Abstract: ABSTRACT "SELECTIVE CROWBAR RESPONSE FOR A POWER CONVERTER TO MITIGATE DEVICE FAILURE" A method for operating a multi-level bridge power converter of an electrical power system includes connecting a plurality of phases of the power converter to a common terminal at a DC side of the power converter so as to effectively equate the plurality of phases at a common electrical potential. The method may also include monitoring, via a controller, a plurality of devices of the power converter for faults. Upon detection of a fault in one or more of the plurality of devices, the method includes activating, via the controller, one or more protection devices of a crowbar of the power converter to prevent additional faults from occurring in remaining devices of the plurality of devices by diverting energy away from the remaining devices of the plurality of devices. Fig 4
Claims:PLEASE SEE THE ATTACHMENTS. , Description:PLEASE SEE THE ATTACHMENTS.
| # | Name | Date |
|---|---|---|
| 1 | 202044050104-8(i)-Substitution-Change Of Applicant - Form 6 [12-03-2024(online)].pdf | 2024-03-12 |
| 1 | 202044050104-STATEMENT OF UNDERTAKING (FORM 3) [18-11-2020(online)].pdf | 2020-11-18 |
| 2 | 202044050104-POWER OF AUTHORITY [18-11-2020(online)].pdf | 2020-11-18 |
| 2 | 202044050104-ASSIGNMENT DOCUMENTS [12-03-2024(online)].pdf | 2024-03-12 |
| 3 | 202044050104-PA [12-03-2024(online)].pdf | 2024-03-12 |
| 3 | 202044050104-FORM 1 [18-11-2020(online)].pdf | 2020-11-18 |
| 4 | 202044050104-FORM 18 [31-08-2023(online)].pdf | 2023-08-31 |
| 4 | 202044050104-DRAWINGS [18-11-2020(online)].pdf | 2020-11-18 |
| 5 | 202044050104-FORM 3 [28-04-2021(online)].pdf | 2021-04-28 |
| 5 | 202044050104-DECLARATION OF INVENTORSHIP (FORM 5) [18-11-2020(online)].pdf | 2020-11-18 |
| 6 | 202044050104-Proof of Right [21-12-2020(online)].pdf | 2020-12-21 |
| 6 | 202044050104-COMPLETE SPECIFICATION [18-11-2020(online)].pdf | 2020-11-18 |
| 7 | 202044050104-Correspondence-Letter [15-12-2020(online)].pdf | 2020-12-15 |
| 7 | 202044050104-Abstract_18-11-2020.jpg | 2020-11-18 |
| 8 | 202044050104-Correspondence-Letter [15-12-2020(online)].pdf | 2020-12-15 |
| 8 | 202044050104-Abstract_18-11-2020.jpg | 2020-11-18 |
| 9 | 202044050104-Proof of Right [21-12-2020(online)].pdf | 2020-12-21 |
| 9 | 202044050104-COMPLETE SPECIFICATION [18-11-2020(online)].pdf | 2020-11-18 |
| 10 | 202044050104-FORM 3 [28-04-2021(online)].pdf | 2021-04-28 |
| 10 | 202044050104-DECLARATION OF INVENTORSHIP (FORM 5) [18-11-2020(online)].pdf | 2020-11-18 |
| 11 | 202044050104-FORM 18 [31-08-2023(online)].pdf | 2023-08-31 |
| 11 | 202044050104-DRAWINGS [18-11-2020(online)].pdf | 2020-11-18 |
| 12 | 202044050104-PA [12-03-2024(online)].pdf | 2024-03-12 |
| 12 | 202044050104-FORM 1 [18-11-2020(online)].pdf | 2020-11-18 |
| 13 | 202044050104-POWER OF AUTHORITY [18-11-2020(online)].pdf | 2020-11-18 |
| 13 | 202044050104-ASSIGNMENT DOCUMENTS [12-03-2024(online)].pdf | 2024-03-12 |
| 14 | 202044050104-STATEMENT OF UNDERTAKING (FORM 3) [18-11-2020(online)].pdf | 2020-11-18 |
| 14 | 202044050104-8(i)-Substitution-Change Of Applicant - Form 6 [12-03-2024(online)].pdf | 2024-03-12 |
| 15 | 202044050104-FER.pdf | 2025-02-14 |
| 16 | 202044050104-FORM 3 [21-04-2025(online)].pdf | 2025-04-21 |
| 17 | 202044050104-Certified Copy of Priority Document [21-04-2025(online)].pdf | 2025-04-21 |
| 18 | 202044050104-OTHERS [17-07-2025(online)].pdf | 2025-07-17 |
| 19 | 202044050104-FER_SER_REPLY [17-07-2025(online)].pdf | 2025-07-17 |
| 20 | 202044050104-DRAWING [17-07-2025(online)].pdf | 2025-07-17 |
| 21 | 202044050104-CLAIMS [17-07-2025(online)].pdf | 2025-07-17 |
| 22 | 202044050104-ABSTRACT [17-07-2025(online)].pdf | 2025-07-17 |
| 1 | 202044050104_SearchStrategyNew_E_SearchHistory(81)E_06-02-2025.pdf |