Swithced Reluctance Motor With Several Single Phase Slices

Chara Technologies Pvt. Ltd.
Granted App No 202347063393 Patent 569652 Electrical

Patent information

IP India · live record
Application number
202347063393
Filing date
21 September 2023
Status
Granted
Legal status
Inforce
Publication number
40/2023
Publication type
INA
Invention field
Electrical
Patent number
569652
Grant date
07 August 2025
Next renewal due
05 March 2027

Abstract

The embodiments herein provide a multitude of single-phase Switch Reluctance Motor (SRM) arranged in a suitable fashion in order to achieve uniform torque with complete material utilization. The embodiment herein also provides a series of single-phase Switch Reluctance Motor (SRM) arranged in appropriate manner for better utilization of material leading to better efficiencies, reduced cost, reduced size or weight and reduction in torque ripple and noise. In addition, the embodiments herein also provide a two-slice SRM system and method, which correspondingly resolves the starting problem.

Applicants

1
India
CHARA TECHNOLOGIES PVT. LTD. #316 14th A Cross, 17th Main, HSR 4th Sector Karnataka Bengaluru 560 102

Inventors

3
India
KESHAVACHAR, Bhaktha Ram#316,14th A Cross, 17th Main, Sector 4, HSR Layout, Karnataka. Bengaluru 560 102
India
SHARMA, Ravi Prasad#767, 14th Cross, JP Nagar 1 Phase,, Karnataka. Bangalore 560078
India
BALASUBRAMANIAN, Mahalingam KoushikA101, Uma Sree Dream World Apartment, 49/1&2, Hosur Main Road, Kudlu Gate. Bengaluru 560068

Documents

Sign in to open
Orders
Section 43(1)Controller: Devika R Nair 07 Aug 2025
Section 43(1)Controller: Devika R Nair 07 Aug 2025
Application documents
1 202347063393-STATEMENT OF UNDERTAKING (FORM 3) [21-09-2023(online)].pdf 21 Sep 2023
2 202347063393-PROOF OF RIGHT [21-09-2023(online)].pdf 21 Sep 2023
3 202347063393-PRIORITY DOCUMENTS [21-09-2023(online)].pdf 21 Sep 2023
4 202347063393-POWER OF AUTHORITY [21-09-2023(online)].pdf 21 Sep 2023
5 202347063393-NOTIFICATION OF INT. APPLN. NO. & FILING DATE (PCT-RO-105-PCT Pamphlet) [21-09-2023(online)].pdf 21 Sep 2023
6 202347063393-FORM FOR SMALL ENTITY(FORM-28) [21-09-2023(online)].pdf 21 Sep 2023
7 202347063393-FORM 1 [21-09-2023(online)].pdf 21 Sep 2023
8 202347063393-EVIDENCE FOR REGISTRATION UNDER SSI(FORM-28) [21-09-2023(online)].pdf 21 Sep 2023
9 202347063393-DRAWINGS [21-09-2023(online)].pdf 21 Sep 2023
10 202347063393-DECLARATION OF INVENTORSHIP (FORM 5) [21-09-2023(online)].pdf 21 Sep 2023
11 202347063393-COMPLETE SPECIFICATION [21-09-2023(online)].pdf 21 Sep 2023
12 202347063393-FORM 3 [17-11-2023(online)].pdf 17 Nov 2023
13 202347063393-STARTUP [04-07-2024(online)].pdf 04 Jul 2024
14 202347063393-FORM28 [04-07-2024(online)].pdf 04 Jul 2024
15 202347063393-FORM 18A [04-07-2024(online)].pdf 04 Jul 2024
16 202347063393-FER.pdf 31 Jul 2024
17 202347063393-FORM 3 [25-10-2024(online)].pdf 25 Oct 2024
18 202347063393-FORM 4 [28-01-2025(online)].pdf 28 Jan 2025
19 202347063393-OTHERS [28-02-2025(online)].pdf 28 Feb 2025
20 202347063393-MARKED COPIES OF AMENDEMENTS [28-02-2025(online)].pdf 28 Feb 2025
21 202347063393-Information under section 8(2) [28-02-2025(online)].pdf 28 Feb 2025
22 202347063393-FORM 13 [28-02-2025(online)].pdf 28 Feb 2025
23 202347063393-FER_SER_REPLY [28-02-2025(online)].pdf 28 Feb 2025
24 202347063393-DRAWING [28-02-2025(online)].pdf 28 Feb 2025
25 202347063393-COMPLETE SPECIFICATION [28-02-2025(online)].pdf 28 Feb 2025
26 202347063393-CLAIMS [28-02-2025(online)].pdf 28 Feb 2025
27 202347063393-AMMENDED DOCUMENTS [28-02-2025(online)].pdf 28 Feb 2025
28 202347063393-US(14)-HearingNotice-(HearingDate-08-05-2025).pdf 16 Apr 2025
29 202347063393-Correspondence to notify the Controller [02-05-2025(online)].pdf 02 May 2025
30 202347063393-Information under section 8(2) [21-05-2025(online)].pdf 21 May 2025
31 202347063393-FORM 3 [21-05-2025(online)].pdf 21 May 2025
32 202347063393-Written submissions and relevant documents [23-05-2025(online)].pdf 23 May 2025
33 202347063393-MARKED COPIES OF AMENDEMENTS [23-05-2025(online)].pdf 23 May 2025
34 202347063393-FORM 13 [23-05-2025(online)].pdf 23 May 2025
35 202347063393-AMMENDED DOCUMENTS [23-05-2025(online)].pdf 23 May 2025
36 202347063393-US(14)-HearingNotice-(HearingDate-18-07-2025).pdf 04 Jul 2025
37 202347063393-Correspondence to notify the Controller [15-07-2025(online)].pdf 15 Jul 2025
38 202347063393-US(14)-ExtendedHearingNotice-(HearingDate-21-07-2025)-1200.pdf 16 Jul 2025
39 202347063393-Correspondence to notify the Controller [17-07-2025(online)].pdf 17 Jul 2025
40 202347063393-MARKED COPIES OF AMENDEMENTS [23-07-2025(online)].pdf 23 Jul 2025
41 202347063393-FORM-26 [23-07-2025(online)].pdf 23 Jul 2025
42 202347063393-FORM 13 [23-07-2025(online)].pdf 23 Jul 2025
43 202347063393-AMENDED DOCUMENTS [23-07-2025(online)].pdf 23 Jul 2025
44 202347063393-Written submissions and relevant documents [01-08-2025(online)].pdf 01 Aug 2025
45 202347063393-MARKED COPIES OF AMENDEMENTS [01-08-2025(online)].pdf 01 Aug 2025
46 202347063393-FORM FOR STARTUP [01-08-2025(online)].pdf 01 Aug 2025
47 202347063393-FORM 13 [01-08-2025(online)].pdf 01 Aug 2025
48 202347063393-EVIDENCE FOR REGISTRATION UNDER SSI [01-08-2025(online)].pdf 01 Aug 2025
49 202347063393-Annexure [01-08-2025(online)].pdf 01 Aug 2025
50 202347063393-Annexure [01-08-2025(online)]-1.pdf 01 Aug 2025
51 202347063393-AMMENDED DOCUMENTS [01-08-2025(online)].pdf 01 Aug 2025
52 202347063393-PatentCertificate07-08-2025.pdf 07 Aug 2025
53 202347063393-IntimationOfGrant07-08-2025.pdf 07 Aug 2025
Search strategy
1SearchStrategy_202347063393E_16-07-2024.pdf

ERegister / renewals

Inforce
3rd Renewed 11 Sep 2025 Period 05 Mar 2024 – 05 Mar 2025 · CBR 53711 · Certificate 64865 ₹800
4th Renewed 11 Sep 2025 Period 05 Mar 2025 – 05 Mar 2026 · CBR 53711 · Certificate 64866 ₹800
5th Renewed 11 Sep 2025 Period 05 Mar 2026 – 05 Mar 2027 · CBR 53711 · Certificate 64867 ₹800