Sign In to Follow Application
View All Documents & Correspondence

Solar Powered Thermal Jacket

Abstract: The present innovation relates to devices for producing heating effect by providing electrical power to heating coils, utilising battery that is charged by solar panel.The device consists of solar powered thermal jacket with cotton padded outer layer and inner layer woven with aluminium fabric, waistband, electric heating coils,On /Off switch, thermostat, indicator LEDs,power bank and solar panel.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
07 August 2019
Publication Number
07/2021
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
patent@iem.edu.in
Parent Application
Patent Number
Legal Status
Grant Date
2024-05-29
Renewal Date

Applicants

INSTITUTE OF ENGINEERING AND MANAGEMENT
Salt Lake Electronics Complex, Y-12, Gurukul, Street Number 18, EP Block, Sector V, Bidhannagar, Kolkata, West Bengal 700091

Inventors

1. Subhamoy Ray
70/2C Gouribari Lane, Kolkta-700004.
2. Satyajit Chakrabarti
Salt Lake Electronics Complex, Y-12, Gurukul, Street Number 18, EP Block, Sector V, Bidhannagar, Kolkata, West Bengal 700091

Specification

Claims:1. A solar powered thermal jacket, consisting of
- A two layered jacket with a cotton padded outer layer and an inner layer woven with aluminium fabric,
- A waistband,
- Electric heating coils embedded between inner and outer layer,
- On /Off switch,
- Thermostat,
- Three indicator LEDs,
- A batteryand
- Solar panel.
2. The aforementioned (claim 1) jacket is characterized by heating with the help of electric heating coils that are embedded between inner and outer layers, with the conductor being implanted within composite fiber material.
3. The aforementioned (claims 1 and 2) jacket includes a power bankthat provides electricity to the coils.
4. The aforementioned (claims 1,2 and 3) jacketconsists ofan ON / OFFswitch for activation of circuit.
5. The aforementioned (claims 1,2,3 and 4) jacketcomprises a thermostat where in the thermostat allows three stage temperature control: high, medium and low, actuated by the ON / OFF switch.
6. The aforementioned (claims 1,2,3,4and 5) jacket includes three LED bulbs to indicate operating temperature level: red, blue and green for high, medium and low temperature ranges, respectively.
7. The aforementioned (claims 1,2,3,4,5, and 6) jacketincludesbatteryto provide electric power to the heating coils.
8. The aforementioned (claims 1,2,3,4,5,6 and 7) jacketconsists of a solar panel where in the solar panel directly charges the battery using solar power to provide electrical power to the heating coils.
, Description:The thermal jacket comprises a thermostat, electric heating coils, rechargeable battery, solar panel and controller switch. The battery is charged by solar panel located in the back of the jacket. There is an on/off switch on the upper front section of the jacket. The switch activates the circuit leading to flow of electric charge through the heating coils. The heating coils are placed in between the fabric of the jacket and an aluminium fabric as a measure of safety. The aluminium fabric also helps the heat to spread evenly throughout the jacket. The temperature is controlled by a temperature controller or thermostat and associated sensors that are connected to it. The jacket temperature can be controlled for three levels: low, medium and high, indication for which is provided by three LEDs attached to the thermostat.

Documents

Orders

Section Controller Decision Date

Application Documents

# Name Date
1 201931031910-FORM 1 [07-08-2019(online)].pdf 2019-08-07
1 201931031910-IntimationOfGrant29-05-2024.pdf 2024-05-29
2 201931031910-DRAWINGS [07-08-2019(online)].pdf 2019-08-07
2 201931031910-PatentCertificate29-05-2024.pdf 2024-05-29
3 201931031910-Written submissions and relevant documents [28-05-2024(online)].pdf 2024-05-28
3 201931031910-COMPLETE SPECIFICATION [07-08-2019(online)].pdf 2019-08-07
4 201931031910-FORM 18 [16-03-2022(online)].pdf 2022-03-16
4 201931031910-Correspondence to notify the Controller [23-05-2024(online)].pdf 2024-05-23
5 201931031910-US(14)-ExtendedHearingNotice-(HearingDate-24-05-2024).pdf 2024-05-14
5 201931031910-FORM 13 [27-04-2022(online)].pdf 2022-04-27
6 201931031910-FER.pdf 2022-08-08
6 201931031910-2. Marked Copy under Rule 14(2) [08-04-2024(online)].pdf 2024-04-08
7 201931031910-Retyped Pages under Rule 14(1) [08-04-2024(online)].pdf 2024-04-08
7 201931031910-OTHERS [19-12-2022(online)].pdf 2022-12-19
8 201931031910-Written submissions and relevant documents [02-04-2024(online)].pdf 2024-04-02
8 201931031910-FORM 3 [19-12-2022(online)].pdf 2022-12-19
9 201931031910-Correspondence to notify the Controller [16-03-2024(online)].pdf 2024-03-16
9 201931031910-FER_SER_REPLY [19-12-2022(online)].pdf 2022-12-19
10 201931031910-ENDORSEMENT BY INVENTORS [19-12-2022(online)].pdf 2022-12-19
10 201931031910-US(14)-HearingNotice-(HearingDate-18-03-2024).pdf 2024-02-29
11 201931031910-EDUCATIONAL INSTITUTION(S) [19-12-2022(online)].pdf 2022-12-19
11 201931031910-EVIDENCE OF ELIGIBILTY RULE 24C1f [28-02-2024(online)].pdf 2024-02-28
12 201931031910-DRAWING [19-12-2022(online)].pdf 2022-12-19
12 201931031910-FORM 18A [28-02-2024(online)].pdf 2024-02-28
13 201931031910-CORRESPONDENCE [19-12-2022(online)].pdf 2022-12-19
13 201931031910-FORM-8 [28-02-2024(online)].pdf 2024-02-28
14 201931031910-COMPLETE SPECIFICATION [19-12-2022(online)].pdf 2022-12-19
14 201931031910-FORM-8 [23-02-2024(online)].pdf 2024-02-23
15 201931031910-CLAIMS [19-12-2022(online)].pdf 2022-12-19
15 201931031910-FORM-26 [11-07-2023(online)].pdf 2023-07-11
16 201931031910-ABSTRACT [19-12-2022(online)].pdf 2022-12-19
17 201931031910-FORM-26 [11-07-2023(online)].pdf 2023-07-11
17 201931031910-CLAIMS [19-12-2022(online)].pdf 2022-12-19
18 201931031910-FORM-8 [23-02-2024(online)].pdf 2024-02-23
18 201931031910-COMPLETE SPECIFICATION [19-12-2022(online)].pdf 2022-12-19
19 201931031910-CORRESPONDENCE [19-12-2022(online)].pdf 2022-12-19
19 201931031910-FORM-8 [28-02-2024(online)].pdf 2024-02-28
20 201931031910-DRAWING [19-12-2022(online)].pdf 2022-12-19
20 201931031910-FORM 18A [28-02-2024(online)].pdf 2024-02-28
21 201931031910-EDUCATIONAL INSTITUTION(S) [19-12-2022(online)].pdf 2022-12-19
21 201931031910-EVIDENCE OF ELIGIBILTY RULE 24C1f [28-02-2024(online)].pdf 2024-02-28
22 201931031910-ENDORSEMENT BY INVENTORS [19-12-2022(online)].pdf 2022-12-19
22 201931031910-US(14)-HearingNotice-(HearingDate-18-03-2024).pdf 2024-02-29
23 201931031910-Correspondence to notify the Controller [16-03-2024(online)].pdf 2024-03-16
23 201931031910-FER_SER_REPLY [19-12-2022(online)].pdf 2022-12-19
24 201931031910-Written submissions and relevant documents [02-04-2024(online)].pdf 2024-04-02
24 201931031910-FORM 3 [19-12-2022(online)].pdf 2022-12-19
25 201931031910-Retyped Pages under Rule 14(1) [08-04-2024(online)].pdf 2024-04-08
25 201931031910-OTHERS [19-12-2022(online)].pdf 2022-12-19
26 201931031910-FER.pdf 2022-08-08
26 201931031910-2. Marked Copy under Rule 14(2) [08-04-2024(online)].pdf 2024-04-08
27 201931031910-US(14)-ExtendedHearingNotice-(HearingDate-24-05-2024).pdf 2024-05-14
27 201931031910-FORM 13 [27-04-2022(online)].pdf 2022-04-27
28 201931031910-FORM 18 [16-03-2022(online)].pdf 2022-03-16
28 201931031910-Correspondence to notify the Controller [23-05-2024(online)].pdf 2024-05-23
29 201931031910-Written submissions and relevant documents [28-05-2024(online)].pdf 2024-05-28
29 201931031910-COMPLETE SPECIFICATION [07-08-2019(online)].pdf 2019-08-07
30 201931031910-PatentCertificate29-05-2024.pdf 2024-05-29
30 201931031910-DRAWINGS [07-08-2019(online)].pdf 2019-08-07
31 201931031910-FORM 1 [07-08-2019(online)].pdf 2019-08-07
31 201931031910-IntimationOfGrant29-05-2024.pdf 2024-05-29

Search Strategy

1 searchE_05-08-2022.pdf

ERegister / Renewals

3rd: 03 Jul 2024

From 07/08/2021 - To 07/08/2022

4th: 03 Jul 2024

From 07/08/2022 - To 07/08/2023

5th: 03 Jul 2024

From 07/08/2023 - To 07/08/2024

6th: 03 Jul 2024

From 07/08/2024 - To 07/08/2025

7th: 03 Jul 2024

From 07/08/2025 - To 07/08/2026

8th: 03 Jul 2024

From 07/08/2026 - To 07/08/2027

9th: 03 Jul 2024

From 07/08/2027 - To 07/08/2028

10th: 03 Jul 2024

From 07/08/2028 - To 07/08/2029

11th: 03 Jul 2024

From 07/08/2029 - To 07/08/2030

12th: 03 Jul 2024

From 07/08/2030 - To 07/08/2031

13th: 03 Jul 2024

From 07/08/2031 - To 07/08/2032

14th: 03 Jul 2024

From 07/08/2032 - To 07/08/2033

15th: 03 Jul 2024

From 07/08/2033 - To 07/08/2034

16th: 03 Jul 2024

From 07/08/2034 - To 07/08/2035

17th: 03 Jul 2024

From 07/08/2035 - To 07/08/2036

18th: 03 Jul 2024

From 07/08/2036 - To 07/08/2037

19th: 03 Jul 2024

From 07/08/2037 - To 07/08/2038

20th: 03 Jul 2024

From 07/08/2038 - To 07/08/2039