Abstract: The present subject matter provides solar cells. An example solar cell (100) comprises a substrate (102). An intermediate layer (104) is provided on the substrate (102). The intermediate layer (104) comprises a barrier layer (202) and a dielectric layer (204). The barrier layer (202) is fabricated from a metal nitride. A bottom electrode layer (106) is provided on the intermediate layer (104). The bottom electrode layer (106) is fabricated from a metal nitride. <>
DESC:SOLAR CELL ,CLAIMS:AS ATTACHED
| # | Name | Date |
|---|---|---|
| 1 | Form 3 [06-03-2017(online)].pdf | 2017-03-06 |
| 2 | Drawing [06-03-2017(online)].pdf | 2017-03-06 |
| 3 | Description(Provisional) [06-03-2017(online)].pdf | 2017-03-06 |
| 4 | PROOF OF RIGHT [24-05-2017(online)].pdf | 2017-05-24 |
| 5 | Form 26 [24-05-2017(online)].pdf | 2017-05-24 |
| 6 | Correspondence by Agent_Power Of Attorney_30-05-2017.pdf | 2017-05-30 |
| 7 | 201741007845-PostDating-(06-03-2018)-(E-6-55-2018-CHE).pdf | 2018-03-06 |
| 8 | 201741007845-APPLICATIONFORPOSTDATING [06-03-2018(online)].pdf | 2018-03-06 |
| 9 | 201741007845-DRAWING [13-04-2018(online)].pdf | 2018-04-13 |
| 10 | 201741007845-CORRESPONDENCE-OTHERS [13-04-2018(online)].pdf | 2018-04-13 |
| 11 | 201741007845-COMPLETE SPECIFICATION [13-04-2018(online)].pdf | 2018-04-13 |
| 12 | 201741007845-CERTIFIED COPIES TRANSMISSION TO IB [25-04-2018(online)].pdf | 2018-04-25 |
| 13 | 201741007845-FORM-9 [03-05-2018(online)].pdf | 2018-05-03 |
| 14 | 201741007845-FORM 18A [21-05-2018(online)].pdf | 2018-05-21 |
| 15 | 201741007845-IntimationUnderRule24C(4).pdf | 2018-06-13 |
| 16 | 201741007845-Response to office action (Mandatory) [14-06-2018(online)].pdf | 2018-06-14 |
| 17 | 201741007845-Annexure (Optional) [14-06-2018(online)].pdf | 2018-06-14 |
| 18 | 201741007845-FER.pdf | 2018-06-29 |
| 19 | 201741007845-FORM 3 [12-10-2018(online)].pdf | 2018-10-12 |
| 20 | 201741007845-OTHERS [27-12-2018(online)].pdf | 2018-12-27 |
| 21 | 201741007845-FER_SER_REPLY [27-12-2018(online)].pdf | 2018-12-27 |
| 22 | 201741007845-CORRESPONDENCE [27-12-2018(online)].pdf | 2018-12-27 |
| 23 | 201741007845-COMPLETE SPECIFICATION [27-12-2018(online)].pdf | 2018-12-27 |
| 24 | 201741007845-CLAIMS [27-12-2018(online)].pdf | 2018-12-27 |
| 25 | Marked up Claims_Granted 305392_04-01-2019.pdf | 2019-01-04 |
| 26 | Drawings_Granted 305392_04-01-2019.pdf | 2019-01-04 |
| 27 | Description_Granted 305392_04-01-2019.pdf | 2019-01-04 |
| 28 | Claims_Granted 305392_04-01-2019.pdf | 2019-01-04 |
| 29 | Abstract_Granted 305392_04-01-2019.pdf | 2019-01-04 |
| 30 | 201741007845-PatentCertificate04-01-2019.pdf | 2019-01-04 |
| 31 | 201741007845-IntimationOfGrant04-01-2019.pdf | 2019-01-04 |
| 32 | 201741007845_Statement of Working_23-09-2021.pdf | 2021-09-23 |
| 33 | 201741007845-EDUCATIONAL INSTITUTION(S) [11-11-2021(online)].pdf | 2021-11-11 |
| 34 | 201741007845-Form 27_Statement of Working_26-09-2022.pdf | 2022-09-26 |
| 35 | 305392.Form 27.pdf | 2023-11-20 |
| 1 | Search201741007845EPE_28-06-2018.pdf |