Sign In to Follow Application
View All Documents & Correspondence

Method For Fabrication Of Optical Fibre Soot Preform

Abstract: The present disclosure provides a method for fabrication of an optical fibre soot preform (122). The method includes production of silicon dioxide particles (108) along with waste particulates. The silicon dioxide particles (108) are produced using a precursor material in a combustion chamber 10 (102). In addition, the method includes cooling of the silicon dioxide particles (108). Further, the method includes agglomeration of the silicon dioxide particles (108). Furthermore, the method includes separation of the waste particulates from the silicon dioxide particles (108). Moreover, the method includes dehydration of the silicon dioxide particles (108). Also, 15 the method includes compaction of the silicon dioxide particles (108). The compaction of the silicon dioxide particles (108) facilitates fabrication of the optical fibre soot preform (122)

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
13 August 2019
Publication Number
08/2021
Publication Type
INA
Invention Field
METALLURGY
Status
Email
patent@ipmetrix.com
Parent Application
Patent Number
Legal Status
Grant Date
2024-01-04
Renewal Date

Applicants

Sterlite Technologies Limited
E-1, E-2, E-3 MIDC Waluj Aurangabad Maharashtra India 431136

Inventors

1. Sandeep Gaikwad
E-1, E-2, E-3 MIDC Waluj Aurangabad Maharashtra India 431136
2. Badri Gomatam
E-1, E-2, E-3 MIDC Waluj Aurangabad Maharashtra India 431136
3. Anand Pandey
E-1, E-2, E-3 MIDC Waluj Aurangabad Maharashtra India 431136

Specification

0

Documents

Application Documents

# Name Date
1 201921032808-IntimationOfGrant04-01-2024.pdf 2024-01-04
1 201921032808-STATEMENT OF UNDERTAKING (FORM 3) [13-08-2019(online)].pdf 2019-08-13
2 201921032808-PatentCertificate04-01-2024.pdf 2024-01-04
2 201921032808-REQUEST FOR EXAMINATION (FORM-18) [13-08-2019(online)].pdf 2019-08-13
3 201921032808-POWER OF AUTHORITY [13-08-2019(online)].pdf 2019-08-13
3 201921032808-PETITION UNDER RULE 137 [31-05-2022(online)].pdf 2022-05-31
4 201921032808-Proof of Right [31-05-2022(online)].pdf 2022-05-31
4 201921032808-FORM 18 [13-08-2019(online)].pdf 2019-08-13
5 201921032808-FORM 1 [13-08-2019(online)].pdf 2019-08-13
5 201921032808-FER_SER_REPLY [21-05-2022(online)].pdf 2022-05-21
6 201921032808-FORM 3 [21-05-2022(online)].pdf 2022-05-21
6 201921032808-DRAWINGS [13-08-2019(online)].pdf 2019-08-13
7 201921032808-Response to office action [21-05-2022(online)].pdf 2022-05-21
7 201921032808-DECLARATION OF INVENTORSHIP (FORM 5) [13-08-2019(online)].pdf 2019-08-13
8 201921032808-FER.pdf 2021-11-22
8 201921032808-COMPLETE SPECIFICATION [13-08-2019(online)].pdf 2019-08-13
9 201921032808-CORRESPONDENCE(IPO)-(CERTIFIED COPY)-(18-9-2020).pdf 2021-10-19
9 201921032808-Covering Letter(Mandatory) [28-08-2019(online)].pdf 2019-08-28
10 201921032808-Annexure (Optional) [28-08-2019(online)].pdf 2019-08-28
10 201921032808-FORM 3 [29-09-2020(online)].pdf 2020-09-29
11 201921032808-FORM 2 (PROVISIONAL SPECIFICATION) AS 9(3) REQUEST- 03-09-2020.pdf .pdf 2020-09-03
11 Abstract1.jpg 2019-11-02
12 201921032808-Covering Letter [20-08-2020(online)].pdf 2020-08-20
12 201921032808-FORM 18 [24-12-2019(online)].pdf 2019-12-24
13 201921032808-CORRESPONDENCE-OTHERS [24-12-2019(online)].pdf 2019-12-24
13 201921032808-REQUEST FOR CERTIFIED COPY [20-08-2020(online)].pdf 2020-08-20
14 201921032808-Request Letter-Correspondence [20-08-2020(online)].pdf 2020-08-20
15 201921032808-CORRESPONDENCE-OTHERS [24-12-2019(online)].pdf 2019-12-24
15 201921032808-REQUEST FOR CERTIFIED COPY [20-08-2020(online)].pdf 2020-08-20
16 201921032808-Covering Letter [20-08-2020(online)].pdf 2020-08-20
16 201921032808-FORM 18 [24-12-2019(online)].pdf 2019-12-24
17 Abstract1.jpg 2019-11-02
17 201921032808-FORM 2 (PROVISIONAL SPECIFICATION) AS 9(3) REQUEST- 03-09-2020.pdf .pdf 2020-09-03
18 201921032808-FORM 3 [29-09-2020(online)].pdf 2020-09-29
18 201921032808-Annexure (Optional) [28-08-2019(online)].pdf 2019-08-28
19 201921032808-CORRESPONDENCE(IPO)-(CERTIFIED COPY)-(18-9-2020).pdf 2021-10-19
19 201921032808-Covering Letter(Mandatory) [28-08-2019(online)].pdf 2019-08-28
20 201921032808-COMPLETE SPECIFICATION [13-08-2019(online)].pdf 2019-08-13
20 201921032808-FER.pdf 2021-11-22
21 201921032808-DECLARATION OF INVENTORSHIP (FORM 5) [13-08-2019(online)].pdf 2019-08-13
21 201921032808-Response to office action [21-05-2022(online)].pdf 2022-05-21
22 201921032808-DRAWINGS [13-08-2019(online)].pdf 2019-08-13
22 201921032808-FORM 3 [21-05-2022(online)].pdf 2022-05-21
23 201921032808-FER_SER_REPLY [21-05-2022(online)].pdf 2022-05-21
23 201921032808-FORM 1 [13-08-2019(online)].pdf 2019-08-13
24 201921032808-FORM 18 [13-08-2019(online)].pdf 2019-08-13
24 201921032808-Proof of Right [31-05-2022(online)].pdf 2022-05-31
25 201921032808-POWER OF AUTHORITY [13-08-2019(online)].pdf 2019-08-13
25 201921032808-PETITION UNDER RULE 137 [31-05-2022(online)].pdf 2022-05-31
26 201921032808-REQUEST FOR EXAMINATION (FORM-18) [13-08-2019(online)].pdf 2019-08-13
26 201921032808-PatentCertificate04-01-2024.pdf 2024-01-04
27 201921032808-STATEMENT OF UNDERTAKING (FORM 3) [13-08-2019(online)].pdf 2019-08-13
27 201921032808-IntimationOfGrant04-01-2024.pdf 2024-01-04
28 201921032808-FORM-27 [19-09-2025(online)].pdf 2025-09-19

Search Strategy

1 SearchHistoryE_18-11-2021.pdf

ERegister / Renewals

3rd: 03 Apr 2024

From 13/08/2021 - To 13/08/2022

4th: 03 Apr 2024

From 13/08/2022 - To 13/08/2023

5th: 03 Apr 2024

From 13/08/2023 - To 13/08/2024

6th: 02 Aug 2024

From 13/08/2024 - To 13/08/2025

7th: 05 Aug 2025

From 13/08/2025 - To 13/08/2026