Robotic Crude Tank Cleaning System

Beta Tank Robotics Pvt Ltd
Granted App No 202141010823 Patent 549244 Chemical

Patent information

IP India · live record
Application number
202141010823
Filing date
15 March 2021
Status
Granted
Legal status
Inforce
Publication number
38/2022
Publication type
INA
Invention field
Chemical
Patent number
549244
Grant date
30 August 2024
Next renewal due
15 March 2028

Abstract

Not Submitted

Applicants

1
Cayman Island
BETA TANK ROBOTICS PVT LTD NO. 58, 4TH FLOOR, TP VENUGOPAL LAYOUT, ANANDNAGAR, BANGALORE, KARNATAKA, INDIA, 560024.

Inventors

1
India
D CHANDRASEKHARA3, WESTERN MANOR, ATMANANDA COLONY, SULTHANPALYA, BANGALORE, KARNATAKA, INDIA, 560032

Specification

Show full textCollapse

Construction -a. In front of the Robot is a wiper (1) driven by hydraulic power. This wiper picks up sludge from the tank deck or tank bottom and passes it into the crusher and towards the suction of sludge pump (4). b. The wiper (1) and the crusher is driven by a single hydro motor. The chain drive drives the dual sprocket gear (2) which in turn drives the wiper cum conveyor by a chain drive. c. A safety rated camera (3) is used to view the front of the robot. This also has a camera front glass washing system. d. A peristaltic pump (4) or a similar positive sludge pump with high solid tolerance is mounted on the main platform (6). e. The entire robot is covered by a top cover plate (7) to protect the robot from the top. f. The robot moves on crawler belts (8). The two belts are independently operated by two separate levers on the control panel.

g. A tail hose (9) connects the robot to the control panel outside the tank. This contains all the hydraulic hoses, water dosing hose, camera wire and sludge pumping hose between the robot and control panel outside the tank. h. The tail hose is connected to the Robot by a valve block. This valve block has two faces. One face is fitted on the robot and other face is fitted on the tail hose. This arrangement is for easy assembly and disassembly between the robot and the tail hose. i. The valve block is connected to the robot by brackets (11). j. The tail hose is resting and moving on castors (12) which is four wheels at each location, one in each quadrant "of a cross sectional view, to facilitate easy movement even when the hose is twisting or turning over to any side. k. The camera front glass is washed by a fixed window washing system. This system uses three nozzles washing the glass and water is fed by a pump located outside the control panel. 1. The system uses pressure compensated valve to operate two hydraulic circuits on a single pressure and tank line. This is to reduce the number of hydraulic hoses inside the tail hose. Working m. The robot moves on the two crawler belts. Each of the crawler belts move independently and is controlled from the control panel outside the tank. This crawler belts are used for the robot to move ahead, behind or turning. n. The view ahead is picked up by the safety rated camera and is conveyed to the control panel via a wire which passes inside the tail hose. The camera is equipped with a camera front glass washing by water which is served by a single water line common with the dosing pump. This washing is to remove sludge sticking on to the camera front. o. The wiper wipes the sludge off the tank bottom and moves this sludge by a conveyor system to the crusher. p. The crusher has stator blades and rotor blades which help to break the sludge into smaller parts, ensuring any solid pieces bigger than a certain size does not enter the pump.

q. The peristaltic pump sucks the sludge from the crusher output and pumps it into the sludge discharge line to the special sludge discharge hose located within the tail hose. r. All the movements of the pump, wiper and the crawler belts move on hydraulic power provided from a hydraulic power located outside the tank. The power is conveyed by hydraulic hoses between the hydraulic power pack and the tail hose. s. The tail hose is outfitted with castors to ease the movement of the hose. The hose itself is not powered for movement and is pulled by the robot. t. There is a dosing water hose providing water at the crusher. This dosing delivers high pressure water and helps the sludge movement easier by reducing its viscosity. u. The entire control is located outside the crude oil tank on a control panel. v. The hydraulic power pack is located outside the crude oil tank. The hydraulic power is provided to the robot through the control panel.

Documents

Sign in to open
Application documents
1 202141010823-FORM28_15-03-2021.pdf 15 Mar 2021
2 202141010823-Form-1_As Filed_15-03-2021.pdf 15 Mar 2021
3 202141010823-Form 2(Title Page)Provisional_15-03-2021.pdf 15 Mar 2021
4 202141010823-Description Provisional_As Filed_15-03-2021.pdf 15 Mar 2021
5 202141010823-Correspondence_Form-28_15-03-2021.pdf 15 Mar 2021
6 202141010823-Correspondence_15-03-2021.pdf 15 Mar 2021
7 202141010823-Claims_As Filed_15-03-2021.pdf 15 Mar 2021
8 202141010823-Form-5_After Provisional_14-03-2022.pdf 14 Mar 2022
9 202141010823-Form 2(Title Page)Complete_14-03-2022.pdf 14 Mar 2022
10 202141010823-Drawing_After Provisional_14-03-2022.pdf 14 Mar 2022
11 202141010823-DIPP Certificate_14-03-2022.pdf 14 Mar 2022
12 202141010823-Description(Complete)_As Filed_14-03-2022.pdf 14 Mar 2022
13 202141010823-Correspondence_After Provisional_14-03-2022.pdf 14 Mar 2022
14 202141010823-Claims_After Provisional_14-03-2022.pdf 14 Mar 2022
15 202141010823-Abstract_After Provisional_14-03-2022.pdf 14 Mar 2022
16 202141010823-STARTUP [30-07-2023(online)].pdf 30 Jul 2023
17 202141010823-FORM28 [30-07-2023(online)].pdf 30 Jul 2023
18 202141010823-FORM 18A [30-07-2023(online)].pdf 30 Jul 2023
19 202141010823-FORM 13 [30-07-2023(online)].pdf 30 Jul 2023
20 202141010823-FER.pdf 21 Dec 2023
21 202141010823-Proof of Right [20-06-2024(online)].pdf 20 Jun 2024
22 202141010823-FORM 3 [20-06-2024(online)].pdf 20 Jun 2024
23 202141010823-FER_SER_REPLY [20-06-2024(online)].pdf 20 Jun 2024
24 202141010823-DRAWING [20-06-2024(online)].pdf 20 Jun 2024
25 202141010823-CORRESPONDENCE [20-06-2024(online)].pdf 20 Jun 2024
26 202141010823-COMPLETE SPECIFICATION [20-06-2024(online)].pdf 20 Jun 2024
27 202141010823-CLAIMS [20-06-2024(online)].pdf 20 Jun 2024
28 202141010823-ABSTRACT [20-06-2024(online)].pdf 20 Jun 2024
29 202141010823-US(14)-HearingNotice-(HearingDate-05-08-2024).pdf 19 Jul 2024
30 202141010823-Correspondence to notify the Controller [03-08-2024(online)].pdf 03 Aug 2024
31 202141010823-Written submissions and relevant documents [19-08-2024(online)].pdf 19 Aug 2024
32 202141010823-Proof of Right [19-08-2024(online)].pdf 19 Aug 2024
33 202141010823-PETITION UNDER RULE 137 [19-08-2024(online)].pdf 19 Aug 2024
34 202141010823-PatentCertificate30-08-2024.pdf 30 Aug 2024
35 202141010823-IntimationOfGrant30-08-2024.pdf 30 Aug 2024
Search strategy
1Search_202141010823E_12-12-2023.pdf

ERegister / renewals

Inforce
3rd Renewed 04 Nov 2024 Period 15 Mar 2023 – 15 Mar 2024 · CBR 66619 · Certificate 161984 ₹800
4th Renewed 04 Nov 2024 Period 15 Mar 2024 – 15 Mar 2025 · CBR 66619 · Certificate 161985 ₹800
5th Renewed 04 Nov 2024 Period 15 Mar 2025 – 15 Mar 2026 · CBR 66619 · Certificate 161986 ₹800
6th Renewed 04 Nov 2024 Period 15 Mar 2026 – 15 Mar 2027 · CBR 66619 · Certificate 161987 ₹800
7th Renewed 04 Nov 2024 Period 15 Mar 2027 – 15 Mar 2028 · CBR 66619 · Certificate 161988 ₹2,400