Optiprime Hybrid Generator

Kirloskar Oil Engines Limited
Reply Filed App No 202421011816 Electrical

Patent information

IP India · live record
Application number
202421011816
Filing date
20 February 2024
Status
Reply Filed
Publication number
16/2025
Publication type
INA
Invention field
Electrical

Abstract

OPTIPRIME HYBRID GENERATOR The present invention discloses an Optiprime Hybrid Generator System (100), which comprises of: atleast one renewable source (10) of power, atleast one fossil fuel driven generator (12), a control panel (14) with hybrid controller functionally connected to said renewable source (10) and said fuel driven generator (12), said control panel (14) is configured to integrate all components of the system (100) and to perform the function of power management, a battery bank (16) connected to said control panel (14) to provide power to the control panel (14) in case of unavailability of said renewable source (10) and said fossil fuel driven generator (12), an inverter (18) connected to said control panel (14), an auxiliary load (DC) (20) electrically connected to said control panel (14), and an auxiliary load (AC) (22) electrically connected to said invertor (18). Figure 1

Applicants

1
India
KIRLOSKAR OIL ENGINES LIMITED Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.

Inventors

5
India
Suhas SuryawanshiKirloskar Oil Engines Limited, Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.
India
Sabu NairKirloskar Oil Engines Limited, Laxmanrao Kirloskar Road, Khadki, Pune - 411003, Maharashtra, India.
India
Dr Yogesh Vishnu AghavGanga Bhagyoday, Sinhgad Road, Pune - 411 051, Maharashtra, India.; Nationality: Indian
India
Ajit Ashok KateJ-101, Park Express, I+J Co Hsg Society Ltd, Balewadi High Street, Pune - 411 045, Maharashtra, India.; Nationality: Indian,
India
Devangkumar Bharatkumar KansaraA-104, Silver Skies, Swathamali Mandir Road, Jadhavwadi, Chikhali, Pune - 411 062, Maharashtra, India.; Nationality: Indian.

Claims

6
1 An Optiprime Hybrid Generator System (100) comprising: atleast one renewable source (10) of power; atleast one fossil fuel driven generator (12); a control panel (14) with hybrid controller functionally connected to said renewable source (10) and said fuel driven generator (12), said control panel (14) is configured to integrate all components of the system (100) and to perform the function of power management; a battery bank (16) connected to said control panel (14) to provide power to the control panel (14) in case of unavailability of said renewable source (10) and said fossil fuel driven generator (12); an inverter (18) connected to said control panel (14); an auxiliary load (DC) (20) electrically connected to said control panel (14); and an auxiliary load (AC) (22) electrically connected to said invertor (18).
2 The Optiprime Hybrid Generator (100) system as claimed in claim 1, further comprises a Waste Heat Recovery System (WHRS) (24) connected to said fuel driven generator (12) and configured to recover heat energy from the hot flue gases of the fossil fuel generator (12) and utilize it for space heating.
3 The Optiprime Hybrid Generator System (100) as claimed in claim 2, wherein said Waste Heat Recovery System (WHRS) (24) consists of primary heat exchanger (204), Mild Steel (MS) water tank (202), primary side water circulation pump, three way modulating valve, air handling Unit (206) for space heating, secondary side water circulation pump, secondary heat exchanger (208), control panel and water level switch.
4 The Optiprime Hybrid Generator System (100) as claimed in claim 1, wherein said fossil fuel driven generator (12) operates either in solo or in synchronization operating mode depending upon load demand.
5 The Optiprime Hybrid Generator System(100) as claimed in claim 1, wherein said renewable source is selected from solar power or wind power or in combination as per source availability.
6 The Optiprime

Specification

Show full textCollapse

WE CLAIM: 1. An Optiprime Hybrid Generator System (100) comprising: atleast one renewable source (10) of power; atleast one fossil fuel driven generator (12); a control panel (14) with hybrid controller functionally connected to said renewable source (10) and said fuel driven generator (12), said control panel (14) is configured to integrate all components of the system (100) and to perform the function of power management; a battery bank (16) connected to said control panel (14) to provide power to the control panel (14) in case of unavailability of said renewable source (10) and said fossil fuel driven generator (12); an inverter (18) connected to said control panel (14); an auxiliary load (DC) (20) electrically connected to said control panel (14); and an auxiliary load (AC) (22) electrically connected to said invertor (18). 2. The Optiprime Hybrid Generator (100) system as claimed in claim 1, further comprises a Waste Heat Recovery System (WHRS) (24) connected to said fuel driven generator (12) and configured to recover heat energy from the hot flue gases of the fossil fuel generator (12) and utilize it for space heating. 3. The Optiprime Hybrid Generator System (100) as claimed in claim 2, wherein said Waste Heat Recovery System (WHRS) (24) consists of primary heat exchanger (204), Mild Steel (MS) water tank (202), primary side water circulation pump, three way modulating valve, air handling Unit (206) for space heating, secondary side water circulation pump, secondary heat exchanger (208), control panel and water level switch. 4. The Optiprime Hybrid Generator System (100) as claimed in claim 1, wherein said fossil fuel driven generator (12) operates either in solo or in synchronization operating mode depending upon load demand. 5. The Optiprime Hybrid Generator System(100) as claimed in claim 1, wherein said renewable source is selected from solar power or wind power or in combination as per source availability. 6. The Optiprime

Documents

Sign in to open
Application documents
1 202421011816-STATEMENT OF UNDERTAKING (FORM 3) [20-02-2024(online)].pdf 20 Feb 2024
2 202421011816-PROVISIONAL SPECIFICATION [20-02-2024(online)].pdf 20 Feb 2024
3 202421011816-POWER OF AUTHORITY [20-02-2024(online)].pdf 20 Feb 2024
4 202421011816-FORM 1 [20-02-2024(online)].pdf 20 Feb 2024
5 202421011816-DRAWINGS [20-02-2024(online)].pdf 20 Feb 2024
6 202421011816-Proof of Right [21-03-2024(online)].pdf 21 Mar 2024
7 202421011816-FORM 3 [21-03-2024(online)].pdf 21 Mar 2024
8 202421011816-ORIGINAL UR 6(1A) FORM 1-200624.pdf 26 Jun 2024
9 202421011816-FORM-5 [19-02-2025(online)].pdf 19 Feb 2025
10 202421011816-ENDORSEMENT BY INVENTORS [19-02-2025(online)].pdf 19 Feb 2025
11 202421011816-DRAWING [19-02-2025(online)].pdf 19 Feb 2025
12 202421011816-CORRESPONDENCE-OTHERS [19-02-2025(online)].pdf 19 Feb 2025
13 202421011816-COMPLETE SPECIFICATION [19-02-2025(online)].pdf 19 Feb 2025
14 202421011816-FORM 18 [04-03-2025(online)].pdf 04 Mar 2025
15 202421011816-Proof of Right [21-03-2025(online)].pdf 21 Mar 2025
16 202421011816-FORM 3 [21-03-2025(online)].pdf 21 Mar 2025
17 202421011816-Request Letter-Correspondence [07-04-2025(online)].pdf 07 Apr 2025
18 202421011816-Power of Attorney [07-04-2025(online)].pdf 07 Apr 2025
19 202421011816-Covering Letter [07-04-2025(online)].pdf 07 Apr 2025
20 Abstract.jpg 08 Apr 2025
21 202421011816-FORM-9 [11-04-2025(online)].pdf 11 Apr 2025
22 202421011816-FORM 18A [11-04-2025(online)].pdf 11 Apr 2025
23 202421011816-FER.pdf 27 Jun 2025
24 202421011816-POA [01-08-2025(online)].pdf 01 Aug 2025
25 202421011816-FORM-26 [01-08-2025(online)].pdf 01 Aug 2025
26 202421011816-FORM 13 [01-08-2025(online)].pdf 01 Aug 2025
27 202421011816-OTHERS [30-09-2025(online)].pdf 30 Sep 2025
28 202421011816-FER_SER_REPLY [30-09-2025(online)].pdf 30 Sep 2025
29 202421011816-DRAWING [30-09-2025(online)].pdf 30 Sep 2025
30 202421011816-CLAIMS [30-09-2025(online)].pdf 30 Sep 2025
31 202421011816-Proof of Right [24-11-2025(online)].pdf 24 Nov 2025
32 202421011816-FORM-8 [24-11-2025(online)].pdf 24 Nov 2025
33 202421011816-FORM-5 [24-11-2025(online)].pdf 24 Nov 2025
Search strategy
1202421011816_SearchStrategyNew_E_SearchStrategy202421011816E_25-06-2025.pdf