Sign In to Follow Application
View All Documents & Correspondence

Precast Wall Body Production Method, And Precast Wall Body Mold

Abstract: The present invention improves construction accuracy when constructing by suppressing a positional shift of a decorative member of a precast wall body. The present invention produces a precast wall body 10 by providing a precast wall body mold 20 obtained by inserting a joint mold 40 into a space S between a plurality of surface mold members 36 of a foundation mold 30, molding a decorative member 12 by inserting a decorative member 12 starting material 44 into said precast wall body mold 20 and applying pressure thereto from above the precast wall body mold 20, causing a joint material 46 to flow between the plurality of decorative members 12 where the joint mold 40 had been positioned after removing said joint mold 40; and removing the foundation mold 30 after curing for a prescribed interval of time.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
26 September 2023
Publication Number
38/2024
Publication Type
INA
Invention Field
CIVIL
Status
Email
Parent Application

Applicants

FUJITA CORPORATION
32-22, Nishishinjuku 4-chome, Shinjuku-ku, Tokyo 1608378

Inventors

1. FUJINUMA, Tomohiro
c/o Fujita Corporation, 32-22, Nishishinjuku 4-chome, Shinjuku-ku, Tokyo 1608378
2. FUJIKURA, Yusuke
c/o Fujita Corporation, 32-22, Nishishinjuku 4-chome, Shinjuku-ku, Tokyo 1608378

Specification

Documents

Application Documents

# Name Date
1 202317064594-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [26-09-2023(online)].pdf 2023-09-26
2 202317064594-STATEMENT OF UNDERTAKING (FORM 3) [26-09-2023(online)].pdf 2023-09-26
3 202317064594-REQUEST FOR EXAMINATION (FORM-18) [26-09-2023(online)].pdf 2023-09-26
4 202317064594-FORM 18 [26-09-2023(online)].pdf 2023-09-26
5 202317064594-FORM 1 [26-09-2023(online)].pdf 2023-09-26
6 202317064594-DRAWINGS [26-09-2023(online)].pdf 2023-09-26
7 202317064594-DECLARATION OF INVENTORSHIP (FORM 5) [26-09-2023(online)].pdf 2023-09-26
8 202317064594-COMPLETE SPECIFICATION [26-09-2023(online)].pdf 2023-09-26
9 202317064594-Proof of Right [30-11-2023(online)].pdf 2023-11-30
10 202317064594-FORM-26 [30-11-2023(online)].pdf 2023-11-30
11 202317064594-certified copy of translation [30-11-2023(online)].pdf 2023-11-30
12 202317064594-Certified Copy of Priority Document [30-11-2023(online)].pdf 2023-11-30
13 202317064594-FORM 3 [04-03-2024(online)].pdf 2024-03-04