Sign In to Follow Application
View All Documents & Correspondence

“Quick Throughput Recovery During Resumption From Outage Scenarios In A Hspa Network Using Cross Layer Information”

Abstract: The various embodiments of the present invention disclose a method of enabling Downlink (DL) flow control in a High Speed Packet Access (HSPA) network. The method comprises of detecting, by a User Equipment (UE) Radio Link Control (RLC) layer, one or more missing Packet Data Units (PDUs) during an Radio Frequency (RF) outage in a Dual Sim Dual Standby (DSDS) operation, triggering, by the UE RLC layer, generation of a status PDU indicating the one or more missing downlink PDUs, and initiating, by the NW RLC layer, a re-transmission of the one or more missing PDUs on receiving the status PDU from the UE, thereby speeding up a Transmission Control Protocol (TCP) operation. Figure 2

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
24 April 2015
Publication Number
48/2017
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
bangalore@knspartners.com
Parent Application
Patent Number
Legal Status
Grant Date
2024-04-05
Renewal Date

Applicants

SAMSUNG R&D INSTITUTE INDIA – BANGALORE PRIVATE LIMITED
# 2870, ORION Building, Bagmane Constellation Business Park, Outer Ring Road, Doddanakundi Circle, Marathahalli Post, Bangalore -560037, Karnataka, India

Inventors

1. DWARAKANATH, Pradeep
Employed at Samsung R&D Institute India – Bangalore Private Limited, having its office at, # 2870, ORION Building, Bagmane Constellation Business Park, Outer Ring Road, Doddanakundi Circle, Marathahalli Post, Bangalore -560037, Karnataka, India
2. SULAIMAN, Anies Shaik
Employed at Samsung R&D Institute India – Bangalore Private Limited, having its office at, # 2870, ORION Building, Bagmane Constellation Business Park, Outer Ring Road, Doddanakundi Circle, Marathahalli Post, Bangalore -560037, Karnataka, India
3. RAMU, Pushpa
Employed at Samsung R&D Institute India – Bangalore Private Limited, having its office at, # 2870, ORION Building, Bagmane Constellation Business Park, Outer Ring Road, Doddanakundi Circle, Marathahalli Post, Bangalore -560037, Karnataka, India
4. iv) MURUGESAN, Gopal Peyam
Employed at Samsung R&D Institute India – Bangalore Private Limited, having its office at, # 2870, ORION Building, Bagmane Constellation Business Park, Outer Ring Road, Doddanakundi Circle, Marathahalli Post, Bangalore -560037, Karnataka, India

Specification

SOFT COPY ATTACHED IN PDF

Documents

Application Documents

# Name Date
1 2101-CHE-2015-IntimationOfGrant05-04-2024.pdf 2024-04-05
1 SRIB-20141014-007_Provisional Specification_Filed with IPO on 24 April 2015.pdf 2015-05-19
2 SRIB-20141014-007_Drawings_Filed with IPO on 24 April 2015.pdf 2015-05-19
3 POA_Samsung R&D Institute India-new.pdf 2015-05-19
4 2101-CHE-2015-Power of Attorney-270815.pdf 2015-11-05
4 2101-CHE-2015-FER.pdf 2021-10-17
5 2101-CHE-2015-FORM 13 [25-10-2019(online)].pdf 2019-10-25
5 2101-CHE-2015-Form 1-270815.pdf 2015-11-05
6 2101-CHE-2015-FORM 18 [22-01-2019(online)].pdf 2019-01-22
6 2101-CHE-2015-Correspondence-270815.pdf 2015-11-05
7 REQUEST FOR CERTIFIED COPY [20-04-2016(online)].pdf 2016-04-20
7 OTHERS [07-04-2016(online)].pdf 2016-04-07
8 REQUEST FOR CERTIFIED COPY [20-04-2016(online)].pdf_40.pdf 2016-04-20
8 Drawing [07-04-2016(online)].pdf 2016-04-07
9 Description(Complete) [07-04-2016(online)].pdf 2016-04-07
10 REQUEST FOR CERTIFIED COPY [20-04-2016(online)].pdf_40.pdf 2016-04-20
10 Drawing [07-04-2016(online)].pdf 2016-04-07
11 REQUEST FOR CERTIFIED COPY [20-04-2016(online)].pdf 2016-04-20
11 OTHERS [07-04-2016(online)].pdf 2016-04-07
12 2101-CHE-2015-FORM 18 [22-01-2019(online)].pdf 2019-01-22
12 2101-CHE-2015-Correspondence-270815.pdf 2015-11-05
13 2101-CHE-2015-FORM 13 [25-10-2019(online)].pdf 2019-10-25
13 2101-CHE-2015-Form 1-270815.pdf 2015-11-05
14 2101-CHE-2015-Power of Attorney-270815.pdf 2015-11-05
14 2101-CHE-2015-FER.pdf 2021-10-17
15 POA_Samsung R&D Institute India-new.pdf 2015-05-19
15 2101-CHE-2015-FER_SER_REPLY [10-01-2022(online)].pdf 2022-01-10
16 SRIB-20141014-007_Drawings_Filed with IPO on 24 April 2015.pdf 2015-05-19
16 2101-CHE-2015-PatentCertificate05-04-2024.pdf 2024-04-05
17 2101-CHE-2015-IntimationOfGrant05-04-2024.pdf 2024-04-05
17 SRIB-20141014-007_Provisional Specification_Filed with IPO on 24 April 2015.pdf 2015-05-19

Search Strategy

1 2020-12-2214-44-26E_22-12-2020.pdf

ERegister / Renewals

3rd: 01 Jul 2024

From 24/04/2017 - To 24/04/2018

4th: 01 Jul 2024

From 24/04/2018 - To 24/04/2019

5th: 01 Jul 2024

From 24/04/2019 - To 24/04/2020

6th: 01 Jul 2024

From 24/04/2020 - To 24/04/2021

7th: 01 Jul 2024

From 24/04/2021 - To 24/04/2022

8th: 01 Jul 2024

From 24/04/2022 - To 24/04/2023

9th: 01 Jul 2024

From 24/04/2023 - To 24/04/2024

10th: 01 Jul 2024

From 24/04/2024 - To 24/04/2025

11th: 01 Apr 2025

From 24/04/2025 - To 24/04/2026