Abstract: Provided is a technology that improves the precision of demand regulation in an electrical power system. This power demand regulation system (10) has a power demand regulation device (11) that regulates the load applied to equipment of an electrical power system (13) by a load apparatus (15) operating by means of power from the electrical power system (13) which supplies power to consumers (12). When regulating the load to the equipment the power demand regulation device (11) selects a load apparatus (15) as the subject of a request for an alteration of operating state on the basis of by apparatus load information which is information of each load apparatus (15) and a regulation target value which is the amount of load that is to be regulated and in the period from the start to the end of regulation executes a plurality of times the outputting of an alteration request that requests the alteration of the operating state of the selected load apparatus (15).
POWER DEMAND REGULATION SYSTEM, POWER DEMAND REGULATION DEVICE,
AND POWER DEMAND REGULATION METHOD
TECHNICAL FIELD
[0001]
5 The present invention relates to a demand response technique in a power system
for supplying electric power to consumers.
BACKGROUND ART
[0002]
10 In the future, it is expected that electric vehicles and plug-in type hybrid vehicles
are spread, so that it is considered that load applied to equipment such as distribution substations
and pole transformers in the power system which supplies electric power to consumers is
increased. In the power system, when the load exceeding a permissible value is applied to the
equipment, a variety of trouble occurs to be exposed to danger. For example, when the load
15 exceeding the permissible value is applied to the distribution substation, a breaker in the
distribution substation is operated, so that an outage occurs in the whole region. Further, when
the load exceeding the permissible value is applied to the pole transformer, the pole transformer
is sometimes burned and damaged.
[0003]
20 As the technique of solving such an overload state, there is a technique disclosed
in the non-patented literature 1. In the technique of the non-patented literature 1, first, when the
overload state of the pole transformer is detected, a load control volume required to solve the
overload is calculated. Next, an amount of load to be reduced when apparatuses of consumers
constituting the load are stopped, that is, power sources are cut off is predicted. Until the load
25 control volume required to solve the overload state is reached, the amount of load reduced by
stopping the apparatuses of consumers is added up. The apparatuses of consumers requested to
be stopped are decided on the basis of the added-up results and a stop request signal is
transmitted to the relevant apparatuses of consumers. The apparatuses of consumers which
receive the stop request signal cut off their power sources. Consequently, the load on the
30 equipment is reduced to solve the overload state.
3
CITATION LIST
NON PATENT LITERATURE
[0004]
NON PATENT LITERATURE 1: "Emergency Demand Response for Distribution System
5 Contingencies", (GE Global Research) IEEE 2010
SUMMARY OF INVENTION
TECHNICAL PROBLEM
[0005]
10 In the technique of the above non-patented literature 1, the amount of load
capable of being reduced if the apparatuses of consumers are stopped is predicted to be added for
each apparatus and the amount of load to be reduced as a whole is ensured, so that the stop
request signal is transmitted to the apparatuses of consumers to be stopped.
[0006]
15 Accordingly, the accuracy of the whole load control volume obtained by adding
up the amount of load capable of being reduced in the apparatuses of consumers depends on the
prediction accuracy of the amount of load to be reduced when the apparatuses of consumers are
stopped. When a number of apparatuses of consumers are stopped, it is considered that errors
in the amount of load of apparatuses of consumers are added up, so that the whole load control
20 volume is scattered widely.
[0007]
As a result, when the amount of load reduced actually are lacking as compared
with the amount of load to be reduced, the outage is continued as before or the dangerousness
which damages the equipment remains continuously. Further, conversely, when the load is
25 actually reduced excessively as compared with the amount of load to be reduced, deterioration in
convenience is forced to consumers beyond necessity.
[0008]
It is an object of the present invention to provide a technique of improving the
accuracy of regulation for demand in a power system.
30 SOLUTION TO PROBLEM
[0009]
The electric power demand regulating system according to an aspect of the
present invention, which regulates load applied to equipment of a power system by load
4
apparatuses operated by electric power from the power system which supplies electric power to
consumers, comprises an electric power demand regulating device which makes selection of a
load apparatus to be requested to make a change of an operation state on the basis of a regulation
target value which is an amount of load to be regulated and load information for each apparatus
5 which is information of each load apparatus when the load on the equipment is regulated and
outputting of a change request for requesting to make a change of the operation state of the
selected load apparatus plural times during a period from start to completion of regulation.
[0010]
Further, the electric power demand regulating device may update the regulation
10 target value after the change request is outputted and select the load apparatus to be requested to
make a change of the operation state at a next change request on the basis of the updated
regulation target value.
[0011]
Moreover, the electric power demand regulating device may select the load
15 apparatus to be requested to make a change of the operation state on the basis of the regulation
target value, the load information for each apparatus and degree of change in convenience of the
consumers in case where the operation state of the load apparatuses is changed.
[0012]
Furthermore, the electric power demand regulating device may maintain a
20 response rate representing a probability that the operation state is changed when the change
request is received for each category of the load apparatuses while updating the response rate and
select the load apparatus to be requested to make a change of the operation state on the basis of
the regulation target value, the load information for each apparatus and the response rate.
[0013]
25 Further, the electric power demand regulating device may count the change
requests outputted from start time of the regulation and change a selection rule for selecting the
load apparatus to be requested to make a change of the operation state when the count reaches a
predetermined threshold value.
[0014]
30 Moreover, the electric power demand regulating device may select the load
apparatus having large rated power preferentially before the count reaches the threshold value
and select the load apparatus having the high response rate preferentially after the count reaches
the threshold value.
[0015]
5
Furthermore, the load apparatuses may include electrical apparatuses installed in
the consumers connected to the power system and operated by electric power from the power
system and storage battery systems connected to the power system and making accumulation of
electricity from the power system and discharge of electricity to the power system.
5 ADVANTAGEOUS EFFECTS OF INVENTION
[0016]
According to the present invention, the accuracy of regulation for demand in the
power system can be improved.
10 BRIEF DESCRIPTION OF DRAWINGS
[0017]
[FIG. 1 ] Fig. 1 is a block diagram schematically illustrating an electric power
demand regulating system according to a first embodiment.
[FIG. 2] Fig. 2 is a block diagram schematically illustrating a basic configuration
15 of an electric power demand regulating device 11 according to the first embodiment.
[FIG. 3] Fig. 3 is a block diagram schematically illustrating an electric power
demand regulating system according to a second embodiment.
[FIG. 4] Fig. 4 is a graph showing an example of the state of change in load
applied to equipment of a power system.
20 [FIG. 5] Fig. 5 is a diagram showing an example of a table format stored in an
apparatus information DB.
[FIG. 6] Fig. 6 is a flow chart showing operation of a response update part.
[FIG. 7] Fig. 7 is a diagram showing an example of a table stored in a request
result DB.
25 [FIG. 8] Fig. 8 is a diagram showing an example of a table format stored in a
convenience influence DB.
[FIG. 9] Fig. 9 is a flow chart showing operation of a stop request information
production part.
[FIG. 10] Fig. 10 is a graph illustrating the state of operation example of the stop
30 request information production part.
DESCRIPTION OF EMBODIMENTS
[0018]
6
An electric power demand regulating system according to embodiments of the
present invention is described with reference to the drawings.
[0019]
(FIRST EMBODIMENT)
5 [0020]
Fig. 1 is a block diagram schematically illustrating an electric power demand
regulating system according to a first embodiment. Referring to Fig. 1, the electric power
demand regulating system 10 includes an electric power demand regulating device 11 connected
through a communication network 14 to a power system 13 and consumers 12.
10 [0021]
The power system 13 is a system for supplying electric power to the consumers
12.
[0022]
The consumers 12 include load apparatuses 15 which are electrical apparatuses
15 operated by electric power from the power system 13. The load apparatuses 15 are apparatuses
of which electric power consumption, that is, the amount of load applied to the power system 13
is changed depending on the operation state. For example, when a power source of the load
apparatus 15 is turned on, the power system 13 is loaded and when the power source is turned
off, the power system 13 is not loaded.
20 [0023]
The electric power demand regulating device 11 is a device which regulates the
load applied to the equipment of the power system 13 by the load apparatuses 15. For example,
when the load applied to the power system 13 becomes excessive state (overload state),
regulation of the load is started. When the amount of load is reduced to a proper value, the
25 regulation of the load is completed.
[0024]
Here, only the electrical apparatuses installed in the consumers 12 are defined as
the load apparatuses 15 but other apparatuses may be contained as the load apparatuses 15. For
example, the load apparatuses 15 may contain electrical apparatuses installed in the consumers
30 12 connected to the power system 13 and operated by electric power from the power system 13
and storage battery systems comiected to the power system to make accumulation of electricity
from the power system and discharge of electricity to the power system 13.
[0025]
When the electric power demand regulating device 11 regulates the load applied
7
to the equipment of the power system 13, the electric power demand regulating device 11
performs the following processing plural times during the period from start to completion of the
regulation.
[0026]
5 The electric power demand regulating device 11 first selects a load apparatus to
be requested to make a change of operation state on the basis of a regulation target value which
is the amount of load to be regulated and load information for each apparatus which is
information of each of the load apparatuses 15. The regulation target value is a difference
between a proper value of the amount of load applied to the equipment of the power system 13
10 and the amount of load actually applied to the equipment at present. The proper value may be a
maximum load within the permissible range of the equipment in order to maintain the
convenience for the consumers 12 as high as possible even if the load is regulated, for example.
Then, the electric power demand regulating device 11 produces a change request for requesting
change of the operation state of the selected load apparatus 15. A typical example of change of
15 the operation state is to turn off the power source of the load apparatus 15 which is the electrical
apparatus. As another example, transition to a power-saving mode of the electrical apparatus is
contained in change of the operation state.
[0027]
When the consumers 12 accept the change request, the consumers 12 change the
20 operation state of the load apparatuses 15 in accordance with the request.
[0028]
According to the embodiment, since the load on the load apparatus 15 is regulated
by plural change requests, the amount of load applied to the equipment of the power system 13,
that is, the regulation accuracy of demand in the power system 13 can be improved.
25 [0029]
Fig. 2 is a block diagram schematically illustrating a basic configuration of the
electric power demand regulating device 11 according to the first embodiment. Referring to
Fig. 2, the electric power demand regulating device 11 includes a judgment part 21, a production
part 22 and a transmission part 23.
30 [0030]
The judgment part 21 decides implementation of regulation of the load applied to
the equipment of the power system 13 on the basis of the load. The production part 22 selects
the load apparatus 15 to be requested to make a change of the operation state on the basis of the
regulation target value and the load information for each apparatus and produces the change
8
request for requesting change of the operation state of the selected load apparatus 15. The
transmission part 23 outputs or transmits the change request produced by the production part 22
to the consumers 13.
[0031]
5 When the implementation of regulation of the load is decided by the judgment
part 21, the production part 22 produces the change request plural times during the period from
start to completion of the regulation and the transmission part 23 transmits the change request
each time the request is produced by the production part 22.
[0032]
10 When the electric power demand regulating device 11 produces the change
request to thereby regulate the load, the load applied to the power system 13 is changed. Thus,
the electric power demand regulating device 11 repeats the processing of updating the regulation
target value in accordance with the change of the load, selecting the load apparatus to be
requested to make a change of the operation state at a next change request on the basis of the
15 updated regulation target value and outputting the change request. In this manner, the
regulation result can be fed back to thereby bring the amount of load applied to the power system
13 near to the proper value exactly.
[0033]
Further, the electric power demand regulating device 11 may select the load
20 apparatus 15 to be requested to make a change of the operation state on the basis of not only the
regulation target value and the load information for each apparatus but also the degree of change
in convenience of the consumers 12 in case where the operation state of the load apparatuses 15
is changed. Consequently, the load can be reduced while maintaining the convenience of the
consumers 12 as high as possible.
25 [0034]
Moreover, the electric power demand regulating device 11 may maintain a
response rate representing the probability that the operation state is changed when the change
request is received for each category of the load apparatuses 15 while updating the response rate.
In this case, the electric power demand regulating device 11 may select the load apparatus to be
30 requested to make a change of the operation state on the basis of not only the regulation target
value and the load information for each apparatus but also the response rate. For example,
when the change request is issued to the load apparatus 15 of the category having the higher
response rate, the prediction accuracy of the reduction amount of load can be improved and
accordingly the reduction amount near to the prediction value can be obtained.
9
[0035]
Further, the electric power demand regulating device 11 may count the change
requests produced from start time of regulation and when the count reaches a predetermined
threshold value, the selection rule for selecting the load apparatus 15 to be requested to make a
5 change of the operation state may be changed. Thus, different selection rules can be used in the
first and second halves of the regulation period to thereby regulate the load applied to the
equipment of the power system 13 flexibly.
[0036]
Further, in that case, the electric power demand regulating device 11 may select
10 the load apparatus 15 having larger rated power preferentially before the count reaches the
threshold value and may select the load apparatus 15 having higher response rate preferentially
after the count reaches the threshold value. By doing so, in the first half of the regulation
period, the change can be requested to the load apparatus 15 having the large load reduction
effect in case where the power source is turned off, so that the load can be regulated efficiently,
15 while in the second half of the regulation period, the change can be requested to the load
apparatus 15 having the higher response rate, so that the load can be regulated to the target value
with high accuracy.
[0037]
Moreover, in the embodiment, an example has been described in which it is
20 supposed that the electric power supply force of the power system 13 is fixed and the state of
load on the power system 13 is changed depending on the operation state of the load apparatuses
15. However, the present invention is not limited to such configuration. When the electric
power supply force of the power system 13 is changed, the power system 13 sometimes becomes
the overload state even if the operation state of the load apparatuses 15 is not changed. For
25 example, when part of electric power of the power system 13 is generated by wind power
generation, the electric power supply force of the power system 13 is largely changed depending
on the strength of wind. The present invention can be applied similarly even in the overload
state effected by relative relation of load to the electric power supply force.
[0038]
30 (SECOND EMBODIMENT)
[0039]
The basic configuration and operation of the second embodiment are the same as
those of the first embodiment but in the second embodiment more concrete configuration and
operation are provided or described.
10
[0040]
Fig. 3 is a block diagram schematically illustrating an electric power demand
regulating system according to the second embodiment. Referring to Fig. 3, the electric power
demand regulating system includes an electric power demand regulating device 1100, consumers
5 1200, a power system 1300 and a communication network 1400.
[0041]
The communication network 1400 is a general communication network including
the Internet.
[0042]
10 The power system 1300 includes distribution line 1301, equipment 1302, a load
state measurement part 1303, an energy storage function part 1304, an energy storage state
measurement part 1305 and a state transmission part 1306.
[0043]
The distribution line 1301 is equipment for supplying electric power to the
15 consumers 1200.
[0044]
The equipment 1302 is equipment constituting the power system 1300 and, for
example, distribution transformers and pole transformers correspond to the equipment.
[0045]
20 The load state measurement part 1303 measures load applied to the equipment
1302.
[0046]
The energy storage function part 1304 is an energy storage device installed in
order to make the load on the distribution line 1301 and the equipment 1302 uniform in terms of
25 time and a storage battery corresponds thereto, for example.
[0047]
The energy storage state measurement part 1305 measures the amount of energy
stored in the energy storage function part 1304. As measurement items, charged state
information such as SOC (State of Charge) is considered when the energy storage function part
30 1304 is a storage battery.
[0048]
The state transmission part 1306 transmits information of the load on the
equipment 1302 measured by the load state measurement part 1303 and information the charged
state of the energy storage function part 1304 measured by the energy storage state measurement
11
part 1305 to the electric power demand regulating device 1100 through the communication
network 1400.
[0049]
The consumers 1200 are to receive electric power from the distribution line 1301
5 and concretely contain independent houses, apartment houses, factory equipment, commercial
equipment and the like. A plurality of consumers 1200 are connected to the distribution line
1301 of the power system 1300. The consumers 1200 in the embodiment include apparatuses
1201 which are operated by electric power and connected to the distribution line 1301.
[0050]
10 Further, the consumers 1200 also include a setting change part 1202 and a set
result transmission part 1203.
[0051]
The setting change part 1202 changes the operation state (for example, on or off
of the power source) of the apparatuses 1201 in accordance with a change request for apparatus
15 setting received from the electric power demand regulating device 1100 through the
communication network 1400. The setting change part 1202 may be incorporated in the
apparatuses 1201 or may be provided independent of the apparatuses 1201.
[0052]
Moreover, with regard to change of the apparatus setting, a person of the
20 consumer 1200 which has received the change request for the apparatus setting judges whether
the person accepts the change request or not and when the person accepts the change request, the
person may change the setting of the apparatus manually. In this case, the setting change part
1202 may indicate the contents of the change request to the person, for example, and may change
the apparatus setting when an input to the effect that the person accepts the change request is
25 received from the person.
[0053]
The set result transmission part 1203 detects how the operation state of the
apparatus 1201 is changed in accordance with the change of the apparatus setting by the setting
change part 1202 and transmits the detection result to the electric power demand regulating
30 device 1100 through the communication network 1400. The set result transmission part 1203
may be incorporated in the apparatuses 1201 or may be provided independent of the apparatuses
1201. For example, it is considered that when the set result transmission part 1203 detects the
operation state of the apparatus 1201, the set result transmission part 1203 measures a current
value reflecting the operation state of the apparatus 1201 to thereby monitor the operation state
12
of the apparatus externally. Further, when the function of outpulting the operation state
information externally is included in the apparatus 1201, the set result transmission part 1203
may receive the information from the apparatus 1201.
[0054]
5 The electric power demand regulating device 1100 includes a receiving part 1101,
an overload judgment part 1102, a necessary stop amount calculation part 1103, a suppression
response amount estimation part 1104, a stop shortage amount calculation part 1105, a response
update part 1107, a regulation-force-for-each-apparatus prediction part 1109, a request
transmittable frequency setting part 1111, a request transmission frequency counter 1112, a stop
10 request information production part 1113 and a request transmission part 1114.
[0055]
The receiving part 1101 receives a measurement value of load applied to the
equipment 1302 and a measurement value of the energy storage state of the energy storage
function part 1304 from the power system 1300 through the communication network 1400.
15 [0056]
The overload judgment part 1102 judges the state that the amount of load applied
to the equipment 1302 exceeds a predetermined threshold value as an overload state.
[0057]
The necessary stop amount calculation part 1103 calculates the amount of load
20 exceeding a predetermined permissible amount in the load applied to the equipment 1302 as a
necessary stop amount.
[0058]
The suppression response amount estimation part 1104 calculates the change
amount of load on the equipment 1302 produced as the result that the operation state of the
25 apparatus 1201 of the consumer 1200 is changed in response to a stop request (change request of
apparatus setting) transmitted to the consumer 1200 by the electric power demand regulating
device 1100.
[0059]
The stop shortage amount calculation part 1105 compares the change amount of
30 load calculated by the suppression response amount estimation part 1104 with the necessary stop
amount calculated by the necessary stop amount calculation part 1103 and calculates the
shortage amount as the stop shortage amount when the change amount of load calculated by the
suppression response amount estimation part 1104 is smaller than the necessary stop amount
calculated by the necessary stop amount calculation part 1103.
13
[0060]
Here, the result of calculation performed in the receiving part 1101, the overload
judgment part 1102, the necessary stop amount calculation part 1103, the suppression response
amount estimation part 1104 and the stop shortage amount calculation part 1105 is further
5 described with reference to Fig. 4.
[0061]
Fig. 4 shows an example of the state of change of load applied to the equipment
of the power system.
[0062]
10 The horizontal axis of this drawing represents time and the vertical axis represents
the amount of load applied to the equipment 1302.
[0063]
UL in the drawing represents a value set as a maximum permissible value of load
applied to the equipment 1302. USH represents a reference value for judgment of overload and
15 when load 2001 exceeds USH, it is judged that the equipment is in the overload state.
Thereafter, when the load 2001 is lower than UL as the result that the load is reduced, it is judged
that the overload state is solved.
[0064]
The reason that UL and USH are different is that it is prevented that the overload
20 state and the solved state of overload are frequently repeated by repetition of small increase and
decrease of load to thereby produce hunting of judgment frequently.
[0065]
Triangular marks in the drawing represent timings that the stop request of load is
transmitted to the consumer 1200. The numeral described in the triangular mark represents that
25 the stop request thereof is issued in a sequence number corresponding to the numeral, that is, the
numeral represents a sequence number in the number of times of transmission of the stop
requests.
[0066]
Operation of the receiving part 1101 to the stop shortage amount calculation part
30 1105 is now described along the flux of time.
[0067]
Thick line 2001 in Fig. 4 represents the load applied to the equipment 1302. The
value of the load is obtained by the receiving part 1101.
[0068]
14
For example, at time tO, the magnitude of the load applied to the equipment 1302
exceeds UL but is smaller than USH which is the reference for overload judgment.
Accordingly, at this time, it is judged that the equipment is not in the overload state.
[0069]
5 Next, at time tl, the magnitude of the load applied to the equipment 1302 reaches
PL At this time, PI which is the magnitude of the load applied to the equipment 1302 exceeds
the reference USH for overload judgment. Accordingly, the overload judgment part 1102
judges that the equipment is in the overload state. Consequently, the necessary stop amount
calculation part 1103 calculates the value obtained by subtracting UL from PI (arrow 2002 in the
10 drawing) as the necessary stop amount.
[0070]
Now, this processing is the first processing of issuing the stop request to the
apparatus 1201 of the consumer 1200 (1 is described in triangular mark) and accordingly the last
stop request does not exist. Hence, the suppression response amount calculated by the
15 suppression response amount estimation part 1104 is 0. Accordingly, the stop shortage amount
calculated by the stop shortage amount calculation part 1105 is equal to the magnitude
represented by arrow 2002 in the drawing.
[0071]
Next, at the stage of issuing the second stop request to the apparatus of the
20 consumer (2 is described in the triangular mark), the load on the equipment 1302 is reduced to
P2 as a result of the last stop request. At this time, the suppression response amount calculated
by the suppression response amount estimation part 1104 is equal to the magnitude obtained by
subtracting P2 from PI (the magnitude indicated by arrow 2003 in the drawing). The stop
shortage amount calculated by the stop shortage amount calculation part 1105 is equal to the
25 magnitude obtained by subtracting UL from P2 (the magnitude represented by arrow 2004 in the
drawing).
[0072]
Similarly, at the stage of producing information of the third stop request, the
suppression response amount brought by the last stop request is equal to the magnitude
30 represented by arrow 2005 in the drawing and the stop shortage amount is equal to the
magnitude represented by arrow 2006 in the drawing. At time t4, the magnitude of the load
2001 is lower than UL and accordingly the equipment escapes from the overload state.
Accordingly, in this example, regulation of the load is ended at the stage of transmitting the stop
request of the load three times.
15
Return to Fig. 3.
|0073J
An apparatus information DB 1106 records therein information of the apparatuses
1201 which are supplied with electric power from the distribution line 1301 to be operated.
5 The contents of this DB are described in Fig. 5. Fig. 5 shows an example of a table format
stored in the apparatus information DB 1106.
[0074]
In Fig. 5, the "consumer ID" records therein numbers each given to each of the
consumers 1200. The "apparatus ID" records therein numbers each given to each of the
10 apparatuses 1201. Since the energy storage function part 1304 of the power system 1300 is not
an apparatus installed in the consumer 1200, the consumer ID is blank, although a special
number such as, for example, 999 is given as the apparatus ID and the energy storage function
part can be treated without being distinguished from the apparatuses 1201 of the consumers
1200.
15 [0075]
Next, the "apparatus classification" records therein category names such as a
water heater and an air conditioner. The "rated output" records therein values of rated power in
specifications of the apparatuses. When the energy storage function part 1304 is a storage
battery, it is considered that the rated output is an output in case where 1C discharge (discharge is
20 made at a current value that discharge is ended in one hour) is performed.
[0076]
The "usual time operation state" shows operation state (on and off state of power
source) of the apparatuses 1201 in each time zone when the consumers 1200 live without
receiving the stop request. When the energy storage function part 1304 is a storage battery, the
25 "usual time operation state" shows whether discharge can be made from the storage battery or
not and when discharge can be made, OK is described therein.
[0077]
The "response rate" represents the probability that the stop request of the
apparatus 1201 transmitted from the electric power demand regulating device 1100 and received
30 by the consumer 1200 is accepted to change the setting of the apparatus 1201 in each time zone.
Here, three stages of High, Medium and Low are shown as the "response rate", by way of
example.
[0078]
The "request output flag" shows whether the electric power demand regulating
16
device 1100 transmits the stop request or not in order to solve the overload state of the
equipment 1302. 0 means that it is not transmitted and 1 means that it has been transmitted.
Further, the "request output flag" is initialized (all 0) each time the overload judgment part 1102
judges that the equipment is in the overload state.
5 Return to Fig. 3.
[0079]
A request result DB 1108 records therein the contents of the stop requests
transmitted by the electric power demand regulating device 1100 to the consumer 1200 after the
overload judgment part 1102 judges that the equipment is overloaded. Fig. 7 shows an example
10 of a table which is stored in the request result DB 1108.
[0080]
The "date" and the "control start time" are data and time that the overload
judgment part 1102 judges that the equipment is overloaded. The "request sequence number
represents a sequence number in the number of times of the load stop requests transmitted by the
15 electric power demand regulating device 1100 to the consumer 1200 (means what sequence
number in the number of times the load stop request is transmitted) from the time that the
overload judgment part 1102 judges the overload state.
[0081]
The "consumer ID" is a number given to each consumer 1200 and is common to
20 that of the apparatus information DB 1106.
[0082]
The "apparatus classification" and the "apparatus ID" are category name and
apparatus ID of the apparatus of the destination to which the electric power demand regulating
device 1100 transmits the stop request. The apparatus classification and the apparatus ID are
25 common to the apparatus information DB 1106.
[0083]
The "request contents" are the contents which the electric power demand
regulating device 1100 requests to the apparatus 1201. OFF means that it is requested to stop
the load.
30 [0084]
The request result DB 1108 records therein the transmission contents of the stop
requests from the time that the overload judgment part 1102 judges the overload state by the
combination of the above elements.
Return to Fig. 3.
17
[0085]
The response update part 1107 calculates a request acceptance rate (response rate)
for each category of the apparatuses as a result of the last stop request of the load. When there
exists the category having the high response rate, information of the response rate in the
5 apparatus information DB 1106 is updated so that the request is made to the category
preferentially from next time.
[0086]
Fig. 6 is a flow chart showing operation of the response update part 1107.
[0087]
10 Referring to Fig. 6, the response update part 1107 first performs loop processing
in category units of the apparatuses 1201 in step S4001. For example, the processing is
performed in order of the categories of water heaters, electric vehicle charging devices and air
conditioners.
[0088]
15 In step S4002, the n-th request information obtainment processing is performed.
The response update part 1107 extracts the result information of the n-th stop request from the
time that the overload judgment part 1102 judges the overload state with reference to the request
result DB 1108.
[0089]
20 In step S4003, the n-th response result obtainment processing is performed. The
response update part 1107 collects information of the operation states of the apparatuses 1201
transmitted by the set result transmission part 1203 of the consumer 1200.
[0090]
In step S4004, the processing of calculating the n-th response rate is performed.
25 The response update part 1107 makes matching between the request contents obtained in step
S4002 and the set contents (operation state) of the apparatuses 1201 obtained in step S4003 and
calculates the response rate on the basis of the matching result. The response rate R is
calculated by the expression (1).
[MATH. 1]
Response Rate R
_ The Number of Apparatuses Having the Request Contents Indential With the Set Contents of the Apparatus 1201
The Number of Apparatuses in Transmission Destination of the n-th Request
...(1)
30 [0091]
In step S4005, the response update part 1107 compares the response rate R with
18
the first threshold value. When the response rate is larger than this threshold value, the
apparatus of the category is judged to have high response (High) as the classification of the
response rate. Here, the threshold value is 2/3 as an example.
[0092]
5 When the response rate is larger than or equal to 2/3, the processing of the
response update part 1107 proceeds to step S4007, in which the response update part 1107 raises
the rank of the classification of the response rate of the apparatus of this category recorded in the
apparatus information DB 1106 by 1 uniformly. That is, when the classification of the response
rate set until now is Medium, the classification is changed to High and when it is Low, the
10 classification is changed to Medium. When the classification of the response rate set before
change is High, the classification is not changed.
[0093]
In step S4005, when the response rate does not reach the threshold value (2/3 in
this example), the response update part 1107 compares the response rate with the second
15 threshold value in step S4006. The second threshold value is smaller than the first threshold.
When the response rate is smaller than the threshold value, the apparatus of the category is
judged to have low response.
[0094]
Here, the threshold value is set to 1/3 as an example. When the response rate is
20 smaller than or equal to 1/3, the processing proceeds to step S4008, in which the rank of the
classification of the response rate of the apparatus of the category recorded in the apparatus
information DB 1106 is lowered by 1 uniformly. That is, when the classification of the
response rate set until now is High, the classification is changed to Medium and when it is
Medium, it is changed to Low. When it is already Low, it is not changed.
25 [0095]
Hereafter, the response update part 1107 performs the processing of steps S4002
to S4008 for each category of the apparatuses 1201.
[0096]
Here, the response rate is calculated by the expression (1) by way of example,
30 although the present invention is not limited thereto. Since the value of the response rate shows
the certainty of the magnitude of the stop power obtained upon the stop request, it is also
considered to use a standard deviation, for example. In this case, it is considered that the value
is smaller the certainty is higher, so that the same method can be used to realize the response
update processing.
19
[0097]
The recorded contents of the apparatus information DB 1106 reflect the response
characteristics for each apparatus category by the above series of processing.
[0098]
5 The regulation-force-for-each-apparatus prediction part 1109 calculates a
stoppable load for each apparatus 1201 with reference to the apparatus information DB 1106 and
transmits the stoppable load to the stop request information production part 1113 as regulation
force information for each apparatus in combination with information of the response rate. The
stoppable load for each apparatus is calculated by the expression (2):
10 [MATH. 2]
Stoppable Load (kW) = Rated Powerxp ... (2)
where (3=1 when the operation state in the time zone is on and p=0 when the
operation state in the time zone is off
15 [0099]
A convenience influence DB 1110 records therein disadvantage suffered by the
consumer 1200 by stopping the apparatus for each category of the apparatuses. Fig. 8 shows an
example of a table format stored in the convenience influence DB 1110. In Fig. 8, as an
example of the "apparatus classification", a system energy storage device, a water heater, an
20 electric vehicle charging device (EV charging) and an air conditioner are described. Further,
values of convenience deterioration level described in Fig. 8 are an example.
[0100]
Even when the system energy storage device (the energy storage function part
1304 of the power system 1300) is forcedly discharged, there is no influence on living of the
25 consumers 1200 and accordingly the convenience deterioration level thereof is set to 0. The
water heater may be heated any time as far as the water is boiling until the time that hot water is
demanded and accordingly it is considered that there is less influence on the convenience of the
consumers 1200. However, under certain circumstances, there is a risk that a hot-water supply
amount is lacking at the time that hot water is demanded. Accordingly, the convenience
30 deterioration level of the water heater is set to 1. Even in the EV charging, as far as charging is
completed until the time that EV is used next time, the charging may be made any time until the
charging is completed. However, if the charging is stopped and the charged amount is lacking
at the time that the EV is to be used, there occurs the situation that the EV cannot be used.
Accordingly, here, the convenience deterioration level of the EV charging is set to 2. On the
20
other hand, the air conditioner directly influences a comfort of the consumers 1200 when the air
conditioner is stopped, and accordingly the convenience deterioration level is set to 3.
Return to Fig. 3.
[0101]
5 The request transmittable frequency setting part 1111 sets a limit value for the
number of times that the stop requests are transmitted to the apparatuses 1200 of the consumers
1200 from the electric power regulating device 1100. In this example, 10 is set as an example
of the request transmittable frequency. This limit value may be fixed always or may be
changed each time regulation control of the load is performed.
10 [0102]
The request transmission frequency counter 1112 counts the stop requests of the
apparatuses 1201 transmitted to the consumers 1200 from the electric power demand regulating
device 1100 from the time that the overload judgment part 1102 judges the overload state.
[0103]
15 The stop request information production part 1113 produces information for
requesting change of the operation state of the apparatus 1201 of the consumer 1200 in order to
reduce the load applied to the equipment 1302.
[0104]
Operation of the stop request information production part 1113 is shown by the
20 flow chart of Fig. 9.
[0105]
In step S7001, the stop request information production part 1113 initializes
"maximum stop power Pmax" which is a variable used in the series of processing. In step
57002, the stop request information production part 1113 obtains request production sequence
25 number information n from the request transmission frequency counter 1112. Further, in step
57003, the stop request information production part 1113 obtains stop shortage amount
information Pa which is a calculation value of the stop shortage amount calculation part 1105.
Moreover, in step S7004, the stop request information production part 1113 obtains the
regulation force information for each apparatus which is a prediction result of the regulation-
30 force-for-each-apparatus prediction part 1109. Furthermore, in step S7005, the stop request
information production part 1113 refers to information of the request output flag of the apparatus
information DB 1106 and extracts records having a value of 0 as unrequested apparatus
extraction processing. Further, in step S7006, the stop request information production part 1113
rearranges the records extracted in step S7005 in order of small value of the convenience
21
influence levels recorded in the convenience influence DB 1110 as convenience sorting
processing.
[0106]
Thereafter, in step S7007, the stop request information production part 1113
5 judges whether a value of load stop request frequency n is smaller than or equal to the threshold
value. Here, as an example, 5 equal to a half of 10 set as the request transmittable frequency is
set as the threshold value.
[0107]
When the value of the load stop request frequency n is smaller than or equal to 5,
10 the processing proceeds to step S7008. In step S7008, the stop request information production
part 1113 further rearranges the records having the same convenience deterioration level in order
of large rated power.
[0108]
On the other hand, in step S7007, when the value of the load stop request
15 frequency n is larger than 5, the processing proceeds to step S7009. In step S7009, the stop
request information production part 1113 further rearranges the records having the same
convenience deterioration level in order of high response rate.
[0109]
After step S7008 or S7009, the processing of the stop request information
20 production part 1113 proceeds to step S7010.
[0110]
After step S7010, the processing is repeated in order of the records rearranged in
steps S7006 and S7008 or steps S7006 and S7009.
[0111]
25 In step S7011, the stop request information production part 1113 calculates the
"maximum stop power Pmax" of the variable. The maximum stop power Pmax is calculated by
the expression (3):
[MATH. 3]
Maximum Stop Power Pmax = ^^.^(StoppaWe Load Obtained in Step S7004)
- (3)
[0112]
30 In step S7012, the stop request information production part 1113 rewrites the
request output flags of the apparatus information DB 1106 for the apparatus 1201 of the records
22
to be subjected to the current loop processing of step S7010 from 0 to 1.
[0113]
Next, in step S7013, the stop request information production part 1113 compares
the maximum stop power Pmax with a value obtained by adding a fixed value a to the stop
5 shortage amount Pa obtained in step S7003. When Pmax<(Pa+a) (N in step S7013), the stop
request information production part 1113 returns to step S7010, in which the stop request
information production part 1113 adds the apparatus 1201 to which the stop request is issued and
performs the same processing (steps S7011 to S7013).
[0114]
10 On the other hand, when Pmax>(Pa+a), the stop request information production
part 1113 ends the processing. All of the apparatuses 1201 subjected to the loop processing of
step S7010 are the apparatuses 1201 to which the stop request is transmitted.
[0115]
Fig. 10 is a graph for illustrating the state of operation examples of the stop
15 request information production part 1113. In Fig. 10, the horizontal axis represents the number
of times of the stop requests. The maximum stop power Pmax and the results Pr of load
stopped by transmission of the request are shown for each of the number of times of the requests.
The vertical axis represents the load applied to the equipment 1302.
[0116]
20 First, in the first stop request (1 is described in triangular mark), 7 apparatuses
1201 including apparatuses a to g are requested to stop the load thereon for the stop shortage
amount Pa. As a result, the apparatuses a and d respond to the request. Until here, the series
of processing shown in Fig. 9 is once ended.
[0117]
25 Next, in the second stop request (2 is described in triangular mark), 5 apparatuses
including apparatuses h to 1 are requested to stop the load thereon for the stop shortage amount
Pa at that time. As a result, the apparatuses i, k and 1 respond to the request. Until here, the
series of processing shown in Fig. 9 is performed again.
[0118]
30 Further, in the third stop request (3 is described in triangular mark), the
apparatuses m and n are requested to stop the load thereon for the stop shortage amount Pa at
that time. As a result, both of the apparatuses m and n respond to the request. Similarly, until
here, the series of processing shown in Fig. 9 is performed again.
[0119]
23
The total of stop results until the processing for the third stop request exceeds the
necessary stop amount 2002 and accordingly the fourth and subsequent stop requests are not
required.
Return to Fig. 3.
5 [0120]
The request transmission part 1114 transmits the load stop request to the apparatus
of the record produced by the stop request information production part 1113.
[0121]
As described above, according to the embodiment, since the stop requests are
10 separately transmitted plural times to regulate the load amount, the apparatuses 1201 can be
stopped certainly so that the necessary load can be reduced securely and the apparatuses 1201
cannot be stopped excessively when the overload state of the equipment 1302 constituting the
power system 1300 is solved. Further, when the overload state is solved, reduction of
convenience of the consumers 1200 in case where the apparatuses 1201 are stopped can be
15 suppressed as small as possible.
[0122]
Further, the electric power demand regulating devices 11 and 1100 of the above
embodiments can be realized by executing a software program in which processing procedures
of the parts constituting the device are prescribed by a computer.
20 [0123]
Moreover, the embodiments of the present invention are examples for describing
the present invention and the scope of the present invention is not limited to only the
embodiments. The person skilled in the art can implement the present invention in various
aspects without departing from the spirit and scope of the present invention.
25 REFERENCE SIGNS LIST
[0124]
10 electric power demand regulating system
11, 1100 electric power demand regulating device
12, 1200 consumer
30 13,1300 power system
14, 1400 communication network
15 load apparatus
21 judgment part
24
22 production part
23 transmission part
1101 receiving part
1102 overload j udgment part
5 1103 necessary stop amount calculation part
1104 suppression response amount estimation part
1105 stop shortage amount calculation part
1106 apparatus information DB
1107 response update part
10 1108 request result DB
1109 regulation-force-for-each-apparatus prediction part
1110 convenience influence DB
1111 request transmittable frequency setting part
1112 request transmission frequency counter
15 1113 stop request information production part
1114 request transmission part
1201 apparatus
1202 setting change part
1203 set result transmission part
20 1301 distribution line
1302 equipment
1303 load state measurement part
1304 energy storage function part
1305 energy storage state measurement part
25 1306 state transmission part
WE CLAIM:
[Claim 1]
An electric power demand regulating system which regulates load applied to
equipment of a power system by load apparatuses operated by electric power from the power
system which supplies electric power to consumers, comprises
an electric power demand regulating device which makes selection of a load
apparatus to be requested to make a change of an operation state on basis of a regulation target
value which is an amount of load to be regulated and load information for each apparatus which
is information of each load apparatus when the load on the equipment is regulated and outputting
of a change request for requesting to make a change of the operation state of the selected load
apparatus plural times during a period from start to completion of regulation.
[Claim 2]
An electric power demand regulating system according to Claim 1, wherein
the electric power demand regulating device updates the regulation target value
after the change request is outputted and selects the load apparatus to be requested to make a
change of the operation state at a next change request on basis of the updated regulation target
value.
[Claim 3]
An electric power demand regulating system according to Claim 1, wherein
the electric power demand regulating device selects the load apparatus to be
requested to make a change of the operation state on basis of the regulation target value, the load
information for each apparatus and degree of change in convenience of the consumers in case
where the operation state of the load apparatuses is changed.
[Claim 4]
An electric power demand regulating system according to Claim 1, wherein
the electric power demand regulating device maintains a response rate
representing a probability that the operation state is changed when the change request is received
for each category of the load apparatuses while updating the response rate and selects the load
apparatus to be requested to make a change of the operation state on basis of the regulation target
value, the load information for each apparatus and the response rate.
[Claim 5]
An electric power demand regulating system according to Claim 4, wherein
the electric power demand regulating device counts the change requests outputted
from start time of the regulation and changes a selection rule for selecting the load apparatus to
26
be requested to make a change of the operation stale when the count reaches a predetermined
threshold value.
[Claim 6]
An electric power demand regulating system according to Claim 5, wherein
the electric power demand regulating device selects the load apparatus having
large rated power preferentially before the count reaches the threshold value and selects the load
apparatus having the high response rate preferentially after the count reaches the threshold value.
[Claim 7]
An electric power demand regulating system according to Claim 1, wherein
the load apparatuses include electrical apparatuses installed in the consumers
connected to the power system and operated by electric power from the power system and
storage battery systems connected to the power system and making accumulation of electricity
from the power system and discharge of electricity to the power system.
[Claim 8]
An electric power demand regulating device which regulates load applied to
equipment of a power system by load apparatuses operated by electric power from the power
system which supplies electric power to consumers, comprises:
a judgment part to decide that the load on the equipment is regulated;
a production part to select a load apparatus to be requested to make a change of an
operation state on basis of a regulation target value which is an amount of load to be regulated
and load information for each apparatus which is information of each load apparatus and produce
a change request for requesting to make a change of the operation state of the selected load
apparatus; and
a transmission part to output the change request to the consumers;
and wherein
the production part produces the change request plural time during a period from
start to completion of regulation and the transmission part transmits the change request each time
the change request is produced by the production part.
[Claim 9]
An electric power demand regulating method of regulating load applied to
equipment of a power system by load apparatuses operated by electric power from the power
system which supplies electric power to consumers, comprises:
a step of deciding that the load on the equipment is regulated;
a step of selecting a load apparatus to be requested to make a change of an
27
operation state on basis of a regulation target value which is an amount of load to be regulated
and load information for each apparatus which is information of each load apparatus; and
a step of producing a change request for requesting to make a change of the
operation state of the selected load apparatus to be outputted to the consumers plural times
during a period from start to completion of regulation.
| # | Name | Date |
|---|---|---|
| 1 | IB304.pdf | 2014-06-27 |
| 2 | FORM-5.pdf | 2014-06-27 |
| 3 | FORM-3.pdf | 2014-06-27 |
| 4 | 15682-383-Specification.pdf | 2014-06-27 |
| 5 | Other Document [28-06-2014(online)].pdf | 2014-06-28 |
| 6 | Form 13 [28-06-2014(online)].pdf_14.pdf | 2014-06-28 |
| 7 | Form 13 [28-06-2014(online)].pdf | 2014-06-28 |
| 8 | REVISED FORMS.pdf | 2014-07-03 |
| 9 | FORM-13.pdf | 2014-07-03 |
| 10 | 5001-DELNP-2014-Correspondence-Others-(09-07-2014).pdf | 2014-07-09 |
| 11 | 5001-DELNP-2014.pdf | 2014-07-11 |
| 12 | 5001-delnp-2014-English Translation-(05-09-2014).pdf | 2014-09-05 |
| 13 | 5001-delnp-2014-Correspondence Others-(05-09-2014).pdf | 2014-09-05 |
| 14 | 5001-DELNP-2014-Form 3-191114.pdf | 2014-12-10 |
| 15 | 5001-DELNP-2014-Correspondence-191114.pdf | 2014-12-10 |
| 16 | 5001-DELNP-2014-FER.pdf | 2018-08-14 |
| 17 | 5001-DELNP-2014-OTHERS [01-11-2018(online)].pdf | 2018-11-01 |
| 18 | 5001-DELNP-2014-Information under section 8(2) (MANDATORY) [01-11-2018(online)].pdf | 2018-11-01 |
| 19 | 5001-DELNP-2014-FORM 3 [01-11-2018(online)].pdf | 2018-11-01 |
| 20 | 5001-DELNP-2014-FER_SER_REPLY [01-11-2018(online)].pdf | 2018-11-01 |
| 21 | 5001-DELNP-2014-DRAWING [01-11-2018(online)].pdf | 2018-11-01 |
| 22 | 5001-DELNP-2014-COMPLETE SPECIFICATION [01-11-2018(online)].pdf | 2018-11-01 |
| 23 | 5001-DELNP-2014-CLAIMS [01-11-2018(online)].pdf | 2018-11-01 |
| 24 | 5001-DELNP-2014-ABSTRACT [01-11-2018(online)].pdf | 2018-11-01 |
| 25 | 5001-DELNP-2014-FORM-26 [11-05-2021(online)].pdf | 2021-05-11 |
| 26 | 5001-DELNP-2014-Correspondence to notify the Controller [11-05-2021(online)].pdf | 2021-05-11 |
| 27 | 5001-DELNP-2014-Written submissions and relevant documents [25-05-2021(online)].pdf | 2021-05-25 |
| 28 | 5001-DELNP-2014-PatentCertificate31-05-2021.pdf | 2021-05-31 |
| 29 | 5001-DELNP-2014-IntimationOfGrant31-05-2021.pdf | 2021-05-31 |
| 30 | 5001-DELNP-2014-US(14)-HearingNotice-(HearingDate-14-05-2021).pdf | 2021-10-17 |
| 31 | 5001-DELNP-2014-RELEVANT DOCUMENTS [21-08-2023(online)].pdf | 2023-08-21 |
| 1 | TOTALPATENTSEARCH_14-03-2018.pdf |