Sign In to Follow Application
View All Documents & Correspondence

Mega Mounts For Headstock Of A Two Wheeler Vehicle

Abstract: Described herein is a modular headstock frame [100] for vehicles. The modular headstock frame [100] includes a post member [102], at least two fork members [104] extending form the post member [102], and at least one mounting bracket [106a] and [106b] attached to the post member [102]. Each of the at least one mounting bracket [106a] and [106b] includes a plurality of mounting portions for mounting and supporting a plurality of vehicle components.[FIG. 4]

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
28 November 2017
Publication Number
27/2020
Publication Type
INA
Invention Field
MECHANICAL ENGINEERING
Status
Email
filing@prismipr.com
Parent Application
Patent Number
Legal Status
Grant Date
2023-03-31
Renewal Date

Applicants

ATHER ENERGY PVT. LTD.
3rd Floor, Tower D, IBC Knowledge Park, Bannerghatta Main Road, Bengaluru-560029, Karnataka, India

Inventors

1. BIKASH JYOTI BISWAS
House NO. 23, Kasturba Nagar, South Sarania, Ulubari, Guwahati, Assam, India - 781007
2. ADARSH KUMAR
Village: Shaharbanna Dakshin,Khajaraitha, PO: Kalwara, Dist: Khagaria, Bihar, India - 851216
3. RONAK HEMANI
Big Shop/ Flat No: 9 , Sector - 5 Market, Rourkela - 2 Dist : Sundargarh, Odisha, India - 769002

Specification

DESC:As attached in PDF ,CLAIMS:As attached in PDF

Documents

Application Documents

# Name Date
1 201741042680-STATEMENT OF UNDERTAKING (FORM 3) [28-11-2017(online)]_61.pdf 2017-11-28
2 201741042680-STATEMENT OF UNDERTAKING (FORM 3) [28-11-2017(online)].pdf 2017-11-28
3 201741042680-PROVISIONAL SPECIFICATION [28-11-2017(online)]_120.pdf 2017-11-28
4 201741042680-PROVISIONAL SPECIFICATION [28-11-2017(online)].pdf 2017-11-28
5 201741042680-FORM FOR STARTUP [28-11-2017(online)].pdf 2017-11-28
6 201741042680-FORM FOR SMALL ENTITY(FORM-28) [28-11-2017(online)]_91.pdf 2017-11-28
7 201741042680-FORM FOR SMALL ENTITY(FORM-28) [28-11-2017(online)].pdf 2017-11-28
8 201741042680-FORM 1 [28-11-2017(online)].pdf 2017-11-28
9 201741042680-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [28-11-2017(online)]_126.pdf 2017-11-28
10 201741042680-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [28-11-2017(online)].pdf 2017-11-28
11 201741042680-EVIDENCE FOR REGISTRATION UNDER SSI [28-11-2017(online)].pdf 2017-11-28
12 201741042680-DRAWINGS [28-11-2017(online)]_86.pdf 2017-11-28
13 201741042680-DRAWINGS [28-11-2017(online)].pdf 2017-11-28
14 201741042680-Proof of Right (MANDATORY) [10-01-2018(online)].pdf 2018-01-10
15 Correspondence by Agent_Form 1_15-01-2018.pdf 2018-01-15
16 201741042680-FORM-26 [18-01-2018(online)].pdf 2018-01-18
17 Correspondence By Agent_Form 1_22-01-2018.pdf 2018-01-22
18 201741042680-FORM FOR STARTUP [14-11-2018(online)].pdf 2018-11-14
19 201741042680-EVIDENCE FOR REGISTRATION UNDER SSI [14-11-2018(online)].pdf 2018-11-14
20 201741042680-ENDORSEMENT BY INVENTORS [14-11-2018(online)].pdf 2018-11-14
21 201741042680-DRAWING [14-11-2018(online)].pdf 2018-11-14
22 201741042680-COMPLETE SPECIFICATION [14-11-2018(online)].pdf 2018-11-14
23 201741042680-FORM 18 [07-06-2019(online)].pdf 2019-06-07
24 201741042680-FORM-26 [30-06-2020(online)].pdf 2020-06-30
25 201741042680-FORM 13 [30-06-2020(online)].pdf 2020-06-30
26 201741042680-FER_SER_REPLY [21-06-2021(online)].pdf 2021-06-21
27 201741042680-CLAIMS [21-06-2021(online)].pdf 2021-06-21
28 201741042680-FER.pdf 2021-10-17
29 201741042680-PatentCertificate31-03-2023.pdf 2023-03-31
30 201741042680-IntimationOfGrant31-03-2023.pdf 2023-03-31
31 201741042680-PROOF OF ALTERATION [14-04-2023(online)].pdf 2023-04-14
32 201741042680-PROOF OF ALTERATION [25-09-2024(online)].pdf 2024-09-25

Search Strategy

1 2021-06-2201-31-00AE_22-06-2021.pdf
2 2020-12-0715-42-21E_07-12-2020.pdf

ERegister / Renewals

3rd: 18 May 2023

From 28/11/2019 - To 28/11/2020

4th: 18 May 2023

From 28/11/2020 - To 28/11/2021

5th: 18 May 2023

From 28/11/2021 - To 28/11/2022

6th: 18 May 2023

From 28/11/2022 - To 28/11/2023

7th: 26 May 2023

From 28/11/2023 - To 28/11/2024

8th: 11 Nov 2024

From 28/11/2024 - To 28/11/2025

9th: 03 Nov 2025

From 28/11/2025 - To 28/11/2026