Abstract: An automatic winder includes a bobbin supporting section 7, a lower yarn guiding pipe 25, a bobbin supplying device 60, a bobbin-supplying-device driving motor 41, a bobbin-supporting-section driving motor 43, a yarn end holding opening 66, a yarn handling lever 31, and a control section 6. The bobbin supporting section 7 supports a yarn supplying bobbin 21. The bobbin-supplying-device driving motor 41 drives the bobbin supplying device 60. The bobbin-supporting-section driving motor 43 drives the bobbin supporting section 7. The control section 6 controls driving of the yarn handling lever 31. The yarn handling lever 31 is driven by a yarn-handling-lever driving motor 42 which is a dedicated driving means provided separately from the bobbin-supplying-device driving motor 41 and the bobbin-supporting-section driving motor 43.
| # | Name | Date |
|---|---|---|
| 1 | 3090-DEL-2010-Form-3-(07-06-2011).pdf | 2011-06-07 |
| 2 | 3090-DEL-2010-Correspondence Others-(07-06-2011).pdf | 2011-06-07 |
| 3 | 3090-del-2010-gpa.pdf | 2011-08-21 |
| 4 | 3090-del-2010-form-5.pdf | 2011-08-21 |
| 5 | 3090-del-2010-form-3.pdf | 2011-08-21 |
| 6 | 3090-del-2010-form-2.pdf | 2011-08-21 |
| 7 | 3090-del-2010-form-1.pdf | 2011-08-21 |
| 8 | 3090-del-2010-drawings.pdf | 2011-08-21 |
| 9 | 3090-del-2010-description (complete).pdf | 2011-08-21 |
| 10 | 3090-del-2010-correspondence-others.pdf | 2011-08-21 |
| 11 | 3090-del-2010-claims.pdf | 2011-08-21 |
| 12 | 3090-del-2010-abstract.pdf | 2011-08-21 |
| 13 | 3090-del-2010-Form-3-(20-02-2015).pdf | 2015-02-20 |
| 14 | 3090-del-2010-Correspondance Others-(20-02-2015).pdf | 2015-02-20 |
| 15 | 3090-DEL-2010-FER.pdf | 2018-08-08 |
| 16 | 3090-DEL-2010-OTHERS [16-11-2018(online)].pdf | 2018-11-16 |
| 17 | 3090-DEL-2010-Information under section 8(2) (MANDATORY) [16-11-2018(online)].pdf | 2018-11-16 |
| 18 | 3090-DEL-2010-FORM 3 [16-11-2018(online)].pdf | 2018-11-16 |
| 19 | 3090-DEL-2010-FER_SER_REPLY [16-11-2018(online)].pdf | 2018-11-16 |
| 20 | 3090-DEL-2010-DRAWING [16-11-2018(online)].pdf | 2018-11-16 |
| 21 | 3090-DEL-2010-COMPLETE SPECIFICATION [16-11-2018(online)].pdf | 2018-11-16 |
| 22 | 3090-DEL-2010-CLAIMS [16-11-2018(online)].pdf | 2018-11-16 |
| 23 | 3090-DEL-2010-certified copy of translation (MANDATORY) [16-11-2018(online)].pdf | 2018-11-16 |
| 24 | 3090-DEL-2010-Certified Copy of Priority Document (MANDATORY) [16-11-2018(online)].pdf | 2018-11-16 |
| 25 | 3090-DEL-2010-ABSTRACT [16-11-2018(online)].pdf | 2018-11-16 |
| 26 | 3090-DEL-2010-PatentCertificate11-06-2020.pdf | 2020-06-11 |
| 27 | 3090-DEL-2010-IntimationOfGrant11-06-2020.pdf | 2020-06-11 |
| 28 | 3090-DEL-2010-RELEVANT DOCUMENTS [09-09-2021(online)].pdf | 2021-09-09 |
| 29 | 3090-DEL-2010-RELEVANT DOCUMENTS [22-08-2022(online)].pdf | 2022-08-22 |
| 30 | 3090-DEL-2010-RELEVANT DOCUMENTS [14-09-2023(online)].pdf | 2023-09-14 |
| 1 | 3090DEL2010_21-11-2017.pdf |