Sign In to Follow Application
View All Documents & Correspondence

Twin Wheel Plough Feeder Apparatus And Method

Abstract: A twin plough feeder apparatus (15) and method (20) for reclaiming higher capacity of stored bulk material (54) from a bunker (56) is disclosed. A pair of plough feeders (30, 32) each having twin plough wheel (34, 36) is installed in a tunnel (66) of the over ground bunker (56) stored with a bulk material (54). At least one plough feeder (30 or 32) is continuously traverse along a reclaim shelf (60) on rails (38) provided in the over ground bunker (56) and other plough feeder (30 or 32) is held in a standby state. The stored bulk material (54) from the reclaim shelf (60) is swept onto a belt conveyor (58) using a plurality of curved arms (52) of the twin plough wheel (34, 36) revolving on a vertical axis. The plough feeder (30 or 32) is moved to a maintenance bay (1 or 2) located at each end upon detection of breakdown and other plough feeder (30 or 32) is traverse along the reclaim shelf (60) to continuously reclaim higher capacity of stored bulk material (54). FIG. 3

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
09 August 2019
Publication Number
07/2021
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
patent@depenning.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-07-25
Renewal Date

Applicants

Thyssenkrupp Industries India Pvt, Ltd.
154-C, Mittal Tower, 15th Floor, 210, Nariman Point, Mumbai 400021
thyssenkrupp AG
ThyssenKrupp Allee 1, 45143 Essen, Germany

Inventors

1. Tadigadapa Venkata Satya Subramanya Srinivas
#14 Arunodaya CHS, RH-60, MIDC G Block, Sambajinagar, Chinchwad, Pune - 411019
2. Yashwant Sakhardande
A1-423, Five Gardens, Rahatani, Pune - 411017
3. Sandhya Jadhav
A306, Namarata Gloria, Ravet, Pune - 412101

Specification

We Claim:
1. A method (20) for reclaiming higher capacity of bulk material, comprising:
installing a pair of plough feeders (30, 32) each having twin plough wheel (34,
36) in a tunnel (66) of an over ground bunker (56) stored with a bulk material (54);
continuously traversing at least one plough feeder (30 or 32) along a reclaim shelf (60) on rails (38) provided in the over ground bunker (56) and holding other plough feeder (30 or 32) in a standby state;
sweeping the stored bulk material (54) firom the reclaim shelf (60) onto a belt conveyor (58) using a plurality of curved arms (52) of the twin plough wheel (34, 36) revolving on a vertical axis; and
moving the plough feeder (30 or 32) to a maintenance bay (1, 2) located at each end upon detection of breakdown and traversing other plough feeder (30 or 32) along the reclaim shelf (60) to continuously reclaim higher capacity of the stored bulk material (54).
2. The method (20) of claim 1, further comprising configuring the reclaim shelf (60) to intercept at an angle of repose to prevent the stored bulk material (54) firom flowing over edge of a reclaim table (70).
3. The method (20) of claim 1, further comprising:
mounting the twin plough wheels (34, 36) in an output shaft of a planetary gearbox (48); and
automatically or manually controlling an output tonnage of the twin plough wheels (34, 36) by varying and adjusting speed of the plough wheel (34, 36) using a hydraulic motor (50) /Variable Frequency motor and the planetary gearbox (48).

4. The method (20) of claim 1, further comprising orienting a first plough wheel arms (52) of the twin plough wheel (34, 36) in a clockwise direction and a second plough wheel arms (52) in an anti-clockwise direction or vice versa to reclaim higher capacity of bulk material (54).
5. The method (20) of claim 1, further comprising orienting the twin plough wheel (34, 36) in same direction to reclaim higher capacity of bulk material (54).
6. A twin wheel plough feeding apparatus (15), comprising:
a pair of plough feeders (30, 32) each having twin plough wheel (34, 36) mounted on an output shaft of a planetary gear box (48) and installed in a tunnel (66) of an over ground bunker (56) stored with a bulk material (54); and
a plurality of curved arms (52) of the twin plough wheel (34, 36) revolving on a vertical axis sweep the stored material (54) firom the reclaim shelf (60) onto a belt conveyor (58) wherein if one plough feeder (30 or 32) is parked for maintenance on a maintenance bay (1, 2) at each end other plough feeder (30 or 32) is in operation to continuously reclaim higher capacity of bulk material (54).
7. The apparatus (15) of claim 6, wherein the plough feeders (30, 32) are driven by a hydraulic power unit (40) mounted on a main frame (46 or Variable frequency drive
8. The apparatus (15) of claim 6, wherein the reclaim shelf (60) intercept at an angle of repose to prevent the stored bulk material (54) firom flowing over edge of the reclaim shelf (60).
9. The apparatus (15) of claim 6, wherein the twin plough wheels (34, 36) are mounted in an output shaft of a planetary gearbox (48) and an output tonnage of the

plough wheel (34, 36) is controlled by varying and adjusting speed of the plough wheel (34, 36) using a hydraulic motor (50) or Variable frequency drive motor and the planetary gearbox (48).

Documents

Application Documents

# Name Date
1 201941032291-ASSIGNMENT WITH VERIFIED COPY [02-08-2023(online)]-1.pdf 2023-08-02
1 201941032291-STATEMENT OF UNDERTAKING (FORM 3) [09-08-2019(online)].pdf 2019-08-09
2 201941032291-ASSIGNMENT WITH VERIFIED COPY [02-08-2023(online)].pdf 2023-08-02
2 201941032291-PROVISIONAL SPECIFICATION [09-08-2019(online)].pdf 2019-08-09
3 201941032291-FORM-16 [02-08-2023(online)]-1.pdf 2023-08-02
3 201941032291-FORM 1 [09-08-2019(online)].pdf 2019-08-09
4 201941032291-FORM-16 [02-08-2023(online)].pdf 2023-08-02
4 201941032291-DRAWINGS [09-08-2019(online)].pdf 2019-08-09
5 201941032291-POWER OF AUTHORITY [02-08-2023(online)]-1.pdf 2023-08-02
5 201941032291-FORM-26 [22-08-2019(online)].pdf 2019-08-22
6 Correspondence by Agent_Power of Attorney_23-08-2019.pdf.pdf 2019-08-23
6 201941032291-POWER OF AUTHORITY [02-08-2023(online)].pdf 2023-08-02
7 201941032291-IntimationOfGrant25-07-2023.pdf 2023-07-25
7 201941032291-FORM 18 [15-10-2019(online)].pdf 2019-10-15
8 201941032291-PatentCertificate25-07-2023.pdf 2023-07-25
8 201941032291-DRAWING [15-10-2019(online)].pdf 2019-10-15
9 201941032291-CLAIMS [13-01-2022(online)].pdf 2022-01-13
9 201941032291-CORRESPONDENCE-OTHERS [15-10-2019(online)].pdf 2019-10-15
10 201941032291-COMPLETE SPECIFICATION [13-01-2022(online)].pdf 2022-01-13
10 201941032291-COMPLETE SPECIFICATION [15-10-2019(online)].pdf 2019-10-15
11 201941032291-DRAWING [13-01-2022(online)].pdf 2022-01-13
11 201941032291-Proof of Right (MANDATORY) [28-11-2019(online)].pdf 2019-11-28
12 201941032291-FER_SER_REPLY [13-01-2022(online)].pdf 2022-01-13
12 Correspondence by Agent_Form-1_29-11-2019.pdf 2019-11-29
13 201941032291-FORM 3 [13-01-2022(online)].pdf 2022-01-13
13 201941032291-FORM-26 [03-12-2019(online)].pdf 2019-12-03
14 201941032291-Information under section 8(2) [13-01-2022(online)].pdf 2022-01-13
14 Correspondence by Agent_Power of Attorney_03-01-2020.pdf 2020-01-03
15 201941032291-OTHERS [13-01-2022(online)].pdf 2022-01-13
15 201941032291-REQUEST FOR CERTIFIED COPY [10-06-2020(online)].pdf 2020-06-10
16 201941032291-FORM 4(ii) [04-10-2021(online)].pdf 2021-10-04
16 201941032291-PETITION UNDER RULE 137 [13-01-2022(online)].pdf 2022-01-13
17 201941032291-FER.pdf 2021-10-17
18 201941032291-PETITION UNDER RULE 137 [13-01-2022(online)].pdf 2022-01-13
18 201941032291-FORM 4(ii) [04-10-2021(online)].pdf 2021-10-04
19 201941032291-OTHERS [13-01-2022(online)].pdf 2022-01-13
19 201941032291-REQUEST FOR CERTIFIED COPY [10-06-2020(online)].pdf 2020-06-10
20 201941032291-Information under section 8(2) [13-01-2022(online)].pdf 2022-01-13
20 Correspondence by Agent_Power of Attorney_03-01-2020.pdf 2020-01-03
21 201941032291-FORM 3 [13-01-2022(online)].pdf 2022-01-13
21 201941032291-FORM-26 [03-12-2019(online)].pdf 2019-12-03
22 201941032291-FER_SER_REPLY [13-01-2022(online)].pdf 2022-01-13
22 Correspondence by Agent_Form-1_29-11-2019.pdf 2019-11-29
23 201941032291-DRAWING [13-01-2022(online)].pdf 2022-01-13
23 201941032291-Proof of Right (MANDATORY) [28-11-2019(online)].pdf 2019-11-28
24 201941032291-COMPLETE SPECIFICATION [15-10-2019(online)].pdf 2019-10-15
24 201941032291-COMPLETE SPECIFICATION [13-01-2022(online)].pdf 2022-01-13
25 201941032291-CLAIMS [13-01-2022(online)].pdf 2022-01-13
25 201941032291-CORRESPONDENCE-OTHERS [15-10-2019(online)].pdf 2019-10-15
26 201941032291-DRAWING [15-10-2019(online)].pdf 2019-10-15
26 201941032291-PatentCertificate25-07-2023.pdf 2023-07-25
27 201941032291-FORM 18 [15-10-2019(online)].pdf 2019-10-15
27 201941032291-IntimationOfGrant25-07-2023.pdf 2023-07-25
28 201941032291-POWER OF AUTHORITY [02-08-2023(online)].pdf 2023-08-02
28 Correspondence by Agent_Power of Attorney_23-08-2019.pdf.pdf 2019-08-23
29 201941032291-FORM-26 [22-08-2019(online)].pdf 2019-08-22
29 201941032291-POWER OF AUTHORITY [02-08-2023(online)]-1.pdf 2023-08-02
30 201941032291-DRAWINGS [09-08-2019(online)].pdf 2019-08-09
30 201941032291-FORM-16 [02-08-2023(online)].pdf 2023-08-02
31 201941032291-FORM-16 [02-08-2023(online)]-1.pdf 2023-08-02
31 201941032291-FORM 1 [09-08-2019(online)].pdf 2019-08-09
32 201941032291-PROVISIONAL SPECIFICATION [09-08-2019(online)].pdf 2019-08-09
32 201941032291-ASSIGNMENT WITH VERIFIED COPY [02-08-2023(online)].pdf 2023-08-02
33 201941032291-STATEMENT OF UNDERTAKING (FORM 3) [09-08-2019(online)].pdf 2019-08-09
33 201941032291-ASSIGNMENT WITH VERIFIED COPY [02-08-2023(online)]-1.pdf 2023-08-02

Search Strategy

1 ssE_13-04-2021.pdf

ERegister / Renewals

3rd: 08 Aug 2023

From 09/08/2021 - To 09/08/2022

4th: 08 Aug 2023

From 09/08/2022 - To 09/08/2023

5th: 08 Aug 2023

From 09/08/2023 - To 09/08/2024

6th: 10 Jul 2024

From 09/08/2024 - To 09/08/2025

7th: 16 Jul 2025

From 09/08/2025 - To 09/08/2026