Sign In to Follow Application
View All Documents & Correspondence

A Method For Performing An Initial Network Access Procedure By A User Equipment

Abstract: The present disclosure relates to a method and system for performing an initial network access procedure by a user equipment (UE) to access a network in a coverage area. The method includes performing, by the UE, initialization procedure of the UE. Synchronization, is performed by the UE with one or more base stations to prepare a fast network access index (FNAI) list. An initial network access message (INAM) is multicasted to at least one base station based on an INAM multicast list prepared in response to the FNAI list. At least one initial network access response (INAR) is received from the at least one base station in response to the INAM, each INAR comprising a current load information of a base station. The INAR is processed to determine at least one suitable base station. Synchronization with the suitable base station is performed to access the network in the coverage area. FIG. 9

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
30 March 2017
Publication Number
40/2018
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
ipo@knspartners.com
Parent Application
Patent Number
Legal Status
Grant Date
2020-11-10
Renewal Date

Applicants

WIPRO LIMITED
Doddakannelli, Sarjapur Road, Bangalore 560035, Karnataka, India.

Inventors

1. AVIJIT MANNA
Amrapali Castle, BLK-C, Flat No. – 3A, 3/1, Bediadanga 1ST Lane, Kolkata 700039, West Bengal, India
2. SAPTARSHI CHAUDHURI
LAA Glory, APT-201, 244/263, 34th Main, BTM 2nd Stage, Bangalore – 560068, Karnataka, India.
3. UTTAM SARKAR
Flat No. B2, SIPRA Apartment, MGM Sarani, Bidyalankar More, Chandannagar, Hooghly 712136, West Bengal, India

Specification

Claims:WE CLAIM:

1. A method of performing an initial network access procedure by a user equipment to access a network in a coverage area, the method comprising:
performing, by the user equipment (UE), an initialization procedure of the UE;
synchronizing, by the UE, with one or more base stations to prepare a fast network access index (FNAI) list;
multicasting, by the UE, an initial network access message (INAM) to at least one base station of the one or more base stations based on an INAM multicast list, the INAM multicast list being prepared in response to the FNAI list;
receiving, by the UE, at least one initial network access response (INAR) from the at least one base station of the one or more base stations in response to the INAM, each INAR comprising a current load information of a base station to indicate post latching service suitability of the at least one base station;
processing, by the UE, the at least one INAR to determine at least one suitable base station; and
synchronizing, by the UE, with the suitable base station to access the network in the coverage area.

2. The method as claimed in claim 1, wherein performing the initialization procedure of the UE comprises one of:
initializing the UE during start-up of the UE;
initializing the UE during rebooting of the UE; and
initializing the UE during re-latching of the UE.

3. The method as claimed in claim 1, wherein synchronizing with the one or more base stations comprises:
scanning a primary synchronization signal (PSS) and an extended secondary synchronization signal (ESSS) for each of the one or more base stations to generate synchronization results, the FNAI list being prepared during the scanning; and
providing, by a UE radio subsystem (UE-RSS) of the UE, the synchronization results to a UE data subsystem (UE-DSS).

4. The method as claimed in claim 3, wherein the FNAI list comprises cell identification number, an FNAI, and an offset time between the one or more base stations, the offset time being added in the INAM to inform the base station to transmit the INAR on expiry of the offset time from receipt of the INAM.

5. The method as claimed in claim 3, wherein the INAM multicast list is prepared by:
fetching, by the UE-DSS, network access related information (NARI); and
preparing, by the UE-DSS, the INAM multicast list based on the NARI.

6. The method as claimed in claim 5, wherein the NARI is fetched based on an FNAI of the base station that is encoded within the ESSS.

7. The method as claimed in claim 6, wherein the INAR is prepared by the base station on decoding the INAM received from the UE.

8. The method as claimed in claim 1, wherein the current load information is based on factors comprising a current throughput of the base station, a guaranteed bit rate subscription of the UE, number of UE, supported UE, and core network overloading condition.

9. The method as claimed in claim 1 and further comprising:
registering, by the UE, with the suitable base station by transmitting a registration request to the suitable base station.

10. A user equipment for performing an initial network access procedure to access a network in a coverage area, the user equipment comprising:
a processor; and
a memory, communicatively coupled to the processor, wherein the memory stores processor-executable instructions, which, on execution, causes the processor to:
perform an initialization procedure of the user equipment (UE);
synchronize with one or more base stations to prepare a fast network access index (FNAI) list;
multicast an initial network access message (INAM) to at least one base station of the one or more base stations based on an INAM multicast list, the INAM multicast list being prepared in response to the FNAI list;
receive at least one initial network access response (INAR) from the at least one base station of the one or more base stations in response to the INAM, each INAR comprising a current load information of a base station to indicate post latching service suitability of the at least one base station;
process the at least one INAR to determine at least one suitable base station; and
synchronize with the suitable base station to access the network in the coverage area.

11. The UE as claimed in claim 10, wherein the processor is further configured to perform the initialization procedure of the UE by one of:
initializing the UE during start-up of the UE;
initializing the UE during rebooting of the UE; and
initializing the UE during re-latching of the UE.

12. The UE as claimed in claim 10, wherein the processor is further configured to synchronize with the one or more base stations by:
scanning a primary synchronization signal (PSS) and an extended secondary synchronization signal (ESSS) for each of the one or more base stations to generate synchronization results, the FNAI list being prepared during the scanning; and
providing, by a UE radio subsystem (UE-RSS) of the UE, the synchronization results to a UE data subsystem (UE-DSS).

13. The UE as claimed in claim 12, wherein the FNAI list comprises cell identification number, an FNAI, and an offset time between the one or more base stations, the offset time being added in the INAM to inform the base station to transmit the INAR on expiry of the offset time from receipt of the INAM.

14. The UE as claimed in claim 12, wherein the INAM multicast list is prepared by:
fetching, by the UE-DSS, network access related information (NARI); and
preparing, by the UE-DSS, the INAM multicast list based on the NARI.

15. The UE as claimed in claim 14, wherein the NARI is fetched based on an FNAI of the base station that is encoded within the ESSS.

16. The UE as claimed in claim 15, wherein the INAR is prepared by the base station on decoding the INAM received from the UE.

17. The UE as claimed in claim 10, wherein the current load information is based on factors comprising a current throughput of the base station, a guaranteed bit rate subscription of the UE, number of UE, supported UE, and core network overloading condition.

18. The UE as claimed in claim 10, wherein the processor is further configured to:
register with the suitable base station by transmitting a registration request to the suitable base station.

Dated this 30th day of March, 2017

Swetha SN
Of K&S Partner
Agent for the Applicant
, Description:TECHNICAL FIELD

The present subject matter generally relates to field of network access. More particularly, the present disclosure discloses a method and user equipment for performing an initial network access procedure.

Documents

Application Documents

# Name Date
1 Power of Attorney [30-03-2017(online)].pdf 2017-03-30
2 Form 5 [30-03-2017(online)].pdf 2017-03-30
3 Form 3 [30-03-2017(online)].pdf 2017-03-30
4 Form 18 [30-03-2017(online)].pdf_109.pdf 2017-03-30
5 Form 18 [30-03-2017(online)].pdf 2017-03-30
6 Form 1 [30-03-2017(online)].pdf 2017-03-30
7 Drawing [30-03-2017(online)].pdf 2017-03-30
8 Description(Complete) [30-03-2017(online)].pdf_108.pdf 2017-03-30
9 Description(Complete) [30-03-2017(online)].pdf 2017-03-30
9 201741011336-SER.pdf 2020-08-07
10 201741011336-FER_SER_REPLY [05-08-2020(online)].pdf 2020-08-05
10 201741011336-Proof of Right (MANDATORY) [13-07-2017(online)].pdf 2017-07-13
11 Correspondence by Agent_Form 30 and Form 1_18-07-2017.pdf 2017-07-18
12 201741011336-REQUEST FOR CERTIFIED COPY [20-12-2017(online)].pdf 2017-12-20
13 201741011336-PETITION UNDER RULE 137 [05-08-2020(online)].pdf 2020-08-05
13 201741011336-REQUEST FOR CERTIFIED COPY [09-02-2018(online)].pdf 2018-02-09
14 201741011336-FER.pdf 2020-02-06
15 201741011336-PETITION UNDER RULE 137 [05-08-2020(online)].pdf 2020-08-05
16 201741011336-REQUEST FOR CERTIFIED COPY [20-12-2017(online)].pdf 2017-12-20
16 201741011336-Information under section 8(2) [05-08-2020(online)].pdf 2020-08-05
17 201741011336-FORM 3 [05-08-2020(online)].pdf 2020-08-05
17 Correspondence by Agent_Form 30 and Form 1_18-07-2017.pdf 2017-07-18
18 201741011336-FER_SER_REPLY [05-08-2020(online)].pdf 2020-08-05
18 201741011336-Proof of Right (MANDATORY) [13-07-2017(online)].pdf 2017-07-13
19 201741011336-SER.pdf 2020-08-07
19 Description(Complete) [30-03-2017(online)].pdf 2017-03-30
20 Description(Complete) [30-03-2017(online)].pdf_108.pdf 2017-03-30
20 201741011336-Correspondence to notify the Controller [17-08-2020(online)].pdf 2020-08-17
21 Drawing [30-03-2017(online)].pdf 2017-03-30
21 201741011336-FER_SER_REPLY [28-08-2020(online)].pdf 2020-08-28
22 Form 1 [30-03-2017(online)].pdf 2017-03-30
22 201741011336-CLAIMS [28-08-2020(online)].pdf 2020-08-28
23 Form 18 [30-03-2017(online)].pdf 2017-03-30
23 201741011336-PatentCertificate10-11-2020.pdf 2020-11-10
24 201741011336-IntimationOfGrant10-11-2020.pdf 2020-11-10
24 Form 18 [30-03-2017(online)].pdf_109.pdf 2017-03-30
25 201741011336-PROOF OF ALTERATION [11-03-2022(online)].pdf 2022-03-11
25 Form 3 [30-03-2017(online)].pdf 2017-03-30
26 201741011336-RELEVANT DOCUMENTS [27-09-2022(online)].pdf 2022-09-27
26 Form 5 [30-03-2017(online)].pdf 2017-03-30
27 201741011336-RELEVANT DOCUMENTS [20-09-2023(online)].pdf 2023-09-20
27 Power of Attorney [30-03-2017(online)].pdf 2017-03-30

Search Strategy

1 searchstrategy_05-02-2020.pdf

ERegister / Renewals

3rd: 11 Jan 2021

From 30/03/2019 - To 30/03/2020

4th: 11 Jan 2021

From 30/03/2020 - To 30/03/2021

5th: 11 Jan 2021

From 30/03/2021 - To 30/03/2022

6th: 11 Mar 2022

From 30/03/2022 - To 30/03/2023

7th: 16 Mar 2023

From 30/03/2023 - To 30/03/2024

8th: 19 Mar 2024

From 30/03/2024 - To 30/03/2025

9th: 28 Mar 2025

From 30/03/2025 - To 30/03/2026