Sign In to Follow Application
View All Documents & Correspondence

Substitution Device, Information Processing System And Substitution Method

Abstract: A reconfiguration circuit (352) prepares for substituting for an information processing circuit (200) if a failure occurs in the information processing circuit (200) wherein the information processing circuit (200) generates on the basis of an input value a control value for controlling the output value of a controlled device and outputs the generated control value to the controlled device. When the preparation has been completed a reconfigured circuit (510) generates a control value output scheme and outputs a control value to the controlled device in accordance with the generated control value output scheme on behalf of the information processing circuit (200) wherein the control value output scheme is such that the deviation of the actual output value of the controlled device from an output value schedule for the controlled device said output value schedule having been created before the failure in the information processing circuit (200) gradually decreases with time and wherein the control value output scheme is based on: said output value schedule; the difference between an actual output value of the controlled device as obtained when said preparation has been completed and the corresponding scheduled output value indicated by the output value schedule; and an input value and a control value of the information processing circuit (200) that were obtained before the failure.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
17 June 2019
Publication Number
28/2019
Publication Type
INA
Invention Field
COMPUTER SCIENCE
Status
Email
patent@depenning.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-07-20
Renewal Date

Applicants

MITSUBISHI ELECTRIC CORPORATION
7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo 100-8310

Inventors

1. OMORI, Yasuhiro
c/o Mitsubishi Electric Corporation, 7-3, Marunouchi 2-chome, Chiyoda-ku, Tokyo 100-8310

Specification

We Claim:
[Claim 1] A substitution device comprising:
a substitution preparation unit to generate a control value for controlling an output value of a control target device based on an input value, and when a fault occurs in an information processing circuit that outputs the control value generated to the control target device, perform preparation for substituting for the information processing circuit; and
a substitution unit to generate, upon completion of the preparation, an output plan of a control value such that a difference between an actual output value of the control target device and an output value in a scheduled temporal transition gradually decreases, based on the scheduled temporal transition that is a temporal transition of an output value of the control target device, which is scheduled before occurrence of the fault in the information processing circuit, a difference between an actual output value of the control target device upon completion of the preparation and an output value in the scheduled temporal transition, and an input value and a control value before occurrence of the fault in the information processing circuit, and output a control value to the control target device instead of the information processing circuit according to the output plan generated.
[Claim 2] The substitution device according to claim 1, wherein the substitution
unit generates the output plan based on a difference between an actual output value of the control target device at a time when the preparation is completed and an output value in the scheduled temporal transition, which is generated as a result of absence of output of a control value during a period after occurrence of the fault in the information processing circuit until completion of the preparation. [Claim 3] The substitution device according to claim 1, wherein the substitution
unit generates the output plan based on an input value and a control value immediately before occurrence of the fault in the information processing circuit. [Claim 4] An information processing system comprising:
an information processing circuit to generate a control value for controlling an output value of a control target device based on an input value, and outputs the control value generated to the control target device; and
a substitution device to perform preparation for substituting for the information processing circuit when a fault occurs in the information processing circuit, and upon completion of the preparation, generate an output plan of a control value such that a difference between an actual output value of the control target device and an output value in a scheduled temporal transition gradually decreases, based on the scheduled temporal transition that is a temporal transition of an output value of the control target device, which is scheduled before occurrence of the fault in the information processing circuit, a difference between an actual output value of the control target device upon completion of the preparation and an output value in the scheduled temporal transition, and an input value and a control value before occurrence of the fault in the information processing circuit, and output a control value to the control target device instead of the information processing circuit according to the output plan generated. [Claim 5] The information processing system according to claim 4, wherein the
information processing circuit monitors the substitution device for detecting a fault in the substitution device. [Claim 6] A substitution method comprising:
generating a control value for controlling an output value of a control target device based on an input value, and when a fault occurs in an information processing circuit that outputs the control value generated to the control target device, performing
preparation for substituting for the information processing circuit, by a substitution device that substitutes for the information processing circuit; and
upon completion of the preparation, by the substitution device, generating an output plan of a control value such that a difference between an actual output value of
5 the control target device and an output value in a scheduled temporal transition gradually decreases, based on the scheduled temporal transition that is a temporal transition of an output value of the control target device, which is scheduled before occurrence of the fault in the information processing circuit, a difference between an actual output value of the control target device upon completion of the preparation and
) an output value in the scheduled temporal transition, and an input value and a control value before occurrence of the fault in the information processing circuit, and outputting a control value to the control target device instead of the information processing circuit according to the output plan generated.

Documents

Application Documents

# Name Date
1 201947023934-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [17-06-2019(online)].pdf 2019-06-17
2 201947023934-STATEMENT OF UNDERTAKING (FORM 3) [17-06-2019(online)].pdf 2019-06-17
3 201947023934-REQUEST FOR EXAMINATION (FORM-18) [17-06-2019(online)].pdf 2019-06-17
4 201947023934-PROOF OF RIGHT [17-06-2019(online)].pdf 2019-06-17
5 201947023934-POWER OF AUTHORITY [17-06-2019(online)].pdf 2019-06-17
6 201947023934-FORM 18 [17-06-2019(online)].pdf 2019-06-17
7 201947023934-FORM 1 [17-06-2019(online)].pdf 2019-06-17
8 201947023934-DRAWINGS [17-06-2019(online)].pdf 2019-06-17
9 201947023934-DECLARATION OF INVENTORSHIP (FORM 5) [17-06-2019(online)].pdf 2019-06-17
10 201947023934-COMPLETE SPECIFICATION [17-06-2019(online)].pdf 2019-06-17
11 201947023934-CLAIMS UNDER RULE 1 (PROVISIO) OF RULE 20 [17-06-2019(online)].pdf 2019-06-17
12 201947023934.pdf 2019-06-27
13 Correspondence by Agent_Form-1_01-07-2019.pdf 2019-07-01
14 201947023934-RELEVANT DOCUMENTS [02-07-2019(online)].pdf 2019-07-02
15 201947023934-MARKED COPIES OF AMENDEMENTS [02-07-2019(online)].pdf 2019-07-02
16 201947023934-FORM 13 [02-07-2019(online)].pdf 2019-07-02
17 201947023934-AMMENDED DOCUMENTS [02-07-2019(online)].pdf 2019-07-02
18 201947023934-FORM 3 [11-11-2019(online)].pdf 2019-11-11
19 201947023934-FORM 3 [14-07-2020(online)].pdf 2020-07-14
20 201947023934-FORM 3 [27-05-2021(online)].pdf 2021-05-27
21 201947023934-OTHERS [05-10-2021(online)].pdf 2021-10-05
22 201947023934-FORM 3 [05-10-2021(online)].pdf 2021-10-05
23 201947023934-FER_SER_REPLY [05-10-2021(online)].pdf 2021-10-05
24 201947023934-DRAWING [05-10-2021(online)].pdf 2021-10-05
25 201947023934-COMPLETE SPECIFICATION [05-10-2021(online)].pdf 2021-10-05
26 201947023934-CLAIMS [05-10-2021(online)].pdf 2021-10-05
27 201947023934-ABSTRACT [05-10-2021(online)].pdf 2021-10-05
28 201947023934-FER.pdf 2021-10-18
29 201947023934-FORM 3 [30-05-2022(online)].pdf 2022-05-30
30 201947023934-FORM 3 [18-05-2023(online)].pdf 2023-05-18
31 201947023934-PatentCertificate20-07-2023.pdf 2023-07-20
32 201947023934-IntimationOfGrant20-07-2023.pdf 2023-07-20

Search Strategy

1 2021-03-2212-20-21E_22-03-2021.pdf

ERegister / Renewals

3rd: 21 Aug 2023

From 10/01/2019 - To 10/01/2020

4th: 21 Aug 2023

From 10/01/2020 - To 10/01/2021

5th: 21 Aug 2023

From 10/01/2021 - To 10/01/2022

6th: 21 Aug 2023

From 10/01/2022 - To 10/01/2023

7th: 21 Aug 2023

From 10/01/2023 - To 10/01/2024

8th: 21 Aug 2023

From 10/01/2024 - To 10/01/2025

9th: 06 Dec 2024

From 10/01/2025 - To 10/01/2026