Abstract: The present invention employs a welded article manufacturing method comprising: a step (ST1) for supplying a first metal member E; a step (ST2) for supplying a second metal member D of which the temperature reaches the melting point earlier than the temperature of the first metal member E when the second metal member D is brought into contact with the first metal member E and current is applied between both metal members; a step (ST3) for preheating the first metal member E with high-frequency induced current; a step (ST4) for pressing the first metal member E and the second metal member D; a step (ST5) for applying current between the first metal member E and the second metal member D when the temperature of the first metal member E reaches a predetermined temperature TS4 owing to the preheating; and steps (ST4 ST5) for welding the first and second metal members E D to each other by means of the pressing and the application of current. Consequently the present invention provides: a method for manufacturing a welded article having a sufficient welding length even when metals the temperature of one of which reaches the melting point earlier than the temperature of the other one of the metals at the time of welding by means of application of current are welded to each other; and a welding device for welding such metals to each other.
METHOD FOR MANUFACTURING DISSIMILAR METALS-JOINED ARTICLE AND
JOINING APPARATUS
TECHNICAL FIELD
[0001]
The present invention relates to a method for manufacturing a dissimilar metals-joined
article and a joining apparatus, specifically to a method for manufacturing a joined article by
joining metal members that are such that, for example, one reaches a melting point while the
other is at a softening temperature during electric current joining, and to a joining apparatus for
joining such metals.
BACKGROUND ART
[0002]
There is much demand for solid phase joining of aluminum and iron, because the
method allows for weight reduction. Aluminum and iron can be solid phase joined by, for
example, Ring mash (registered trademark) joining or ring projection joining using a resistance
welding apparatus.
RELATED ART DOCUMENT
PATENT DOCUMENTS [0003]
Patent Document 1: JP 5909014 B
SUMMARY OF THE INVENTION PROBLEM TO BE SOLVED BY THE INVENTION
In the state of the art, in cases where aluminum and iron or other such metals having
significantly dissimilar melting points are employed, the metal having the lower melting point
(“low melting point metal”) melts in the vicinity of a joint portion during solid phase joining, and
it is therefore difficult to extend a joint length. During solid phase joining, the temperature of
the low melting point metal exceeds the melting point at a temperature at which the metal having
the higher melting point (“high melting point metal”) softens, so the low melting point metal
melts in the vicinity of the joint portion, and thus the joint length cannot be extended, and also a
large amount of spatter may occur. Under certain conditions, although the low melting point
metal softens and melts, the high melting point metal does not soften and cannot undergo plastic
deformation, and it is therefore not possible to perform solid phase joining. [0005]
In view of the problems stated above, it is an objective of the present invention to
provide: a method for manufacturing a joined article in which joint length is adequate even when
metals are joined together that are such that, for example, one reaches a melting point before the
other during electric current joining; and a joining apparatus that joins such metal members
together.
MEANS FOR SOLVING THE PROBLEM
[0006]
To achieve the above object, a method for manufacturing a joined article according to
the first aspect of the present invention includes, as shown in FIGs. 3, 5B and 6, for example,
providing the first metal member E (ST1); providing the second metal member D, the second
metal member D reaching a melting point before the first metal member E when the second
metal member D is brought into contact with the first metal member E and an electric current is
applied between the two metal members D and E (ST2); preheating the first metal member E
using a high-frequency induced electric current (ST3); applying pressure on the first metal
member E and the second metal member D (ST4); applying an electric current between the first
metal member E and the second metal member D at a timing at which a temperature of the first
metal member E has reached a prescribed temperature TS4 due to the preheating (ST5); and
joining the first and second metal members D and E through the application of pressure and the
application of an electric current (ST4, ST5). [0007]
In this way, since there are provided a step of preheating a first metal member and a step
of applying an electric current between the first metal member and a second metal member at a
timing at which a temperature of the first metal member has reached a prescribed temperature
due to the preheating, even when employing metal members in which a second metal member
reaches a melting point before a first metal member when the second metal member is brought
into contact with the first metal member and an electric current is applied between the two metal
members, the temperatures of the two metal members at the time of being joined together can be
made suitable for solid phase joining. Accordingly, it is possible to provide a method for
manufacturing a joined article in which joint length is adequate. A temperature suitable for
solid phase joining means a temperature at which no excessive spatter occurs due to melting of
one of the metal members, especially the second metal member. A temperature suitable for
solid phase joining can also be expressed as a temperature at which electric resistance welding is
possible, which means that the temperatures of the two metal members are both higher than the
softening temperatures of the members but do not fall beyond the melting points thereof. The
“prescribed temperature” as referred to herein means a temperature such that, in a case where
such a temperature is employed for the first metal member, the first metal member and the
second metal member will be at the softening temperatures thereof at which appropriate electric
resistance welding can be carried out when both metal members are brought into contact and an
electric current is applied thereon. [0008]
As for the method for manufacturing a joined article according to the second aspect of
the present invention, for example, the method for manufacturing a joined article according to
the first aspect further includes the first metal member E is a magnetic substance. [0009]
Since the first metal member to be preheated is a magnetic substance, the efficiency of
heating based on a high-frequency induced electric current is high. The preheating based on a
high-frequency induced electric current may be carried out while having the two metal members
removed from each other. In a case where the two members are removed greatly such that
there is no substantial impact from the heating based on a high-frequency induced electric
current, the second metal member may also be a magnetic substance. [0010]
As for the method for manufacturing a joined article according to the third aspect of the
present invention, for example, the method for manufacturing a joined article according to the
first or second aspect further includes the second metal member has a lower melting point than
the first metal member. [0011]
Since the second metal member has a lower melting point than the first metal member,
the second metal member more readily reaches the melting point before the first metal member
when the second metal member is brought into contact with the first metal member and an
electric current is applied between the two metal members. [0012]
As for the method for manufacturing a joined article according to the fourth aspect of
the present invention, for example, the method for manufacturing a joined article according to
the first or second aspect further includes the first metal member E has a higher heat conductivity
than the second metal member D. [0013]
In this way, since the first metal member has a higher heat conductivity, heat is readily
dissipated from the first metal member and temperature rises less readily therein than in the
second metal member when the first metal member is brought into contact with the second metal
member and an electric current is applied on the two metal members. Accordingly, the second
metal member more readily reaches the melting point before the first metal member. [0014]
As for the method for manufacturing a joined article according to the fifth aspect of the
present invention, for example, the method for manufacturing a joined article according to the
first or second aspect further includes the first metal member has a larger heat capacity than the
second metal member. [0015]
In this way, since the first metal member has a larger heat capacity than the second
metal member, the temperature rises less readily in the first metal member. Heat capacity is
arrived at by multiplying specific heat by mass.
[0016]
To achieve the above object, A joining apparatus for metal members according to the
sixth aspect of the present invention includes, as shown in FIGs. 1, 3 and 5B, for example, the
joining apparatus for metal members, joining a first metal member E and a second metal member
D reaching a melting point before the first metal member E when the second metal member D is
brought into contact with the first metal member E and an electric current is applied between the
two metal members E and D, the apparatus comprising: an induction coil 23 configured to
preheat the first metal member E using a high-frequency induced electric current; first and
second electrodes 11 and 12 configured to apply an electric current between the first metal
member E and the second metal member D at a timing at which a temperature of the first metal
member E has reached a prescribed temperature TS4 due to the preheating; a pressure
application device 12P configured to apply pressure on the first metal member E and the second
metal member D; and a control unit 50 configured to perform control according to which the
application of an electric current based on the high-frequency induced electric current and the
application of pressure by the pressure application device 12P are carried out at timings set in
accordance with material characteristics of the first metal member E and the second metal
member D. [0017]
Typically, the material characteristics are a melting point, heat conductivity, and heat
capacity.
In this way, an apparatus for joining metal members is achieved that can manufacture a
joined article in which joint length is adequate.
EFFECT OF THE INVENTION
[0018]
According to the present invention, it is possible to manufacture a joined article in
which joint length is adequate even when metals are joined together that are such that, for
example, one reaches a melting point before the other during electric current joining.
[0019]
FIG. 1 is a schematic configuration diagram of a joining apparatus according to an
embodiment of the present invention.
5 FIGs. 2A to 2C is a diagram, illustrating joining of a member D and a member E
according to the embodiment of the present invention, where FIG. 2A is a perspective view of
the member D and the member E, FIG. 2B is a cross-sectional view of the member D and the
member E, and FIG. 2C is a cross-sectional view of a joined article C.
FIGs. 3A to 3F is a schematic diagram, illustrating a procedure of a method for
0 manufacturing a joined article according to the embodiment of the present invention.
FIG. 4 is a schematic diagram, illustrating a joining apparatus according to another
embodiment of the present invention.
FIGs. 5A and 5B is a schematic diagram, illustrating a conventional example of a
method for manufacturing a joined article (method for joining metal members), together with
5 temperatures of the members.
FIGs. 5C and.5D is a schematic diagram, illustrating the method for manufacturing the
joined article according to the embodiment of the present invention. FIG. 5C is a diagram,
illustrating a state prior to application of pressure and an electric current and a state after
application of pressure and an electric current, and FIG.5D is a graph, illustrating temperatures
0 of both metal members over the passage of time.
FIG. 5E is a schematic diagram, illustrating a method for manufacturing the joined
article according to the other embodiment of the present invention.
FIG. 6 is a flowchart, illustrating the method for manufacturing a joined article, which
defines the embodiment of the present invention.
5
DETAILED DESCRIPTION OF THE INVENTION
[0020]
This application is based on the Patent Application No. 2017-164321 filed on August 29, 2017
0 in Japan, the contents of which are hereby incorporated in its entirety by reference into the present
application, as part thereof.
The present invention will become more fully understood from the detailed description given hereinbelow. Further range of application of the present invention will become clearer from the detailed description given hereinbelow. However, the detailed description and the specific embodiment are illustrated of desired embodiments of the present invention and are described only for the purpose of explanation. Various changes and modifications will be apparent to those ordinary skilled in the art on the basis of the detailed description.
The applicant has no intention to give to public any disclosed embodiment. Among the
disclosed changes and modifications, those which may not literally fall within the scope of the patent
claims constitute, therefore, a part of the present invention in the sense of doctrine of equivalents. [0021]
Description will hereinafter be made of an embodiment of the present invention with reference
to the drawings. The same or corresponding members are denoted with the same reference numerals in
all the drawings, and their descriptions are not repeated. [0022]
“Joining” as referred to in the present invention is typically solid phase joining. Solid
phase joining is a technical term used in the field of welding and is a generic term for welding
methods in which joint surfaces are joined at solid phase surfaces. In this method, welding on a
joint portion (welded joint) is performed at a temperature lower than or equal to the melting
point of a base material. Thus, notwithstanding the term “welding”, members to be joined are
joined without being melted. Even if a member is partially melted, joining strength is obtained
at a portion that is joined at or below the melting point. For the sake of convenience, when
“solid phase joining” is referred to in this description, the concept of the term encompasses cases
where such partial melting is carried out, in particular, cases where an edge portion in Ring mash
joining explained below is melted partially or a leading end portion of a projection in projection
joining explained below is melted partially. Such partial melting typically occurs immediately
after energization is commenced. [0023]
Ring mash (registered trademark) joining is one known method for electrically joining
two (metal) members to be joined with large joining strength. In this method, an outer diameter
of one of the members to be joined is made somewhat larger than an inner diameter of a hole of
8
the other member to be joined, thereby creating an overlap margin. Positioning is carried out
such that a portion to be joined of the one member to be joined slightly overlaps with a portion to
be joined in the hole of the other member to be joined, and in this state, an electric current is
applied on the two members to be joined while pressure is being applied on the two members.
In this manner, the solid phase joining is carried out by causing plastic flow in the portions to be
joined and pressing one member to be joined into the hole of the other member to be joined.
Another similar joining method is projection joining. Ring mash joining and projection joining
are both joining methods based on resistance welding where a welding electric current is applied
concurrently with application of pressure. [0024]
First, with reference to FIG. 1, described will be an apparatus 1 for manufacturing a
joined article, which includes a joining apparatus according to an embodiment of the present
invention. FIG. 1 is a schematic configuration diagram of the apparatus 1 for manufacturing a
joined article. The apparatus 1 for manufacturing a joined article includes: an electrode 11
serving as a first electrode to be brought into contact with a member D serving as a second metal
member; an electrode 12 serving as a second electrode to be brought into contact with a member
E serving as a first metal member; a welding power source 15; a housing 30 accommodating
these; and a control unit 50. There are also provided a high-frequency power source 25 and an
induction coil 23. Now, before giving detailed description on the apparatus 1 for
manufacturing a joined article, an example of a configuration of a joined article that is
manufactured by the apparatus 1 for manufacturing a joined article will be described. [0025]
The apparatus 1 for manufacturing a joined article is configured to be capable of
carrying out resistance welding on the member D and the member E by means of the electrode
11 and the electrode 12. The electrode 11 has a first contact face 11t that is formed on an upper
face of the electrode 11 and that the member D is brought into contact with. The first contact
face 1 1t is typically formed to be flat. The electrode 11 is typically placed on a bottom face of
the housing 30 such that the first contact face 11t is horizontal. The electrode 12 is placed
above the electrode 11 and has a second contact face 12t that is formed on a lower face of the
electrode 12 and that the member E is brought into contact with. The second contact face 12t is
typically formed to be flat. The electrode 12 is supported by an electrode support (not
illustrated) such that the second contact face 12t is horizontal. The electrode 12 is configured to
be such that when supported by the electrode support (not illustrated), the electrode 12 is
movable vertically and can be pressed against the electrode 11. The electrode 11 and the
electrode 12 are electrically connected to the welding power source 15. [0026]
The welding power source 15, which supplies an electric current to the electrode 11 and
the electrode 12, includes a charging circuit, a capacitor charged by the charging circuit, a
transformer, and the like, and is typically a power source that is capable of supplying a pulsed
welding electric current. [0027]
Here, a pulsed electric current is typically a single pulsed electric current. This pulsed
electric current has an electric current peak value of, for example, several tens to several
hundreds of thousands of amperes and a pulse width thereof is from 10 milliseconds to 100
milliseconds. With such a pulsed electric current, joining between members to be joined can be
carried out reliably. [0028]
A preheat power source 25 is a power source that supplies a high-frequency electric
current to the preheat coil 23. The high-frequency power source may be a power source
constituted by, for example, a circuit that converts mains electricity into DC, a circuit that
generates high-frequency energy with a thyristor, MOSFET, IGBT, etc., and a matching unit
serving to efficiently transmit the high-frequency energy to the heating coil. [0029]
The induction (preheat) coil 23 that heats the first metal member E is a single-turn or
double-turn coil constituted by a thick copper rod for passing a large electric current. The coil
23 is disposed so as to surround the portion to be preheated in the first metal member E. [0030]
The housing 30 accommodates the electrode 11, the electrode 12, the welding power
source 15, the preheat power source 25, and other relevant equipment forming the apparatus 1
for manufacturing a joined article. The apparatus 1 for manufacturing a joined member
constituted in this way can be easily transported as one unit. The housing 30 has an opening 31
through which the member D, the member E, and the joined article C can be put into and taken
out of the housing 30. [0031]
The control unit 50 is a device for controlling the operation of the apparatus 1 for
manufacturing a joined article. The control unit 50 is connected to each of the electrode
support (not illustrated) and a coil support (not illustrated) independently via a separate signal
cable and is configured to be capable of independently moving the electrode 12 vertically. The
control unit 50 is also connected to the welding power source 15 via a signal cable and is
configured to be capable of controlling the supply and shutoff of an electric current to the
electrode 11 and the electrode 12 as well as the magnitude of the electric current supplied
thereto. [0032]
The control unit 50 is also connected to the preheat power source 25 and is configured
to control the magnitude of the electric current supplied to the induction (preheat) coil 23 and the
timing at which to, for example, commence or terminate supply of the electric current to the coil
23. The control unit 50 typically is attached to the housing 30 either inside or outside the
housing 30 but may also be disposed at a location remote from the housing 30 and configured to
operate the apparatus 1 for manufacturing a joined article remotely. [0033]
The control unit 50 includes a timing saving unit 51 and a controller 52. The timing
saving unit 51 saves timings for preheating (from preheating to a time t1 at which a joining step
involving the application of pressure and an electric current commences, or a temperature TS4 of
the first metal member at the time of commencement of the joining step). The controller 52
controls the welding power source 15, the preheat (high-frequency) power source 25, and a
pressure application device 12P while controlling the commencement of preheating as well as
the completion of preheating and the commencement of the joining step in accordance with the
timings saved in the timing saving unit. [0034]
FIG. 2A is a perspective view of the member D serving as the second metal member and
the member E serving as the first metal member. FIG. 2B is a cross-sectional view of the
member D and the member E. FIG. 2C is a cross-sectional view of the joined article. The
joined article C is a component obtained by welding the member D and the member E together.
In this embodiment, description is given on the assumption that the member D is formed to have
a ring-like shape and the member E is formed to have a circular cylindrical shape. The member
D has a thick disk-like shape, through the center of which a circular cylindrical hollow portion
Dh is formed. In the member D, an outer circumference of the disk and a circumference of the
hollow portion Dh are concentric. In the member D, a corner between an end face Ds and the
hollow portion Dh is chamfered so as to form a first joint surface Df The first joint surface Df
corresponds to a portion to be joined in the member D. This example describes a case where
the joint length is short, but the same principle is applicable to a case with a great joint length. [0035]
The member E is formed such that an outer diameter thereof is somewhat larger than the
diameter of the hollow portion Dh of the member D. In the member E, a corner between an end
face and a lateral face of the member E is chamfered so as to form a second joint surface Ef
The first joint surface Ef corresponds to a portion to be joined in the member E. The first joint
surface Ef is formed such that the first joint surface Ef contacts the second joint surface Df of the
member D by surface contact. [0036]
Preferably, in the joining step, the joining electric current is passed through the portions
to be joined in the member D and the member E while pressure is being applied on the portions.
Application of pressure facilitates the occurrence of plastic flow. The joining step consists of
resistance welding in which Joule’s heat, which is generated by contact resistance between the
member D and the member E made of metal materials, is used to join the two members. The
resistance welding here, despite being called “welding”, is typically solid phase joining that does
not involve melting, as has been described earlier. [0037]
Lowering of the member E in bringing the same into contact with the member D in a
contact-placing step, a preheating step, and the joining step (a pressure application step and a
step of applying an electric current to both metal members) are controlled by the control unit 50. [0038]
With reference to FIGs. 3 A to 3F, the flow of an electric current during joining and the
joint portions will be described.
FIGs. 3A to 3F is a diagram illustrating discharge in the case of Ring mash (registered trademark) joining. While pressure P is being applied on the electrode 12 by a pressure application device 12P, an electric current A is passed from the electrode 12 in contact with the member E toward the electrode 11 in contact with the member D. The electric current flows through contact portions F of the two members and heats the contact portions to join the same, resulting in the formation of the joint portions. In this embodiment, as described above, the welding power source 15 includes a capacitor and instantly discharges electric energy, so a relatively large electric current is obtained within a short time (e.g. several tens of milliseconds) and the second joint surface Df and the first joint surface Ef are solid-phase joined.
The pressure application device 12P is typically a piston-cylinder mechanism as
illustrated in FIG. 3F. Compressed air PA is supplied to the cylinder. However, it is also
possible to use other types of fluid, such as oil or water, rather than air. [0039]
The induction coil 23 is disposed so as to surround the first metal member E and serves
to preheat the first metal member E before an electric current is applied between the two
members. [0040]
With reference to FIG. 4, another embodiment will be described. In this case, a hollow
portion Eh is formed in the first metal member E. Accordingly, an induction coil 23A is
provided in the hollow portion Eh. In this example, it is preferable to employ a configuration in
which, in the drawing, pressure is applied on the first metal member E upward by the electrode
11 so that pressure is applied on the first metal member E and the second metal member D.
However, it is also possible to employ a configuration in which, in the drawing, the electrode 12
is moved downward together with the second metal member D so that the second metal member
D is pressed into the first metal member E, whereby pressure is applied on the two metal
members. [0041]
With reference to FIGs. 5A to 5C, a method for manufacturing a dissimilar
metals-joined article according to the embodiment of the present invention will be described.
First, with reference to FIGs. 5A and 5B, a conventional method involving no
preheating will be described. In this example, the first metal member E is iron or an iron steel
material (simply referred to as “iron” below) and the second metal member D is aluminum or an
aluminum alloy (simply referred to as “aluminum” below). The graph illustrates TS as the
temperature of the iron, TS1 as the melting point of the iron, TS2 as the softening temperature of
the iron, TA as the temperature of the aluminum, TA1 as the melting point of the aluminum, and
TA2 as the softening temperature of the aluminum. TS1 is the highest of all and is about
1300°C to 1500°C, followed by TS2 that is lower than TS1 and is about 800°C, then TA1 is
lower than TS2 and is about 600°C, and TA2 is even lower than TA1. [0042]
When a joining electric current is passed in order to commence the Ring mash joining,
the temperatures of the iron and the aluminum start to rise at the same time. When the
temperature TS of the iron reaches a temperature suitable for the Ring mash joining, which is a
temperature falling partway between the melting point TS1 and the softening temperature TS2,
the temperature TA of the aluminum exceeds the melting point TA1 of the aluminum. Under
certain conditions, the temperature rises up to the softening temperature TS2 of the iron. [0043]
In other words, in a case where pressure and an electric current is applied in order to
join the two metals, when one of the metals (iron) is at a softening temperature suitable for
joining, the other (aluminum) has already reached the melting point. If the employed metals are
such that when one metal member is at a softening temperature suitable for joining, the other is
also at a softening temperature thereof, then there would be no problem; however, iron and
aluminum are not in such a relationship. When iron reaches the softening temperature,
aluminum will always be beyond the melting point. [0044]
As described above, since aluminum will be at or above the melting point, solid phase
joining that enables joining below the melting point cannot be achieved. In this case, aluminum
melts in the vicinity of the joint portion during joining and so the joint length cannot be extended
and also a large amount of spatter E1 occurs. Under certain conditions, although aluminum
softens and melts, iron does not soften at all and cannot undergo plastic deformation, and it is
therefore not possible to perform joining. [0045]
With reference to FIG. 5C, described will be a method for manufacturing a joined
article or a method for joining metal members, which define the embodiment of the present
invention. The left figure in FIG. 5C illustrates a state during preheating and the right figure in
FIG. 5C illustrates a state of a joining step. The graph illustrates changes in the temperatures of
the two metal members over time. 5 [0046]
The period extending from time 0 to time t1 coinciding with the commencement of the
joining step is a preheat period. The preheating carried out until time t1 results in a rise of the
temperature of the iron member up to TS4. During preheating, it is preferred that the two
members be held removed slightly from each other so that no heat transfer occurs therebetween
0 due to heat conduction. Alternatively, the corners of the two members may be in contact with
each other such that a small amount of heat conduction occurs therebetween. In this case, it is
possible to make a quick transition to the joining step following the preheating. [0047]
For the purpose of raising the temperature of the iron alone preferentially, the iron is
5 preheated through high-frequency induction heating immediately before energization in the Ring mash joining or the ring projection joining. High-frequency induction heating is a heating method in which an induction (preheat) coil is used to induce eddy current in a conductive body in contactless fashion, and the resulting Joule’s heat is used for heating. The intensity of eddy current is influenced by the magnitude of the magnetic permeability of a substance. The degree
0 of temperature rise in the aluminum as a non-magnetic substance is lower, and the iron as a
magnetic substance is heated selectively. [0048]
At the time point t1 at which preheating has been completed, a welding electric current
is passed concurrently with application of pressure, whereby the joining step is commenced.
5 Typically, pressure is applied prior to energization. In the joining step, when the temperature of the iron rises to the temperature TS3 that falls halfway between the melting point TS1 and the softening temperature TS2, the temperature of the aluminum is at the temperature TA3 that is a midpoint between the melting point TA1 and the softening temperature TA2. As illustrated in the drawing, TA3 may stay at the temperature TA1 only for a short period of time. The reason
0 therefor is that the two metal members have already settled at positions at which to be joined together. Preferably, TA3 is a temperature that is higher than the softening temperature TA of
the aluminum but is lower than the melting point TA1 thereof. [0049]
To cite an example, when the temperature of the iron has risen to about 500°C as TS4,
the resistance welding electric current may be passed so that Joule’s heat resulting from contact
resistance between the iron and the aluminum produces heat and thus the Ring mash joining or
the ring projection joining is performed. Assuming that the temperature rises due to Joule’s
heat by about +500°C for both aluminum and iron, the temperature TS3 of the iron near the
contact portion is about 1000°C whereas the temperature TA3 of the aluminum near the contact
portion is about 500°C, thus both temperatures are higher than or equal to the softening
temperatures and lower than or equal to the melting points so that solid phase joining can be
carried out. [0050]
The temperature TS4 of the iron at which to commence of the joining step is determined
in advance through experiments or calculations such that the highest temperatures of the two
metal members in the joining step both fall halfway between the melting point temperatures and
the softening temperatures thereof. The determined temperature is saved in the timing saving
unit of the control unit. The timing may also be calculated on the basis of time t1 at which the
temperature of the iron reaches an appropriate joining step commencement temperature TS4 due
to preheating. In this case, t1 is saved in the timing saving unit. [0051]
According to this embodiment, the amount of spatter E1 generated is extremely small if
any, and appropriate solid phase joining, or joining with adequate joint length, is possible. [0052]
Preferably, the first metal member E is a magnetic substance. If a magnetic substance
is employed, the efficiency of heating based on a high-frequency induced electric current is high [0053]
FIG. 5E illustrates an example where not only the first metal member E but also the
second metal member D is a magnetic substance. The second metal member D is adequately
removed from the coil 23 through which a high-frequency induced electric current flows, and in
this state, the first metal member is preheated. Due to being adequately removed, the second
metal member is not subject to preheating. The first metal member E may be an alloyed steel
and the second metal member D may be cast iron, for example. This case is also applicable to a
case where neither the first metal member nor the second metal member is a magnetic substance.
This is because a non-magnetic substance can be heated with a high-frequency electric current
despite the heating efficiency thereof being low. [0054]
With reference to FIGs. 5C and 5D, a case has been described where the first metal
member is iron and the second metal member is aluminum, but the combination of members is
not limited to this; it suffices if the second metal member D is such that the second metal
member D reaches the melting point before the first metal member E when the second metal
member D is brought into contact with the first metal member E and an electric current is applied
between the two metal members. [0055]
For example, the first metal member may have a higher melting point than the second
metal member. When the two metal members are brought into contact and an electric current is
applied thereon, the second metal member having the lower melting point more readily reaches
the melting point earlier. In such a case as well, preheating the first metal member makes it
possible to avoid a situation, such as where the temperature of the second metal member has
already exceeded the melting point when the first metal member reaches the softening
temperature. [0056]
Further, the first metal member may have a higher heat conductivity than the second
metal member. As a result of the first metal member having a higher heat conductivity, heat is
readily dissipated from the first metal member and temperature rises less readily therein than in
the second metal member. Preheating the first metal member makes it possible to avoid a
situation, such as where the temperature of the second metal member has already exceeded the
melting point when the first metal member reaches the softening temperature. [0057]
Further, the first metal member E may have a larger heat capacity than the second metal
member D. The temperature of a metal member having a larger heat capacity rises less readily.
In such a case as well, preheating the first metal member makes it possible to avoid a situation,
such as where the temperature of the second metal member has already exceeded the melting
point when the first metal member reaches the softening temperature. [0058]
With reference to the flowchart in FIG. 6, a method for manufacturing a dissimilar
metals-joined article, which defines the embodiment of the present invention, will be described.
First, the first metal member E, e.g. iron, is provided (ST1). Next, the second metal
member D, e.g. aluminum, is provided, the second metal member D reaching a melting point
before the first metal member E when the second metal member D is brought into contact with
the first metal member E and an electric current is applied between the two metal members
simultaneously (ST2). In other words, the second metal member D is a metal member that is
such that when the first metal member E reaches a temperature suitable for the solid phase
joining, the second metal member D has already reached the melting point. Next, the iron E is
preheated using a high-frequency induced electric current (ST3). Iron is a magnetic substance
and can therefore be heated efficiently using a high-frequency induced electric current. At a
timing at which the iron E has reached a prescribed temperature TS4 due to the preheating, an
electric current is applied between the iron E and the second metal member D (ST5). The
prescribed temperature TS4 is determined in advance through experiments or calculations.
Measurement of temperature enables the ascertainment of the fact that the prescribed
temperature has been reached. Measurement of temperature may be carried out using, for
example, an infrared thermometer. Alternatively, time t1 required for the temperature to reach
the prescribed temperature TS4 may be determined through experiments or calculations and be
used to control energization. Pressure is applied on the iron E and the aluminum D to join the
same (ST4). Application of pressure and application of an electric current may be commenced
simultaneously, but typically, first, the first and second metal members are brought into contact
and the positional relationship between the members is fixed, followed by application of pressure
thereon. At this time, the step of solid phase joining is not commenced yet. Then, by
commencing application of an electric current, the two metal members are solid phase joined.
In this way, it possible to carry out the joining after having fixed the positional relationship of
the first and second metal members to center the same first. [0059]
The step of preheating the first metal member may also be carried out using other
heating means, such as an annular burner configured to surround the member, for example.
The preheating based on a high-frequency induced electric current, however, is advantageous in
terms of device size reduction, shortening the preheating duration, ease of control, ease of local
heating, etc. [0060]
All references, including publications, patent applications, and patents, cited herein are
hereby incorporated by reference to the same extent as if each reference were individually and
specifically indicated to be incorporated by reference and were set forth in its entirety herein. [0061]
The use of the terms “a” and “an” and “the” and similar referents in the context of
describing the invention (especially in the context of the following claims) is to be construed to
cover both the singular and the plural, unless otherwise indicated herein or clearly contradicted
by context. The terms “comprising,” “having,” “including,” and “containing” are to be
construed as open-ended terms (i.e., meaning “including, but not limited to,”) unless otherwise
noted. Recitation of ranges of values herein are merely intended to serve as a shorthand method
of referring individually to each separate value falling within the range, unless otherwise
indicated herein, and each separate value is incorporated into the specification as if it were
individually recited herein. All methods described herein can be performed in any suitable
order unless otherwise indicated herein or otherwise clearly contradicted by context. The use of
any and all examples, or exemplary language (e.g., “such as”) provided herein, is intended
merely to better illuminate the invention and does not pose a limitation on the scope of the
invention unless otherwise claimed. No language in the specification should be construed as
indicating any non-claimed element as essential to the practice of the invention. [0062]
Preferred embodiments of this invention are described herein, including the best mode
known to the inventors for carrying out the invention. Variations of those preferred
embodiments may become apparent to those of ordinary skill in the art upon reading the
foregoing description. The inventors expect skilled artisans to employ such variations as
appropriate, and the inventors intend for the invention to be practiced otherwise than as
specifically described herein. Accordingly, this invention includes all modifications and
equivalents of the subject matter recited in the claims appended hereto as permitted by applicable
law. Moreover, any combination of the above-described elements in all possible variations
thereof is encompassed by the invention unless otherwise indicated herein or otherwise clearly
contradicted by context.
DESCRIPTION OF REFERENCE NUMERALS AND SYMBOLS
[0063]
I joining apparatus (apparatus for manufacturing a joined article)
II first electrode 12 second electrode
12P pressure application device
15 welding power source
23 induction (preheat) coil
25 high-frequency (preheat) power source
30 housing
31 opening
50 control unit
51 timing saving unit
52 controller
E first metal member
D second metal member
P pressure
ST1 providing first metal member
ST2 providing second metal member
ST3 preheating first metal member
ST4 applying pressure to first and second metals
ST5 applying electric current between first and second metal members
T temperature
TS temperature of a first metal member
TS1 melting point of a first metal member
TS2 softening temperature of a first metal member
TA temperature of a second metal member
TA1 melting point of a second metal member
TA2 softening temperature of a second metal member
t time
t2 time of start of joining process
WE CLAIM:
1. A method for manufacturing a joined article obtained by joining joint surfaces of first
5 and second metal members, the joint surface of one of the metal members being a leading end
portion-outer circumferential surface of the metal member, the other of the metal members
having a hole, the hole being defined by an inner circumferential surface of the other metal
member, the inner circumferential surface being the joint surface of the other metal member, the
method comprising:
10 providing the first metal member;
providing the second metal member, the second metal member reaching a melting point before the first metal member when the second metal member is brought into contact with the first metal member and an electric current is applied between the two metal members;
preheating the joint surface of the first metal member using a high-frequency induced 15 electric current;
applying pressure on the first metal member and the second metal member in a manner in which the leading end portion is pressed into the hole;
applying an electric current between the first metal member and the second metal member at a timing at which a temperature of the first metal member has reached a prescribed 20 temperature due to the preheating; and
joining the first and second metal members through the application of pressure and the application of an electric current.
2. A method for manufacturing a joined article, comprising:
25 providing a first metal member;
providing a second metal member, the second metal member reaching a melting point before the first metal member when the second metal member is brought into contact with the first metal member and an electric current is applied between the two metal members;
preheating the first metal member using a high-frequency induced electric current;
30 applying pressure on the first metal member and the second metal member;
applying an electric current between the first metal member and the second metal member at a timing at which a temperature of the first metal member has reached a prescribed temperature due to the preheating; and
joining the first and second metal members through the application of pressure and the 5 application of an electric current; wherein the first metal member has a higher heat conductivity than the second metal member.
3. The method for manufacturing a joined article according to claim 1 or claim 2, wherein
the first metal member is a magnetic substance.
0
4. The method for manufacturing a joined article according to any one of claims 1 to 3,
wherein the second metal member has a lower melting point than the first metal member.
5. The method for manufacturing a joined article according to any one of claims 1 to 3,
5 wherein the first metal member has a larger heat capacity than the second metal member.
6. A joining apparatus for joining joint surfaces of first and second metal members, the
joint surface of one of the metal members being a leading end portion-outer circumferential
surface of this metal member, the other of the metal members having a hole, the hole being
0 defined by an inner circumferential surface of the other metal member, the inner circumferential surface being the joint surface of the other metal member, the second metal member reaching a melting point before the first metal member when the second metal member is brought into contact with the first metal member and an electric current is applied between the two metal members, the apparatus comprising:
5 an induction coil configured to preheat the joint surface of the first metal member using
a high-frequency induced electric current;
first and second electrodes configured to apply an electric current between the first metal member and the second metal member at a timing at which a temperature of the first metal member has reached a prescribed temperature due to the preheating;
0 a pressure application device configured to apply pressure on the first metal member
and the second metal member in a manner in which the leading end portion is pressed into the hole; and
a control unit configured to perform control according to which the application of an electric current based on the high-frequency induced electric current and the application of 5 pressure by the pressure application device are carried out at timings set in accordance with material characteristics of the first metal member and the second metal member.
| # | Name | Date |
|---|---|---|
| 1 | 201947037406.pdf | 2019-09-17 |
| 2 | 201947037406-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [17-09-2019(online)].pdf | 2019-09-17 |
| 3 | 201947037406-STATEMENT OF UNDERTAKING (FORM 3) [17-09-2019(online)].pdf | 2019-09-17 |
| 4 | 201947037406-REQUEST FOR EXAMINATION (FORM-18) [17-09-2019(online)].pdf | 2019-09-17 |
| 5 | 201947037406-PROOF OF RIGHT [17-09-2019(online)].pdf | 2019-09-17 |
| 6 | 201947037406-PRIORITY DOCUMENTS [17-09-2019(online)].pdf | 2019-09-17 |
| 7 | 201947037406-FORM 18 [17-09-2019(online)].pdf | 2019-09-17 |
| 8 | 201947037406-FORM 1 [17-09-2019(online)].pdf | 2019-09-17 |
| 9 | 201947037406-DRAWINGS [17-09-2019(online)].pdf | 2019-09-17 |
| 10 | 201947037406-DECLARATION OF INVENTORSHIP (FORM 5) [17-09-2019(online)].pdf | 2019-09-17 |
| 11 | 201947037406-COMPLETE SPECIFICATION [17-09-2019(online)].pdf | 2019-09-17 |
| 12 | 201947037406-CLAIMS UNDER RULE 1 (PROVISIO) OF RULE 20 [17-09-2019(online)].pdf | 2019-09-17 |
| 13 | 201947037406-FORM-26 [19-09-2019(online)].pdf | 2019-09-19 |
| 14 | Correspondence by Agent_Form-1,Power of Attorney_01-10-2019.pdf | 2019-10-01 |
| 15 | 201947037406-FORM 3 [20-02-2020(online)].pdf | 2020-02-20 |
| 16 | 201947037406-FORM-9 [18-05-2020(online)].pdf | 2020-05-18 |
| 17 | 201947037406-FORM 18A [19-05-2020(online)].pdf | 2020-05-19 |
| 18 | 201947037406-EVIDENCE OF ELIGIBILTY RULE 24C1j [19-05-2020(online)].pdf | 2020-05-19 |
| 19 | 201947037406-FER.pdf | 2020-07-15 |
| 20 | 201947037406-certified copy of translation [28-09-2020(online)].pdf | 2020-09-28 |
| 21 | 201947037406-FORM 3 [02-11-2020(online)].pdf | 2020-11-02 |
| 22 | 201947037406-OTHERS [16-12-2020(online)].pdf | 2020-12-16 |
| 23 | 201947037406-Information under section 8(2) [16-12-2020(online)].pdf | 2020-12-16 |
| 24 | 201947037406-FER_SER_REPLY [16-12-2020(online)].pdf | 2020-12-16 |
| 25 | 201947037406-DRAWING [16-12-2020(online)].pdf | 2020-12-16 |
| 26 | 201947037406-COMPLETE SPECIFICATION [16-12-2020(online)].pdf | 2020-12-16 |
| 27 | 201947037406-CLAIMS [16-12-2020(online)].pdf | 2020-12-16 |
| 28 | 201947037406-ABSTRACT [16-12-2020(online)].pdf | 2020-12-16 |
| 29 | 201947037406-PatentCertificate25-12-2020.pdf | 2020-12-25 |
| 30 | 201947037406-IntimationOfGrant25-12-2020.pdf | 2020-12-25 |
| 31 | 201947037406-RELEVANT DOCUMENTS [09-09-2022(online)].pdf | 2022-09-09 |
| 32 | 201947037406-RELEVANT DOCUMENTS [03-07-2023(online)].pdf | 2023-07-03 |
| 1 | SearchStrategy201947037406E_14-07-2020.pdf |