comparing each of the plurality of the real-time temperature data (208) with a predetermined percentile temperature value; and
determining one of the plurality of the real-time temperature data that exceeds the predetermined percentile temperature value as the first steady state value.
3. The method as claimed in claim 1, wherein the computing the plurality of defrost cycle parameters (210) comprises:
obtaining time stamp of the first steady state value as the defrost start time value;
determining one of the plurality of the real-time temperature data having highest temperature value as the peak temperature value;
determining the time stamp of the peak temperature value as the heater OFF time value;
calculating the heater ON duration value based on the defrost start time value and the heater OFF time value;
determining the timestamp of the second steady state value as the defrost end time value, the second steady state value is the real-time temperature data that exceeds the predetermined percentile temperature value during defrost operation; and
computing the defrost cycle duration value based on the defrost start time value and the defrost end time value.
4. The method as claimed in claim 1, wherein the generating the one or more alarm signals comprises:
determining a count of defrost cycles occurring in a predetermined time and performing a first comparison of the count of defrost cycles with a predetermined count value;
generating a first alarm signal based on the first comparison;
determining occurrence of the defrost cycles as per a predetermined schedule;
generating a second alarm signal based on the determination;
performing a second comparison of the heater ON duration value with a predetermined heater operation period; and
generating a third alarm signal based on the second comparison.
5. The method as claimed in claim 4, where the generating the one or more alarm signals further comprises:
determining a compressor inefficiency detection value based on the first steady state value and the plurality of real-time temperature data obtained through the at least one temperature sensor; and
generating a fourth alarm signal indicating flag for maintenance based on the determination.
6. The method as claimed in claim 1, further comprising generating one or more visualization reports associated with patterns of defrost duration and defrost duration distribution over a time and providing one or more recommendations to support maintenance of the refrigeration system in response to determination of deviations of at least one of the defrost cycle parameters.
7. The method as claimed in claim 1, further comprising updating a data repository (106) with the plurality of real-time temperature data (208) along with the timestamp, the plurality of defrost cycle parameters (210), the one or more deviations of the at least one defrost cycle parameters and one or more recommendations to support maintenance of the refrigeration system.
8. A system for monitoring a refrigeration system, said system comprising:
a processor (110);
at least one temperature sensor (104) coupled with the processor (110); and
a memory (112), communicatively coupled to the processor (110), wherein the memory (112) stores processor-executable instructions, which, on execution, cause the processor to:
receive a plurality of real-time temperature data (208) from the at least one temperature sensor (104);
determine at least a first steady state value and a second steady state value based on the plurality of real-time temperature data (208) thus received;
compute a plurality of defrost cycle parameter values (210) including at least defrost start time value, defrost end time value, peak temperature value, heater OFF time value, and heater ON duration value based on the at least first steady state value and second steady state value; and
generate one or more alarm signals based on determination of deviations of at least one of the defrost cycle parameter values (210) from respective predetermined threshold values.
9. The system as claimed in claim 8, wherein the processor (110) is configured to determine the first steady state value by:
comparing each of the plurality of the real-time temperature data (208) with a predetermined percentile temperature value; and
determining one of the plurality of the real-time temperature data that exceeds the predetermined percentile temperature value as the first steady state value.
10. The system as claimed in claim 8, wherein the processor (110) is configured to compute the plurality of defrost cycle parameters by:
obtaining time stamp of the first steady state value as the defrost start time value;
determining one of the plurality of the real-time temperature having highest temperature value as the peak temperature value;
determining the time stamp of the peak temperature value as the heater OFF time value;
calculating the heater ON duration value based on the defrost start time value and the heater OFF time value;
determining the timestamp of the second steady state value as the defrost end time value, the second steady state value is the real-time temperature data that exceeds the predetermined percentile temperature value during defrost operation; and
computing the defrost cycle duration value based on the defrost start time value and the defrost end time value.
11. The system as claimed in claim 8, where the processor (110) is configured to generate the one or more alarm signals by:
determining a count of defrost cycles occurring in a predetermined time and performing a first comparison of the count of defrost cycles with a predetermined count value;
generating a first alarm signal based on the first comparison;
determining occurrence of the defrost cycles as per a predetermined schedule;
generating a second alarm signal based on the determination;
performing a second comparison of the heater ON duration value with a predetermined heater operation period; and
generating a third alarm signal based on the second comparison.
12. The system as claimed in claim 11, where the processor (110) is further configured to:
determining a compressor inefficiency detection value based on the on the first steady state value and the second steady state value and the plurality of real-time temperature data obtained through the plurality of temperature sensors; and
generating a fourth alarm signal indicating flag for maintenance based on the determination.
13. The system as claimed in claim 8, wherein the processor (110) is further configured to generate one or more visualization reports associated with patterns of defrost duration and defrost duration distribution over a time and provide one or more recommendations to support maintenance of the refrigeration system in response to determination of deviations of at least one of the defrost cycle parameters (210).
14. The system as claimed in claim 8, further comprising a data repository (106) coupled with the processor (110), and configured to store and update the plurality of real-time temperature data (208) along with the timestamp, the plurality of defrost cycle parameters (210), the one or more deviations of the at least one defrost cycle parameters (210) and one or more recommendations to support maintenance of the refrigeration system.
Dated this 23rd day of November, 2016
Swetha SN
Of K&S Partners
Agent for the Applicant
, Description:FIELD OF THE DISCLOSURE
The present subject matter is related, in general to refrigeration systems, and more particularly, but not exclusively to a method and a system for monitoring health of refrigeration systems.
| # | Name | Date |
|---|---|---|
| 1 | 201641040012-IntimationOfGrant31-10-2023.pdf | 2023-10-31 |
| 1 | Form5_As Filed_23-11-2016.pdf | 2016-11-23 |
| 2 | 201641040012-PatentCertificate31-10-2023.pdf | 2023-10-31 |
| 2 | Form3_As Filed_23-11-2016.pdf | 2016-11-23 |
| 3 | Form2 Title Page_Complete_23-11-2016.pdf | 2016-11-23 |
| 3 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 4 | Form18_Normal Request_23-11-2016.pdf | 2016-11-23 |
| 4 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 5 | Drawing_As Filed_23-11-2016.pdf | 2016-11-23 |
| 5 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)].pdf | 2021-12-17 |
| 6 | Description Complete_As Filed_23-11-2016.pdf | 2016-11-23 |
| 6 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 7 | Claims_As Filed_23-11-2016.pdf | 2016-11-23 |
| 7 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 8 | Abstract_As Filed_23-11-2016.pdf | 2016-11-23 |
| 8 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)].pdf | 2021-12-17 |
| 9 | 201641040012-PA [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 9 | Form26_Power Of Attorney_25-11-2016.pdf | 2016-11-25 |
| 10 | 201641040012-PA [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 10 | Form26_Certified Copy_25-11-2016.pdf | 2016-11-25 |
| 11 | 201641040012-PA [17-12-2021(online)].pdf | 2021-12-17 |
| 11 | Form 26 [25-11-2016(online)].pdf | 2016-11-25 |
| 12 | 201641040012-FORM 3 [19-02-2020(online)].pdf | 2020-02-19 |
| 12 | Other Patent Document [28-12-2016(online)].pdf | 2016-12-28 |
| 13 | 201641040012-CLAIMS [28-01-2020(online)].pdf | 2020-01-28 |
| 13 | abstract 201641040012.jpg | 2016-12-28 |
| 14 | 201641040012-DRAWING [28-01-2020(online)].pdf | 2020-01-28 |
| 14 | Correspondence By Agent_Form1_02-01-2017.pdf | 2017-01-02 |
| 15 | 201641040012-FER_SER_REPLY [28-01-2020(online)].pdf | 2020-01-28 |
| 15 | 201641040012-REQUEST FOR CERTIFIED COPY [05-02-2018(online)].pdf | 2018-02-05 |
| 16 | 201641040012-FER.pdf | 2019-07-29 |
| 16 | 201641040012-FORM 3 [28-01-2020(online)].pdf | 2020-01-28 |
| 17 | 201641040012-FORM 3 [28-01-2020(online)].pdf | 2020-01-28 |
| 17 | 201641040012-FER.pdf | 2019-07-29 |
| 18 | 201641040012-FER_SER_REPLY [28-01-2020(online)].pdf | 2020-01-28 |
| 18 | 201641040012-REQUEST FOR CERTIFIED COPY [05-02-2018(online)].pdf | 2018-02-05 |
| 19 | 201641040012-DRAWING [28-01-2020(online)].pdf | 2020-01-28 |
| 19 | Correspondence By Agent_Form1_02-01-2017.pdf | 2017-01-02 |
| 20 | 201641040012-CLAIMS [28-01-2020(online)].pdf | 2020-01-28 |
| 20 | abstract 201641040012.jpg | 2016-12-28 |
| 21 | 201641040012-FORM 3 [19-02-2020(online)].pdf | 2020-02-19 |
| 21 | Other Patent Document [28-12-2016(online)].pdf | 2016-12-28 |
| 22 | 201641040012-PA [17-12-2021(online)].pdf | 2021-12-17 |
| 22 | Form 26 [25-11-2016(online)].pdf | 2016-11-25 |
| 23 | 201641040012-PA [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 23 | Form26_Certified Copy_25-11-2016.pdf | 2016-11-25 |
| 24 | Form26_Power Of Attorney_25-11-2016.pdf | 2016-11-25 |
| 24 | 201641040012-PA [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 25 | Abstract_As Filed_23-11-2016.pdf | 2016-11-23 |
| 25 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)].pdf | 2021-12-17 |
| 26 | Claims_As Filed_23-11-2016.pdf | 2016-11-23 |
| 26 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 27 | Description Complete_As Filed_23-11-2016.pdf | 2016-11-23 |
| 27 | 201641040012-ASSIGNMENT DOCUMENTS [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 28 | Drawing_As Filed_23-11-2016.pdf | 2016-11-23 |
| 28 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)].pdf | 2021-12-17 |
| 29 | Form18_Normal Request_23-11-2016.pdf | 2016-11-23 |
| 29 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)]-2.pdf | 2021-12-17 |
| 30 | Form2 Title Page_Complete_23-11-2016.pdf | 2016-11-23 |
| 30 | 201641040012-8(i)-Substitution-Change Of Applicant - Form 6 [17-12-2021(online)]-1.pdf | 2021-12-17 |
| 31 | 201641040012-PatentCertificate31-10-2023.pdf | 2023-10-31 |
| 31 | Form3_As Filed_23-11-2016.pdf | 2016-11-23 |
| 32 | 201641040012-IntimationOfGrant31-10-2023.pdf | 2023-10-31 |
| 32 | Form5_As Filed_23-11-2016.pdf | 2016-11-23 |
| 1 | SEARCH_11-06-2019.pdf |