Sign In to Follow Application
View All Documents & Correspondence

Positive Electrode Active Material For Secondary Battery, Method For Preparing Same, Free Standing Film Comprising Same, Dry Positive Electrode, And Secondary Battery Comprising Dry Positive Electrode

Abstract: According to an embodiment of the present invention, provided are: a positive electrode active material, which is a positive electrode active material for a secondary battery and comprises lithium transition metal oxide particles, an amorphous carbon-based coating layer formed in the form of a film on the surfaces of the lithium transition metal oxide particles, and a carbon nanotube coating layer formed on the amorphous carbon-based coating layer; a method for preparing same; a free-standing film comprising same; a dry positive electrode; and a secondary battery comprising the dry positive electrode.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
03 April 2023
Publication Number
47/2023
Publication Type
INA
Invention Field
CHEMICAL
Status
Email
Parent Application

Applicants

LG ENERGY SOLUTION, LTD.
Tower 1, 108, Yeoui-daero, Yeongdeungpo-gu, Seoul 07335

Inventors

1. KIM, Jeonggil
LG ENERGY SOLUTION Research Park, 188, Munji-ro, Yuseong-gu, Daejeon 34122
2. KIM, Taegon
LG ENERGY SOLUTION Research Park, 188, Munji-ro, Yuseong-gu, Daejeon 34122
3. KIM, Myeongsoo
LG ENERGY SOLUTION Research Park, 188, Munji-ro, Yuseong-gu, Daejeon 34122

Specification

Documents

Application Documents

# Name Date
1 202317025363.pdf 2023-04-03
2 202317025363-STATEMENT OF UNDERTAKING (FORM 3) [03-04-2023(online)].pdf 2023-04-03
3 202317025363-PROOF OF RIGHT [03-04-2023(online)].pdf 2023-04-03
4 202317025363-POWER OF AUTHORITY [03-04-2023(online)].pdf 2023-04-03
5 202317025363-FORM 1 [03-04-2023(online)].pdf 2023-04-03
6 202317025363-DRAWINGS [03-04-2023(online)].pdf 2023-04-03
7 202317025363-DECLARATION OF INVENTORSHIP (FORM 5) [03-04-2023(online)].pdf 2023-04-03
8 202317025363-COMPLETE SPECIFICATION [03-04-2023(online)].pdf 2023-04-03
9 202317025363-FORM 3 [06-09-2023(online)].pdf 2023-09-06
10 202317025363-FORM 18 [03-06-2024(online)].pdf 2024-06-03