Sign In to Follow Application
View All Documents & Correspondence

Power Converter

Abstract: A power converter with a simple configuration capable of controlling a rush current is provided. The power converter is installed between an electric power system and a power storage device, includes a harmonic filter in an AC circuit on the electric power system side and a DC capacitor and a DC breaker in a DC circuit on the power storage device side, and performs AC/DC conversion processing using an inverter. The power converter is configured in such a way that, when the power storage device starts running, a current limited by a limiting resistor is given from the electric power system side to the DC capacitor, the difference between the voltage of the DC capacitor and the voltage of the power storage device is monitored, and the power converter is connected to the power storage device by switching on the DC breaker on the basis of the difference.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
21 May 2015
Publication Number
18/2016
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
Parent Application
Patent Number
Legal Status
Grant Date
2023-10-10
Renewal Date

Applicants

Hitachi, Ltd.
6-6, Marunouchi 1-chome, Chiyoda-ku, Tokyo 100-8280, Japan

Inventors

1. ABE Yusuke
c/o Hitachi, Ltd., 6-6, Marunouchi 1-chome, Chiyoda-ku, Tokyo 100-8280, Japan
2. ITO Tomomichi
c/o Hitachi, Ltd., 6-6, Marunouchi 1-chome, Chiyoda-ku, Tokyo 100-8280, Japan
3. TANIGUCHI Masahiro
c/o Hitachi, Ltd., 6-6, Marunouchi 1-chome, Chiyoda-ku, Tokyo 100-8280, Japan

Specification

POWER CONVERTER
FIELD OF THE INVENTION The present invention relates to a power converter that is interconnected between an electric power system and a storage battery and performs AC-DC conversion, and more particularly relates to a power converter that includes a capacitor as a part of the power converter itself and an appropriate function for initially charging the capacitor.
BACKGROUND OF THE INVENTION
In recent years, distributed power sources utilizing natural energies and power storage systems including power storage means represented by a storage battery have been widely introduced. These distributed power sources and power storage systems internally include power storage devices and store electric power in the form of DC power. Electric power stored in a power storage device is converted into AC electric power having an interconnected power system frequency by a self commutated power converter, and sent out to the electric power system. In addition, power supplied by the electric power system is converted into DC electric power by the self commutated power converter, and stored in the power storage device.
A self commutated power converter includes an inverter

that performs AC/DC conversion and a DC circuit, and the DC circuit includes a capacitor. Furthermore, a DC breaker is disposed between a distributed power source or a power storage system and the self commutated power converter, and while the self commutated power converter is in a halt state, the DC breaker is opened.
When the DC breaker is switched on and the distributed power source and the power storage system are connected to the self commutated power converter at the time when the self commutated power converter starts running, an excessive rush current is induced in the capacitor of the DC circuit, which could lead to the damages to these devices. This rush current arises owing to the potential difference between the voltage of the inverter side of the capacitor and the voltage of the distributed power source or the voltage of the power storage device of the power storage system, and the larger the potential difference between both terminals is, the larger the rush current is.
As one of measures against the above problem owing to the initial charging of the capacitor, Japanese Unexamined Patent Application Publication No. Hei8(1996)-126339 discloses a technique in which a switch and an electromagnetic switch having a resistor, both of which are connected in series , are disposed between a distributed power source or a power storage system and a self commutated power converter. The

switch is switched on at the time when the self commutated power converter starts running, and the distributed power source or the power storage system is connected to the self commutated power converter via the resistor, and subsequently the electromagnetic switch having the resistor are switched on. Therefore, when the switch is switched on, a current limited by the resistor flows through the capacitor, which decreases the potential difference between both terminals, with the result that an excessive rush current can be prevented from occurring.
According to Japanese Unexamined Patent Application Publication No. Hei8(1996)-126339, although it is possible to decrease the potential difference between both terminals using a limiting resistor, it is necessary to install a switch and an electromagnetic switch having a resistor, therefore there arises a problem in that the number of necessary parts are increased, and the power converter grows larger and more complex.
SUMMARY OF THE INVENTION
The present invention was achieved with the
above-mentioned problem in mind, and one of the objects of the
present invention is to provide a power converter with a simple
configuration that is capable of controlling a rush current.
In order to solve the above problem, a power converter

according to the present invention is installed between an electric power system and a power storage device, includes a harmonic filter in an AC circuit on the electric power system side and a DC capacitor and a DC breaker in a DC circuit on 5 the power storage device side, and performs AC/DC conversion using an inverter. In addition, the power converter is configured in such a way that, when the power storage device starts running, a current limited by a limiting resistor is given from the electric power system side to the DC capacitor,
10 the inverter is controlled so that the difference between the voltage of the DC capacitor and the voltage of the power storage device decreases after the starting of inverter's switching, the difference between the voltage of the DC capacitor and the voltage of the power storage device is monitored, and the power
15 converter is connected to the power storage device by switching
on the DC breaker on the basis of the monitored difference.
In the power converter according to the present invention,
because the above limited current is applied to the DC capacitor,
the difference between the voltage of the capacitor and the
20 voltage of the power storage device is monitored, and the power converter is connected to the power storage device on the basis of the monitored difference, a rush current, which could occur in the start process from the time when the DC capacitor is initially charged and to the time when the power converter is
25 connected to the power storage device, can be prevented from

occurring. In particular, it is possible to control the rush current using the simple configuration of the power converter.
BRIEF DESCRIPTION OF THE DRAWINGS
Fig. 1 is a diagram showing the outline configuration of a power converter according to a first embodiment of the present invention;
Fig. 2 is a diagram showing an example of an inverter and an example of a harmonic filter both of which are adaptable to the first embodiment;
Fig. 3 is a diagram showing a timing chart during the start time period of the power converter;
Fig. 4 is a diagram showing a configuration example of a sequence processing unit in a controller;
Fig. 5 is a diagram showing a configuration example of a gate signal calculation unit in the controller;
Fig. 6 is a diagram showing the outline configuration of a power converter according to a second embodiment of the present invention;
Fig. 7 is a diagram showing the outline configuration of a power converter according to a third embodiment of the present invention;
Fig. 8 is a diagram showing a modification example of the third embodiment shown in Fig. 7; and
Fig. 9 is a diagram showing a configuration example of

a sequence processing unit in a controller according to the third embodiment of the present invention.
DETAILED DESCRIPTION OF THE PREFFERED EMBODIMENTS Embodiments of the present invention will be described in detail with reference to the accompanying drawings hereinafter. First Embodiment
Fig. 1 is a diagram showing the outline configuration of a power converter according to a first embodiment of the present invention. Fig. 1 shows an AC electric power system G and a power storage device Bt that is included in a distributed power source or a power storage system. The power converter 1 is shown by being surrounded with a dashed line, and it includes a main circuit section lA and a control unit IB. The main circuit section lA may be referred to as a power converter in some cases.
The main circuit section lA includes an inverter INV as a main component, and AC/DC conversion and frequency conversion are performed in this main circuit section lA. A DC circuit is formed on the power storage device Bt side of the inverter INV, and the DC circuit includes a DC breaker CBd. The DC breaker CBd is switched on when it is judged that charging a DC capacitor inside the inverter INV is completed, wherein the inverter INV in Fig. 2 will be described later.

An AC circuit is formed on the electric power system G side of the inverter INV, and the AC circuit includes a harmonic filter F for smoothing. The harmonic filter F is used for decreasing the amount of a harmonic current that flows out from the inverter INV to the electric power system G. Furthermore, the AC circuit includes an AC switch Swa and a series circuit composed of an initial charging resistor Rs and an initial charging switch Sws, wherein the series circuit is connected to the AC switch Swa in parallel. The initial charging resistor Rs is used for preventing an excessive rush current from flowing into a filter capacitor FC included in the harmonic filter F and the DC capacitor CD in the inverter INV when the filter capacitor FC and the DC capacitor CD are initially charged, wherein the filter capacitor FC and the DC capacitor CD will be shown later in Fig. 2. In addition, the initial charging switch Sws is used in order for the above capacitors to be initially charged with currents flowing through the initial charging resistor Rs when the power converter starts running.
A controller C in the control unit IB takes in current signals and voltage signals from various places of the main circuit section lA in order to give control signals to various places of the main circuit section lA. These are interconnection point voltages (a line voltage VSUV, a line voltage VSVW) taken in from voltage detectors PT on the electric

power system G side, inverter output currents ISU and ISW taken in from inverter output current detectors CTI, a DC voltage VDC taken in from a DC voltage detector PTd installed in the DC circuit, a storage battery voltage VDB taken in from a battery voltage detector PTb, and the like.
Furthermore, the controller C in the control unit IB gives the control signals S to various places of the main circuit section lA as results of judgment and calculation processing using the above input. These are an ON/OFF command SI to the initial charging switch Sws, an ON/OFF command S2 to the AC switch Swa, an ON/OFF command S3 to the DC breaker CBd, and a gate signal S4 to the inverter INV, and the like.
Fig. 2 is a diagram showing an example of the inverter INV and an example of the harmonic filter F both of which are adaptable to the first embodiment. The harmonic filter F of these two components includes a filter reactor FL that is a three-phase reactor, and the filter capacitor FC that is a three-phase capacitor, and the harmonic filter prevents a harmonic current, which is generated in the inverter INV, from flowing out to the electric power system G. Here, the filter capacitor FC is initially charged with an AC current flowing through the initial charging resistor Rs.
The inverter INV, which is adaptable to the first embodiment, includes the DC capacitor CD and six IGBT modules IGBT. The inverter INV outputs a three-phase AC voltage, and

two IGBT modules IGBT connected in series provide a circuit for one phase component of the three-phase AC voltage. The DC capacitor CD is provided on the DC side of the inverter INV, and a voltage across the capacitor CD is an inverter DC voltage . 5 An IGBT module IGBT is a module including an IGBT and a diode both of which are connected in antiparallel to each other. In the configuration shown in Fig. 2, the voltage across the DC capacitor CD is the inverter DC voltage. The DC capacitor CD is initially charged with a current flowing
10 through the initial charging resistor Rs, the filter reactor FL, and diodes included in the IGBT modules IGBT. After the inverter INV starts running, the DC capacitor CD is charged by the AC power G in accordance with voltage control performed on the basis of the calculation by the controller C until the
15 difference between the storage battery voltage VDB and the voltage across the DC capacitor CD becomes a predefined value. The IGBT modules IGBT are off before the AC switch Swa is switched on, and the inverter INV switches on and off in accordance with reception of the gate signal S4 transmitted
20 from the controller C. After the AC switch SWa is turned on, the inverter INV is controlled by the gate signal S4 that is output from the controller C in such a way that the DC voltage VDC falls within a predefined range, and the IGBT modules IGBT become in an operating state.
25 Fig. 3 shows a timing chart during the start time period

10
of the power converter according to the first embodiment of the present invention shown in Fig. 1 and Fig. 2. This timing chart shows the operational sequence of switching means such as breakers and switches, the start timing of the converter 5 during a time period from the halt state to the initial charging, and the DC voltage VDC across the DC capacitor CD obtained through the above operational sequence.
In the start sequence of the present invention, an AC breaker (not shown) is switched on manually at the time tO first.
10 Here, the AC breaker is disposed on the electric power system side of the main circuit section lA. In addition, at the time to, the switching means such as the AC switch Swa, the initial charging switch Sws, and the DC breaker CBd are in their open states respectively, and the gate signal S4 has not been applied
15 to the inverter INV yet.
Initial charging during the start time period of the power converter is started by switching on the initial charging switch Sws at the time tl. As a result, a circuit route from the initial charging switch Sws to the DC capacitor CD via the
20 initial charging resistor Rs, the harmonic filter F for
smoothing, and the IGBTs (the antiparallel diodes) inside the inverter INV is formed, and the DC voltage VDC across the DC capacitor CD gradually increases owing to the current limited by the initial charging resistor Rs.
25 The initial charging switch Sws is opened at the time

11
t2 when the DC voltage VDC reaches an initial charging completion threshold voltage . Subsequently, the AC switch Swa is switched on instead at the time t3 just after the time t2 . As a result, a circuit route from the AC switch Swa to the DC 5 capacitor CD via the harmonic filter F for smoothing and IGBTs inside the inverter INV is successively formed. Furthermore, at the time t4 just after the time t3, the gate signal S4 begins to be applied to the inverter INV. During the time period of this series of changing-over operations, the DC voltage VDC
10 across the DC capacitor CD slightly increases.
With regard to the sequence operation after the time t4, a means for preventing an excessive current at the time of switching on the DC breaker from occurring, which is a novel aspect of the present invention, will be described. After the
15 time t4, the DC voltage VDC across the DC capacitor CD is controlled by the gate signal S4 input into the inverter INV. In inverter control at this time, the voltage of the storage battery Bt (storage battery voltage VDB) is measured, and the voltage control is performed with a switch-on threshold
20 voltage of the DC breaker CBd, which is set to be a little lower than the storage battery voltage VDB, used as a target. To put it concretely, the voltage control is performed with a DC voltage command value set as the storage battery voltage VDB. This control is continued during the time period from the time
25 t4 to the time t5 when the DC voltage VDC reaches the switch-on

12
threshold voltage of the DC breaker CBd, and when the DC voltage VDC reaches the switch-on threshold voltage, the DC breaker CBd is switched on. As a result, the difference between the DC voltage VDC of the DC capacitor CD and the storage battery 5 voltage VDB becomes a very little, which prevents an excessive current owing to the switching-on of the DC breaker CBd from occurring. At the time t6 after the DC breaker CBd is switched on, the control by the inverter INV is performed so that the electric power system G freely accommodates the power storage
10 device with electric power and vice versa.
The controller C shown in Fig. 1 includes a sequence processing unit and a gate signal calculation unit inside in order to execute the control operation shown in Fig. 3. Fig. 4 is a diagram showing a configuration example of the sequence
15 processing unit Seq of these two units. The function of the sequence processing unit Seq is performed by an initial charging calculation unit Seql that performs processing during a time period from the time tl to the time t3 shown in Fig. 3 (an initial charging time period during which charging is
20 performed via the initial charging resistor Rs), and by a charging calculation unit Seq2 that performs processing during a time period from the time t4 to the time t5 shown in Fig. 3 (a time period after the AC switch Swa is switched on. In the initial charging calculation unit Seql, the
25 switch-on of the AC breaker is detected by an AC breaker

13
switch-on detection unit bl first, and then a switch-on signal SION of the initial charging switch Sws is output. In addition, the initial charging calculation unit Seql monitors the DC voltage VDC, and when the DC voltage VDC reaches the initial 5 charging completion threshold voltage shown in Fig. 3, a DC voltage judgment unit b2 outputs a detection flag. A switching control signal calculation unit b3 issues a switch-off command SIOFF in response to the detection flag to switch off the initial charging switch Sws, and successively issues a
10 switch-on command S20N to the AC switch Swa.
In the charging calculation unit Seq2, after the switch-on command S20N to the AC switch Swa is received, the inverter control is performed with the switch-on threshold voltage of the DC breaker CBd used as a target. In order for
15 the voltage control to be performed, the DC voltage VDC across the DC capacitor CD and the storage battery voltage VDB are taken in by the initial charging calculation unit Seql on a steady basis, and the voltage difference between these voltages is calculated by a subtracter b4. The
20 above-mentioned gate signal calculation unit includes a
voltage command calculator b8 and a gate signal calculator b6. Although the concrete processing contents performed by this gate signal calculation unit will be explained later with reference to Fig. 5, to put it briefly, the gate signal S4 is
25 given to the inverter INV in such a way that the DC voltage

14
VDC may gradually increase to the storage battery voltage. Furthermore, the voltage command calculator b8 takes in the interconnection point voltages and the converter output currents in order to control the inverter INV. 5 In addition, the voltage difference between the DC voltage VDC of the DC capacitor CD and the storage battery voltage VDB is input into a voltage judgment unit b5, and the detection flag is output by the voltage judgement unit b5 in comparison with the switch-on threshold voltage of the DC
10 breaker CBd when the DC voltage VDC reaches the switch-on threshold voltage. The breaker control signal calculation unit b7 issues a switch-on command S30N to the DC breaker CBd in response to the detection flag in order to switch on the DC breaker CBd. In the operation of the sequence processing
15 unit Seq hereinafter, the control by the inverter INV is performed so that the electric power system freely accommodates the power storage device with electric power and vice versa. In the above description, the initial charging means an operation in which the capacitor is charged with a
20 current flowing through the initial charging resistor Rs. Fig. 5 shows an example of a typical gate signal calculation unit. Because this configuration is well-known in inverter control technology, the explanation regarding this configuration will be made briefly.
25 In Fig. 5, a reference numeral 10 0 denotes a phase voltage

15
calculator, and the phase voltage calculator 100 calculates
phase voltages (VSU, VSV, andVSW) from the line voltages (VSUV,
VSVW) detected by the interconnection point voltage detectors
PT shown in Fig. 1. The output of the phase voltage calculator
5 100 is input into an a-P converter 101 and phase calculator
104. The a-p converter 101 converts the phase voltages (VSU,
VSV, and VSW) into an a component and a P component. The outputs
of the a-p converter 101 are input into a d-q converter 102.
On the other hand, the phase calculator 104 calculates
10 interconnection point voltage phases from the connection point
phase voltages (VSU, VSV, and VSW) . On the other hand, the
outputs of the phase calculator 104 are input into the d-q
converter 102 , a d-q converter 107 , and an inverse d-q converter
115. The d-q converter 102 takes in the interconnection point
15 voltage a component, the interconnection point voltage p
component, and the interconnection point voltage phases that are outputs from the phase calculator 104, and converts the interconnection point voltages into a d-axis component and a q-axis component. The outputs of the d-q converter 102 are
20 input into a power calculator 109. Through the above
processing, the main circuit voltages are converted from three-phase components into two-phase components, and then the two-phase components are converted into d-q axis components. In Fig. 5, a reference numeral 105 denotes a subtracter,
25 and the subtracter 105 takes in the converter output currents

16
ISU and ISW from the inverter output current detector CTI shown in Fig. 1. The subtracter 105 also calculates a V phase current ISV by supposing that the zero phase component in the inverter
output current is zero. Although an a-[3 converter 106 converts 5 the main circuit currents from three-phase components into two-phase components, and then the d-q converter 107 converts the two-phase components into d-q axis components, explanations regarding these converters will be omitted.
In addition, the voltage difference VDCDEF between the
10 DC voltage VDC across the DC capacitor CD and the storage battery voltage VDB shown in Fig. 4 is taken in for the processing in Fig. 5. A DC voltage control unit 108 takes in the difference between the storage battery voltage and the DC voltage, and outputs an active current command value IDREF.
15 The output IDREF is input into a subtracter 112 via a changing-over switch to be described later.
Furthermore, the power calculator 109 receives the d-axis component and q-axis component of the interconnection point voltages and those of the output currents, and outputs
20 an active power PS and a reactive power QS. The output active power PS of the power calculator 109 is input into a subtracter 117, and the output reactive power QS is input into a subtracter 110. On receiving a reactive power command value QREF and a reactive power QS from the power calculator 109, the subtracter
25 110 outputs a reactive power difference. On receiving the

17
reactive power difference, a reactive power control unit 111 outputs a reactive current command value IQREF. The output IQREF is input into a subtracter 113.
On receiving the output current d-axis component and the 5 active current command value, the subtracter 112 outputs a difference IDDEF. The output difference IDDEF is input into a current controller 114. Furthermore, on receiving the output current q-axis component and the reactive current command value IQREF, the subtracter 113 outputs a difference
10 IQDEF. The output difference IQDEF is input into the current controller 114.
According to the control shown in Fig. 5, as described above, the current controller 114 obtains the difference IDDEF from the subtracter 112 and the difference IQDEF from the
15 subtracter 113, calculates a d-axis voltage command value VDREF from the obtained difference IDDEF and a q-axis voltage command value VQREF from the obtained difference IQDEF, and outputs both d-axis voltage command value VDREF and q-axis voltage command value VQREF. The output command values are
20 input into the inverse d-q converter 115. The inverse d-q converter 115 receives the voltage command value d-axis component VDREF, the voltage command value q-axis component VQREF, and the interconnection point voltage phases, and converts the voltage command value into an a component and a
25 P component. Subsequently, a two-phase-to-three-phase

converter 116 converts the voltage command value a component and the voltage command value p component into a three-phase voltage command value VREF. The output(VREF) from the two-phase-to-three-phase converter 116 is input into the 5 inverter INV as a gate signal S4 via the gate signal calculator b6 in Fig. 4.
Although the above description has been made about the control sequence to the time when the power storage device is interconnected, wherein the DC voltage control unit 108
10 calculates the active current command value IDREF, and performs output voltage control, an operation mode changing-over switch 119 is changed over in accordance with a DC breaker on-off state signal CB_Ans after the DC breaker CBd is switched on. At this time, an active power command value
15 PREF transmitted from the upper level system and the output active power PS from the power calculator 109 are input into a subtracter 117, and the subtracter 117 outputs an active power difference. An active power control unit 118 receives the active power difference, and outputs the active current
2 0 command value IDREF. In the case of the normal operation of the power converter 1, the active power control unit 118 calculates the active current command value IDREF, and performs output voltage control.
According to the first embodiment of the present
25 invention that has been described so far, because the limited

current is applied to the DC capacitor, the difference between the voltage of the capacitor and the voltage of the storage battery is monitored, and the power converter is connected to the power storage device on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge to the connection of the power storage device, can be prevented from occurring. Second Embodiment
In the case of a second embodiment shown in Fig. 6, a start circuit is used for a main circuit configuration for applying a limited current to a capacitor. While the first embodiment includes the AC switch Swa and the series circuit of the initial charging resistor Rs and the initial charging switch Sws, wherein the series circuit is disposed parallel to the AC switch Swa, the start circuit is used in the second embodiment instead of this combination of the AC switch Swa, the initial charging resistor Rs and the initial charging switch Sws.
The start circuit is a series circuit formed between an electric power system G and a DC capacitor CD and a circuit route formed by this series circuit does not pass through an inverter. An AC switch Swa, a transformer TR, a rectifier SR, and an initial charging resistor Rs are disposed in the series circuit as the start circuit in this order from the electric power system G side. Because a start control technique in the

case of the configuration of this second embodiment is the same as in the case of the configuration of the first embodiment, explanations thereof will be omitted.
According to the second embodiment of the present invention that has been described so far, because the limited current is applied to the capacitor, the difference between the voltage of the capacitor and the voltage of the storage battery is monitored, and the connection of the power storage device is performed on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge to the connection of the power storage device, can be prevented from occurring. In addition, there is such an advantage that the inverter can be started without introducing an over modulation by adjusting the turn ratio of the transformer TR. Particularly, in the case where there is an existing start circuit, the power converter according to this embodiment can be realized without installing new incidental facilities. Third Embodiment
In the case of a third embodiment shown in Fig. 7, a power storage device Bt that is a target to which the present invention is applied comprises a battery unit BTU.
In an example shown in Fig. 7, two storage batteries BTl and BT2 are used in the state of being connected to each other in parallel via battery breakers CBbl and CBb2 . Because there

is a possibility that both individual operation of each storage battery and combined operation of the two storage batteries are required, the battery unit BTU is configured in such a way that the voltage of each storage battery can be detected. Battery voltage detectors PTbl and PTb2 detect the terminal voltages of the storage batteries BTl and BT2 respectively, and a battery management unit BMU monitors the terminal voltages. The detected voltages are transmitted to a controller C by the battery management unit BMU so as to be used for the start control or the like.
To put it concretely, as shown in Fig. 7, the battery unit BTU is an electric power storage system including the storage batteries BTl and BT2 , which are connected to each other in parallel, and the battery management unit BMU that is a controller. The storage batteries BTl and BT2 include the battery voltage detectors PTbl and PTb2, and the battery breakers CBbl and CBb2 respectively. The battery voltage detectors PTbl and PTb2 measure the voltages of the storage batteries BTl and BT2 respectively, and output the measurement information to the battery management unit BMU. The battery breakers CBbl and CBb2 are included in the storage batteries BTl and BT2 respectively, and they are appropriately switched off when any emergency occurs or when the replacement of the storage batteries BTl or BT2 is made. The battery management unit BMU takes in the measurement values, which are output from

the battery voltage detector PTbl and PTb2 , and transmits these measurement values to the controller C of the power converter 1. The controller C receives and takes in the measurement values as received information COMr.
The controller C according to the third embodiment has to perform start control even when the battery breaker CBbl is off owing to the replacement of the storage batteries BTl, or BT2 or the like. In this case, because the voltage of the storage battery BTl and that of the storage battery BT2 are different from each other, there is a possibility that an excessive current flows from the storage battery BTl to the storage battery BT2 and an inverter when the battery breaker CBbl is switched on, which may lead to damages to the storage batteries and the inverter. Fig. 9 is a diagram showing a configuration example of a sequence processing unit Seq 3 according to the third embodiment. The power converter 1 includes an operation interface means, using which manual operations can be performed, in a not-shown part of the power converter itself, and it is possible to select storage batteries to be interconnected to each other by using the interface means. When an operation to interconnect the storage battery BTl, if the storage battery BTl is disconnected from the power converter 1, is made, the interface means transmits a voltage command value changing-over signal to the controller C. The controller C takes the voltage VDBl of the

storage battery BTl as a voltage command value, and performs voltage control so that the voltage VDBl may coincide with the DC voltage of the inverter. The difference between the voltage VDBl of the storage battery BTl and the DC voltage of the inverter is transmitted to the battery management unit BMU as transmission information COMt. Judging that the voltage difference is within a predefined range, the battery management unit BMU gives a switch command S5 to the breaker CBbl, which enables the breaker CBbl to be switched on without generation of a large current.
After the breaker CBbl is switched on, the on-off state signal CBbl_Ans of the breaker CBbl is received via communication and input into an operation mode changing-over switch, which changes over the operation mode into inverter control in accordance with the calculation performed by an active power control unit as described in the first embodiment.
Fig. 8 shows an alternate embodiment example for the third embodiment shown in Fig. 7. Although the battery management unit BMU manages and controls all the storage batteries BTl and BT2 in Fig. 7, battery management units BMUl and BMU2 are installed for the storage batteries BTl and BT2 respectively in the example shown in Fig. 8, and the storage batteries BTl and BT2 are managed and controlled respectively by the battery management units BMUl and BMU2.
According to the above described third embodiment of the

present invention, because the limited current is applied to the capacitor, and because the difference between the voltage of the capacitor and the voltage of the storage battery is monitored and the connection of the power storage device is performed on the basis of the monitored difference, a rush current, which could occur in the start process from the initial charge and to the connection of the power storage device, can be prevented from occurring. Particularly, in the case where a storage battery is a large-sized facility, and parts of the storage battery have to be installed in a distributed fashion, the third embodiment of the present invention can be preferable.

WHAT IS CLAIMED IS:
1. A power converter that is installed between an electric power system and a power storage device and performs AC/DC conversion with the use of an inverter, comprising:
a harmonic filter in an AC circuit on the electric power system side; and
a DC capacitor and a DC breaker in a DC circuit on the power storage device side,
wherein, when the power storage device starts running, a current that is limited by a limiting resistor is given from the electric power system side to the DC capacitor, the difference between the voltage of the DC capacitor and the voltage of the power storage device is monitored, and the power converter is connected to the power storage device by switching on the DC breaker on the basis of the monitored difference.
2 . The power converter according to claim 1, comprising:
a first switch included in the AC circuit;
a resistor one terminal of which is connected to the first switch in series and the other terminal of which is connected to the AC terminal of the inverter via the harmonic filter; and
a second switch that is connected in parallel to a series circuit of the first switch and the resistor,
wherein a start control means for the power converter

includes the steps of:
switching on the first switch, opening the first switch when the voltage of the DC capacitor exceeds a first predefined value, and further switching on the second switch;
controlling the inverter so that the difference between the voltage of the power storage device and the voltage of the DC capacitor decreases by starting the switching of the inverter after the second switch is switched on;
switching on the DC breaker if the difference between the voltage of the power storage device and the voltage of the DC capacitor is within a predefined range;
changing over an operation mode after the switch-on of the DC breaker; and
controlling the inverter by using an active power command value after the operation mode is changed over.
3 . The power converter according to claim 1, comprising:
a second switch installed in the AC circuit, the second switch being connected to the AC terminal of the inverter via the harmonic filter;
a third switch connected to the AC circuit in parallel;
a transformer connected to the AC circuit via the third switch; and
a rectifier whose AC terminal is connected to the transformer and whose DC output circuit is connected to a DC capacitor via a resistor,

wherein a start control means for the power converter includes the steps of:
switching on the third switch, and opening the third switch when the voltage of the DC capacitor exceeds a second predefined value;
controlling the inverter so that the difference between the voltage of the power storage device and the voltage of the DC capacitor decreases by starting the switching of the inverter after the third switch is opened; and
switching on the DC breaker if the difference between the voltage of the power storage device and the voltage of the DC capacitor is within a predefined range.
4. The power converter according to any one of claim 1,
wherein the power storage device includes a plurality of unit power storage devices connected to each other in parallel,
each of the unit power storage devices includes a DC switch and a storage battery connected to the DC switch,
the storage batteries of the unit power storage devices are connected to each other in parallel via the DC switches, and
the power converter includes a means for detecting the storage battery voltages of the unit power storage devices.
5 . The power converter according to any one of claim 2,
wherein the power storage device includes a plurality

of unit power storage devices connected to each other in parallel,
each of the unit power storage devices includes a DC switch and a storage battery connected to the DC switch,
the storage batteries of the unit power storage devices are connected to each other in parallel via the DC switches, and
the power converter includes a means for detecting the storage battery voltages of the unit power storage devices.
6. The power converter according to any one of claim 3,
wherein the power storage device includes a plurality
of unit power storage devices connected to each other in parallel,
each of the unit power storage devices includes a DC switch and a storage battery connected to the DC switch,
the storage batteries of the unit power storage devices are connected to each other in parallel via the DC switches, and
the power converter includes a means for detecting the storage battery voltages of the unit power storage devices.
7. The power converter according to claim 4,
wherein the inverter is controlled to reduce the
difference between the voltage of the storage battery at the time of the DC switch being open and the voltage of the DC capacitor of the inverter when the DC switch of at least one

of the unit power storage devices is shifted from an open state to a closed state.
8. The power converter according to claim 5,
wherein the inverter is controlled to reduce the
difference between the voltage of the storage battery at the time of the DC switch being open and the voltage of the DC capacitor of the inverter when the DC switch of at least one of the unit power storage devices is shifted from an open state to a closed state.
9. The power converter according to claim 6,
wherein the inverter is controlled to reduce the
difference between the voltage of the storage battery at the time of the DC switch being open and the voltage of the DC capacitor of the inverter when the DC switch of at least one of the unit power storage devices is shifted from an open state to a closed state.
10. The power converter according to claim 4,
comprising:
an operation interface means to manually give an interconnection command to a unit power storage device whose DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.
11. The power onverter according to claim 5, comprising:
an operation interface means to manually give an

interconnection command to a unit power storage device whose DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.
12. The power onverter according to claim 6, comprising:
an operation interface means to manually give an interconnection command to a unit power storage device whose DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.
13 . The power onverter according to claim 7, comprising:
an operation interface means to manually give an interconnection command to a unit power storage device whose DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.
14. The power onverter according to claim 8, comprising:
an operation interface means to manually give an
interconnection command to a unit power storage device whose DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.
15. The power onverter according to claim 9, comprising:
an operation interface means to manually give an
interconnection command to a unit power storage device whose

DC switch is in an open state; and
a switching means for changing over a voltage command on the basis of a signal from the interface means.

Documents

Application Documents

# Name Date
1 Form 5.pdf 2015-06-04
2 Form 3.pdf 2015-06-04
3 15682-465_CS.pdf 2015-06-04
4 Form 5.pdf_783.pdf 2015-06-25
5 Form 3.pdf_784.pdf 2015-06-25
6 15682-465_CS.pdf_785.pdf 2015-06-25
7 1440-del-2015-Others-(01-07-2015).pdf 2015-07-01
8 1440-del-2015-Correspondence Others-(01-07-2015).pdf 2015-07-01
9 1440-del-2015-Verification Translation-(29-07-2015).pdf 2015-07-29
10 1440-del-2015-GPA-(29-07-2015).pdf 2015-07-29
11 1440-del-2015-Form-1-(29-07-2015).pdf 2015-07-29
12 1440-del-2015-Correspondence Others-(29-07-2015).pdf 2015-07-29
13 1440-DEL-2015-FER.pdf 2018-08-23
14 1440-DEL-2015-Information under section 8(2) (MANDATORY) [08-02-2019(online)].pdf 2019-02-08
15 1440-DEL-2015-FORM 3 [08-02-2019(online)].pdf 2019-02-08
16 1440-DEL-2015-OTHERS [15-02-2019(online)].pdf 2019-02-15
17 1440-DEL-2015-MARKED COPIES OF AMENDEMENTS [15-02-2019(online)].pdf 2019-02-15
18 1440-DEL-2015-FORM 13 [15-02-2019(online)].pdf 2019-02-15
19 1440-DEL-2015-FER_SER_REPLY [15-02-2019(online)].pdf 2019-02-15
20 1440-DEL-2015-COMPLETE SPECIFICATION [15-02-2019(online)].pdf 2019-02-15
21 1440-DEL-2015-CLAIMS [15-02-2019(online)].pdf 2019-02-15
22 1440-DEL-2015-AMMENDED DOCUMENTS [15-02-2019(online)].pdf 2019-02-15
23 1440-DEL-2015-ABSTRACT [15-02-2019(online)].pdf 2019-02-15
24 1440-DEL-2015-PA [25-02-2020(online)].pdf 2020-02-25
25 1440-DEL-2015-ASSIGNMENT DOCUMENTS [25-02-2020(online)].pdf 2020-02-25
26 1440-DEL-2015-8(i)-Substitution-Change Of Applicant - Form 6 [25-02-2020(online)].pdf 2020-02-25
27 1440-DEL-2015-Power of Attorney-280220.pdf 2020-03-03
28 1440-DEL-2015-OTHERS-280220.pdf 2020-03-03
29 1440-DEL-2015-Correspondence-280220.pdf 2020-03-03
30 1440-DEL-2015-PatentCertificate10-10-2023.pdf 2023-10-10
31 1440-DEL-2015-IntimationOfGrant10-10-2023.pdf 2023-10-10

Search Strategy

1 1440DEL2015_11-07-2018.pdf

ERegister / Renewals

3rd: 27 Dec 2023

From 21/05/2017 - To 21/05/2018

4th: 27 Dec 2023

From 21/05/2018 - To 21/05/2019

5th: 27 Dec 2023

From 21/05/2019 - To 21/05/2020

6th: 27 Dec 2023

From 21/05/2020 - To 21/05/2021

7th: 27 Dec 2023

From 21/05/2021 - To 21/05/2022

8th: 27 Dec 2023

From 21/05/2022 - To 21/05/2023

9th: 27 Dec 2023

From 21/05/2023 - To 21/05/2024

10th: 25 Apr 2024

From 21/05/2024 - To 21/05/2025

11th: 14 Apr 2025

From 21/05/2025 - To 21/05/2026