Sign In to Follow Application
View All Documents & Correspondence

Modular Configuration Of Launch Vehicle System

Abstract: 16 ABSTRACT MODULAR CONFIGURATION OF LAUNCH VEHICLE SYSTEM The present invention relates to a modular configuration of the launch vehicle system. More specifically, it relates to the modular configuration technology developed to optimise the launch vehicle with respect to the number of engines in the lower stage or the number of stages itself in order to get a most efficient launch possible for a particular payload being launched. In the present invention the vehicle is such that the modularity is passed down to sub-system level which thereby reduces the mass of unused components and the modifiable cluster can be used as a booster unit to carry heavier payloads to higher orbits. Depending upon the mass of the payload to be carried to a particular orbit, either the number of stages or the number of engines, are either attached or removed from the vehicle and thus increasing the efficiency of the trajectory. The present invention reduces the time and cost involved in reconfiguration as well. Fig. 1

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
02 September 2021
Publication Number
04/2023
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
ipr@puthrans.com
Parent Application
Patent Number
Legal Status
Grant Date
2024-03-13
Renewal Date

Applicants

Agnikul Cosmos Private Limited
910, Syndicate Bank Colony, Anna Nagar West Extension, Chennai - 600101, Tamil Nadu, India.

Inventors

1. Syed Peer Mohamed Shah Khadri
No. 910, Syndicate bank Colony, Anna Nagar West Extension Chennai – 600101,Tamil Nadu, India.
2. Srinath Ravichandran
No. 910, Syndicate bank Colony, Anna Nagar West Extension Chennai – 600101,Tamil Nadu, India.

Specification

WE CLAIM:

1. Modular configuration of launch vehicle system characterized by:
cluster of engines consisting of 7 engines (101, 102, 103, 104), placed in a
certain configuration to be able to perform all necessary manoeuvres to reach the orbit with the least amount of energy;
a 3-stage vehicle to carry higher payload (200);
strapon boosters to the launch vehicle (400, 500);
engine control hardware for removing one or more engines; and
pump motors.
2. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
clustered engine configuration involves removing one or more engines to make the
vehicle efficient according to the particular mission, keeping other system level
components intact.
3. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
3-stage vehicle (200) essentially consist of adding the first stage of the vehicle (400) as
side boosters.
4. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
payload involves changes to its attached system level components such as engines and
stages, and to its sub system levels such as plumbing lines, computers and other
electronic hardware.
5. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
strapon boosters are added to the launch vehicle and added up to six strapon boosters
along with a core booster stage (500).
6. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said 30
system consists of a maximum of 49 engines in the booster stage, the cluster of engines
may exhibit various combinations depending on the payload mass and be able to
perform all necessary manoeuvres to reach the desired orbit with the least amount of
energy.
7. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
strapon boosters in the booster stage involves removing one or more engines from any
of the strapon boosters or the core booster itself to make the vehicle best suited to the
payload and the orbit for the particular mission.
8. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
engine control hardware consists of two modules that will perform all the engine
functions such as ignition, shutdown, mixture ratio control and thrust vector control for
gimbaling.
9. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
electronic hardware is specific for an engine, which results in no redundant hardware
left on the vehicle when a particular engine is removed.
10. Modular configuration of launch vehicle system as claimed in claim 1 wherein the said
pump motors are controlled by a separate electronics module and reported to the engine
control module.

Documents

Orders

Section Controller Decision Date
43 Samir Kumar Choudhary 2024-03-13
43 Samir Kumar Choudhary 2024-03-13

Application Documents

# Name Date
1 202141039671-STATEMENT OF UNDERTAKING (FORM 3) [02-09-2021(online)].pdf 2021-09-02
2 202141039671-POWER OF AUTHORITY [02-09-2021(online)].pdf 2021-09-02
3 202141039671-FORM FOR STARTUP [02-09-2021(online)].pdf 2021-09-02
4 202141039671-FORM FOR SMALL ENTITY(FORM-28) [02-09-2021(online)].pdf 2021-09-02
5 202141039671-FORM 1 [02-09-2021(online)].pdf 2021-09-02
6 202141039671-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [02-09-2021(online)].pdf 2021-09-02
7 202141039671-EVIDENCE FOR REGISTRATION UNDER SSI [02-09-2021(online)].pdf 2021-09-02
8 202141039671-DRAWINGS [02-09-2021(online)].pdf 2021-09-02
9 202141039671-DECLARATION OF INVENTORSHIP (FORM 5) [02-09-2021(online)].pdf 2021-09-02
10 202141039671-COMPLETE SPECIFICATION [02-09-2021(online)].pdf 2021-09-02
11 202141039671-Proof of Right [02-03-2022(online)].pdf 2022-03-02
12 202141039671-Correspondence And Form-1_04-03-2022.pdf 2022-03-04
13 202141039671-FORM-9 [14-09-2022(online)].pdf 2022-09-14
14 202141039671-STARTUP [16-09-2022(online)].pdf 2022-09-16
15 202141039671-FORM28 [16-09-2022(online)].pdf 2022-09-16
16 202141039671-FORM 18A [16-09-2022(online)].pdf 2022-09-16
17 202141039671-Request Letter-Correspondence [03-10-2022(online)].pdf 2022-10-03
18 202141039671-Power of Attorney [03-10-2022(online)].pdf 2022-10-03
19 202141039671-FORM28 [03-10-2022(online)].pdf 2022-10-03
20 202141039671-Covering Letter [03-10-2022(online)].pdf 2022-10-03
21 202141039671-CERTIFIED COPIES TRANSMISSION TO IB [03-10-2022(online)].pdf 2022-10-03
22 202141039671-FER.pdf 2023-02-16
23 202141039671-FORM 3 [22-02-2023(online)].pdf 2023-02-22
24 202141039671-Defence-21-03-2023.pdf 2023-03-21
25 202141039671 Reply from Defence.pdf 2023-07-10
26 202141039671-Retyped Pages under Rule 14(1) [16-08-2023(online)].pdf 2023-08-16
27 202141039671-OTHERS [16-08-2023(online)].pdf 2023-08-16
28 202141039671-FER_SER_REPLY [16-08-2023(online)].pdf 2023-08-16
29 202141039671-DRAWING [16-08-2023(online)].pdf 2023-08-16
30 202141039671-CORRESPONDENCE [16-08-2023(online)].pdf 2023-08-16
31 202141039671-ABSTRACT [16-08-2023(online)].pdf 2023-08-16
32 202141039671-2. Marked Copy under Rule 14(2) [16-08-2023(online)].pdf 2023-08-16
33 202141039671-PatentCertificate13-03-2024.pdf 2024-03-13
34 202141039671-IntimationOfGrant13-03-2024.pdf 2024-03-13
35 202141039671-FORM 4 [05-07-2024(online)].pdf 2024-07-05
36 202141039671-Information under section 8(2) [05-09-2024(online)].pdf 2024-09-05
37 202141039671-Information under section 8(2) [05-09-2024(online)]-1.pdf 2024-09-05

Search Strategy

1 202141039671E_08-02-2023.pdf

ERegister / Renewals

3rd: 08 Jul 2024

From 02/09/2023 - To 02/09/2024

4th: 08 Jul 2024

From 02/09/2024 - To 02/09/2025

5th: 23 Jan 2025

From 02/09/2025 - To 02/09/2026

6th: 23 Jan 2025

From 02/09/2026 - To 02/09/2027

7th: 23 Jan 2025

From 02/09/2027 - To 02/09/2028

8th: 23 Jan 2025

From 02/09/2028 - To 02/09/2029

9th: 23 Jan 2025

From 02/09/2029 - To 02/09/2030

10th: 23 Jan 2025

From 02/09/2030 - To 02/09/2031

11th: 23 Jan 2025

From 02/09/2031 - To 02/09/2032

12th: 23 Jan 2025

From 02/09/2032 - To 02/09/2033

13th: 23 Jan 2025

From 02/09/2033 - To 02/09/2034

14th: 23 Jan 2025

From 02/09/2034 - To 02/09/2035

15th: 23 Jan 2025

From 02/09/2035 - To 02/09/2036

16th: 23 Jan 2025

From 02/09/2036 - To 02/09/2037

17th: 23 Jan 2025

From 02/09/2037 - To 02/09/2038

18th: 23 Jan 2025

From 02/09/2038 - To 02/09/2039

19th: 23 Jan 2025

From 02/09/2039 - To 02/09/2040

20th: 23 Jan 2025

From 02/09/2040 - To 02/09/2041