Sign In to Follow Application
View All Documents & Correspondence

Optiprime Hybrid Generator

Abstract: OPTIPRIME HYBRID GENERATOR The present invention discloses an Optiprime Hybrid Generator System (100), which comprises of: atleast one renewable source (10) of power, atleast one fossil fuel driven generator (12), a control panel (14) with hybrid controller functionally connected to said renewable source (10) and said fuel driven generator (12), said control panel (14) is configured to integrate all components of the system (100) and to perform the function of power management, a battery bank (16) connected to said control panel (14) to provide power to the control panel (14) in case of unavailability of said renewable source (10) and said fossil fuel driven generator (12), an inverter (18) connected to said control panel (14), an auxiliary load (DC) (20) electrically connected to said control panel (14), and an auxiliary load (AC) (22) electrically connected to said invertor (18). Figure 1

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
20 February 2024
Publication Number
16/2025
Publication Type
INA
Invention Field
ELECTRICAL
Status
Email
Parent Application

Applicants

KIRLOSKAR OIL ENGINES LIMITED
Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.

Inventors

1. Suhas Suryawanshi
Kirloskar Oil Engines Limited, Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.
2. Sabu Nair
Kirloskar Oil Engines Limited, Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.
3. Dr Yogesh Vishnu Aghav
Ganga Bhagyoday, Sinhgad Road, Pune - 411 051, Maharashtra, India.; Nationality: Indian
4. Ajit Ashok Kate
J-101, Park Express, I+J Co Hsg Society Ltd, Balewadi High Street, Pune - 411 045, Maharashtra, India.; Nationality: Indian,
5. Devangkumar Bharatkumar Kansara
A-104, Silver Skies, Swathamali Mandir Road, Jadhavwadi, Chikhali, Pune - 411 062, Maharashtra, India.; Nationality: Indian.

Specification

WE CLAIM:
1. An Optiprime Hybrid Generator System (100) comprising:
atleast one renewable source (10) of power;
atleast one fossil fuel driven generator (12);
a control panel (14) with hybrid controller functionally connected to said
renewable source (10) and said fuel driven generator (12), said control panel (14)
is configured to integrate all components of the system (100) and to perform the
function of power management;
a battery bank (16) connected to said control panel (14) to provide power to
the control panel (14) in case of unavailability of said renewable source (10) and
said fossil fuel driven generator (12);
an inverter (18) connected to said control panel (14);
an auxiliary load (DC) (20) electrically connected to said control panel (14);
and
an auxiliary load (AC) (22) electrically connected to said invertor (18).
2. The Optiprime Hybrid Generator (100) system as claimed in claim 1, further
comprises a Waste Heat Recovery System (WHRS) (24) connected to said fuel
driven generator (12) and configured to recover heat energy from the hot flue gases
of the fossil fuel generator (12) and utilize it for space heating.
3. The Optiprime Hybrid Generator System (100) as claimed in claim 2, wherein
said Waste Heat Recovery System (WHRS) (24) consists of primary heat exchanger
(204), Mild Steel (MS) water tank (202), primary side water circulation pump, three
way modulating valve, air handling Unit (206) for space heating, secondary side
water circulation pump, secondary heat exchanger (208), control panel and water
level switch.
4. The Optiprime Hybrid Generator System (100) as claimed in claim 1, wherein
said fossil fuel driven generator (12) operates either in solo or in synchronization
operating mode depending upon load demand.
5. The Optiprime Hybrid Generator System(100) as claimed in claim 1, wherein
said renewable source is selected from solar power or wind power or in combination
as per source availability.
6. The Optiprime

Documents

Application Documents

# Name Date
1 202421011816-STATEMENT OF UNDERTAKING (FORM 3) [20-02-2024(online)].pdf 2024-02-20
2 202421011816-PROVISIONAL SPECIFICATION [20-02-2024(online)].pdf 2024-02-20
3 202421011816-POWER OF AUTHORITY [20-02-2024(online)].pdf 2024-02-20
4 202421011816-FORM 1 [20-02-2024(online)].pdf 2024-02-20
5 202421011816-DRAWINGS [20-02-2024(online)].pdf 2024-02-20
6 202421011816-Proof of Right [21-03-2024(online)].pdf 2024-03-21
7 202421011816-FORM 3 [21-03-2024(online)].pdf 2024-03-21
8 202421011816-ORIGINAL UR 6(1A) FORM 1-200624.pdf 2024-06-26
9 202421011816-FORM-5 [19-02-2025(online)].pdf 2025-02-19
10 202421011816-ENDORSEMENT BY INVENTORS [19-02-2025(online)].pdf 2025-02-19
11 202421011816-DRAWING [19-02-2025(online)].pdf 2025-02-19
12 202421011816-CORRESPONDENCE-OTHERS [19-02-2025(online)].pdf 2025-02-19
13 202421011816-COMPLETE SPECIFICATION [19-02-2025(online)].pdf 2025-02-19
14 202421011816-FORM 18 [04-03-2025(online)].pdf 2025-03-04
15 202421011816-Proof of Right [21-03-2025(online)].pdf 2025-03-21
16 202421011816-FORM 3 [21-03-2025(online)].pdf 2025-03-21
17 202421011816-Request Letter-Correspondence [07-04-2025(online)].pdf 2025-04-07
18 202421011816-Power of Attorney [07-04-2025(online)].pdf 2025-04-07
19 202421011816-Covering Letter [07-04-2025(online)].pdf 2025-04-07
20 Abstract.jpg 2025-04-08
21 202421011816-FORM-9 [11-04-2025(online)].pdf 2025-04-11
22 202421011816-FORM 18A [11-04-2025(online)].pdf 2025-04-11
23 202421011816-FER.pdf 2025-06-27
24 202421011816-POA [01-08-2025(online)].pdf 2025-08-01
25 202421011816-FORM-26 [01-08-2025(online)].pdf 2025-08-01
26 202421011816-FORM 13 [01-08-2025(online)].pdf 2025-08-01
27 202421011816-OTHERS [30-09-2025(online)].pdf 2025-09-30
28 202421011816-FER_SER_REPLY [30-09-2025(online)].pdf 2025-09-30
29 202421011816-DRAWING [30-09-2025(online)].pdf 2025-09-30
30 202421011816-CLAIMS [30-09-2025(online)].pdf 2025-09-30
31 202421011816-Proof of Right [24-11-2025(online)].pdf 2025-11-24
32 202421011816-FORM-8 [24-11-2025(online)].pdf 2025-11-24
33 202421011816-FORM-5 [24-11-2025(online)].pdf 2025-11-24

Search Strategy

1 202421011816_SearchStrategyNew_E_SearchStrategy202421011816E_25-06-2025.pdf