Sign In to Follow Application
View All Documents & Correspondence

Method And Processing System For Processing Data Related To A Power Grid, And System Comprising A Power Grid

Abstract: Processing methods and processing systems (20) are provided which are operative determining a time- dependent estimate of at least one response parameter that affects or represents a frequency response characteristics of a power grid (11). The time-dependent estimate of the at least one response parameter is determined as a function of time over a time interval for a generator unit commitment and load level over the time interval.

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
01 September 2025
Publication Number
38/2025
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
Parent Application

Applicants

HITACHI ENERGY LTD
Brown-Boveri-Strasse 5 8050 Zürich

Inventors

1. YUAN, Kai
Kirsch-Anger 13 85591 Vaterstetten
2. SHCHETININ, Dmitry
Burghaldenstrasse 4 5600 Lenzburg
3. LARSSON, Mats
Langackerstrasse 20c 5102 Rupperswil

Specification

Documents

Application Documents

# Name Date
1 202547082833-STATEMENT OF UNDERTAKING (FORM 3) [01-09-2025(online)].pdf 2025-09-01
2 202547082833-REQUEST FOR EXAMINATION (FORM-18) [01-09-2025(online)].pdf 2025-09-01
3 202547082833-PROOF OF RIGHT [01-09-2025(online)].pdf 2025-09-01
4 202547082833-PRIORITY DOCUMENTS [01-09-2025(online)].pdf 2025-09-01
5 202547082833-FORM 18 [01-09-2025(online)].pdf 2025-09-01
6 202547082833-FORM 1 [01-09-2025(online)].pdf 2025-09-01
7 202547082833-DRAWINGS [01-09-2025(online)].pdf 2025-09-01
8 202547082833-DECLARATION OF INVENTORSHIP (FORM 5) [01-09-2025(online)].pdf 2025-09-01
9 202547082833-COMPLETE SPECIFICATION [01-09-2025(online)].pdf 2025-09-01
10 202547082833-FORM-26 [02-09-2025(online)].pdf 2025-09-02
11 202547082833-Proof of Right [03-09-2025(online)].pdf 2025-09-03