Abstract: Processing methods and processing systems (20) are provided which are operative determining a time- dependent estimate of at least one response parameter that affects or represents a frequency response characteristics of a power grid (11). The time-dependent estimate of the at least one response parameter is determined as a function of time over a time interval for a generator unit commitment and load level over the time interval.
| # | Name | Date |
|---|---|---|
| 1 | 202547082833-STATEMENT OF UNDERTAKING (FORM 3) [01-09-2025(online)].pdf | 2025-09-01 |
| 2 | 202547082833-REQUEST FOR EXAMINATION (FORM-18) [01-09-2025(online)].pdf | 2025-09-01 |
| 3 | 202547082833-PROOF OF RIGHT [01-09-2025(online)].pdf | 2025-09-01 |
| 4 | 202547082833-PRIORITY DOCUMENTS [01-09-2025(online)].pdf | 2025-09-01 |
| 5 | 202547082833-FORM 18 [01-09-2025(online)].pdf | 2025-09-01 |
| 6 | 202547082833-FORM 1 [01-09-2025(online)].pdf | 2025-09-01 |
| 7 | 202547082833-DRAWINGS [01-09-2025(online)].pdf | 2025-09-01 |
| 8 | 202547082833-DECLARATION OF INVENTORSHIP (FORM 5) [01-09-2025(online)].pdf | 2025-09-01 |
| 9 | 202547082833-COMPLETE SPECIFICATION [01-09-2025(online)].pdf | 2025-09-01 |
| 10 | 202547082833-FORM-26 [02-09-2025(online)].pdf | 2025-09-02 |
| 11 | 202547082833-Proof of Right [03-09-2025(online)].pdf | 2025-09-03 |