Sign In to Follow Application
View All Documents & Correspondence

Power Converter And Control Method For Power Converter

Abstract: In the present invention if detection is made that a B terminal voltage of a power generator has exceeded a first predetermined voltage value a control unit turns ON all switching elements of a negative electrode lateral arm of a bridge circuit connected to a set of armature windings turns OFF all switching elements of a positive electrode lateral arm and reduces field current that flows in a field winding. Then if predetermined conditions are satisfied the control unit turns OFF all the switching elements that have been turned ON.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
10 April 2014
Publication Number
27/2015
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
patent@depenning.com
Parent Application
Patent Number
Legal Status
Grant Date
2020-10-21
Renewal Date

Applicants

MITSUBISHI ELECTRIC CORPORATION
7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310

Inventors

1. TABATA Mitsunori
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
2. MORI Masato
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
3. NAKAJIMA Kenji
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310
4. AKITA Kenichi
c/o Mitsubishi Electric Corporation 7 3 Marunouchi 2 chome Chiyoda ku Tokyo 1008310

Specification

Documents

Application Documents

# Name Date
1 GPA.pdf 2014-04-11
2 FORM-5.pdf 2014-04-11
3 FORM-3.pdf 2014-04-11
4 2721-CHENP-2014.pdf 2014-04-11
5 1286-2014-COMPLETE SPECIFICATION.pdf 2014-04-11
6 1286-2014 OTHERS.pdf 2014-04-11
7 2721-CHENP-2014 FORM-3 10-10-2014.pdf 2014-10-10
8 2721-CHENP-2014 CORRESPONDENCE OTHERS 10-10-2014.pdf 2014-10-10
9 pa.pdf 2015-01-08
10 abstract 2721-CHENP-2014.jpg 2015-01-08
11 2721-CHENP-2014-FER.pdf 2018-06-28
12 2721-CHENP-2014-OTHERS [19-12-2018(online)].pdf 2018-12-19
13 2721-CHENP-2014-Information under section 8(2) (MANDATORY) [19-12-2018(online)].pdf 2018-12-19
14 2721-CHENP-2014-FORM 3 [19-12-2018(online)].pdf 2018-12-19
15 2721-CHENP-2014-FER_SER_REPLY [19-12-2018(online)].pdf 2018-12-19
16 2721-CHENP-2014-DRAWING [19-12-2018(online)].pdf 2018-12-19
17 2721-CHENP-2014-CLAIMS [19-12-2018(online)].pdf 2018-12-19
18 2721-CHENP-2014-ABSTRACT [19-12-2018(online)].pdf 2018-12-19
19 2721-CHENP-2014-US(14)-HearingNotice-(HearingDate-13-08-2020).pdf 2020-07-15
20 2721-CHENP-2014-US(14)-ExtendedHearingNotice-(HearingDate-13-08-2020).pdf 2020-07-15
21 2721-CHENP-2014-FORM-26 [11-08-2020(online)].pdf 2020-08-11
22 2721-CHENP-2014-Correspondence to notify the Controller [11-08-2020(online)].pdf 2020-08-11
23 2721-CHENP-2014-Written submissions and relevant documents [27-08-2020(online)].pdf 2020-08-27
24 2721-CHENP-2014-Retyped Pages under Rule 14(1) [27-08-2020(online)].pdf 2020-08-27
25 2721-CHENP-2014-2. Marked Copy under Rule 14(2) [27-08-2020(online)].pdf 2020-08-27
26 2721-CHENP-2014-PatentCertificate21-10-2020.pdf 2020-10-21
27 2721-CHENP-2014-Marked up Claims_Granted 349712_21-10-2020.pdf 2020-10-21
28 2721-CHENP-2014-IntimationOfGrant21-10-2020.pdf 2020-10-21
29 2721-CHENP-2014-Drawings_Granted 349712_21-10-2020.pdf 2020-10-21
30 2721-CHENP-2014-Description_Granted 349712_21-10-2020.pdf 2020-10-21
31 2721-CHENP-2014-Claims_Granted 349712_21-10-2020.pdf 2020-10-21
32 2721-CHENP-2014-Abstract_Granted 349712_21-10-2020.pdf 2020-10-21
33 2721-CHENP-2014-RELEVANT DOCUMENTS [15-09-2022(online)].pdf 2022-09-15
34 2721-CHENP-2014-RELEVANT DOCUMENTS [20-09-2023(online)].pdf 2023-09-20

Search Strategy

1 2721chenp2014search_27-02-2018.pdf

ERegister / Renewals

3rd: 31 Oct 2020

From 15/12/2013 - To 15/12/2014

4th: 31 Oct 2020

From 15/12/2014 - To 15/12/2015

5th: 31 Oct 2020

From 15/12/2015 - To 15/12/2016

6th: 31 Oct 2020

From 15/12/2016 - To 15/12/2017

7th: 31 Oct 2020

From 15/12/2017 - To 15/12/2018

8th: 31 Oct 2020

From 15/12/2018 - To 15/12/2019

9th: 31 Oct 2020

From 15/12/2019 - To 15/12/2020

10th: 31 Oct 2020

From 15/12/2020 - To 15/12/2021

11th: 16 Nov 2021

From 15/12/2021 - To 15/12/2022

12th: 17 Nov 2022

From 15/12/2022 - To 15/12/2023

13th: 07 Nov 2023

From 15/12/2023 - To 15/12/2024

14th: 14 Nov 2024

From 15/12/2024 - To 15/12/2025

15th: 30 Oct 2025

From 15/12/2025 - To 15/12/2026