Sign In to Follow Application
View All Documents & Correspondence

A Communication Control Method And A Mobile Communication System

Abstract: A system and a method that allow for optimizing the use of transmission path resources are provided. A node on a core network, in accordance with a connection state of a terminal, releases a transmission path resource which is made unnecessary due to LIPA (Local IP access) or SIPTO (Selected IP traffic offload) connection configuration. Figure 2

Get Free WhatsApp Updates!
Notices, Deadlines & Correspondence

Patent Information

Application #
Filing Date
06 December 2019
Publication Number
50/2019
Publication Type
INA
Invention Field
COMMUNICATION
Status
Email
remfry-sagar@remfry.com
Parent Application
Patent Number
Legal Status
Grant Date
2025-01-16
Renewal Date

Applicants

NEC Corporation
7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan

Inventors

1. TAKANO, Yusuke
c/o NEC Corporation, 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan
2. TAMURA, Toshiyuki
c/o NEC Corporation, 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan

Claims

1. A communication control method of a mobile communication system for SIPTO (Selected IP Traffic Offload), the method comprising: releasing, by an MME (Mobility Management Entity), bearers in a first gateway for SIPTO using a second gateway by the MME sending a request to the first gateway; and sending, by the first gateway, a response to the MME.

2. A mobile communication system for SIPTO (Selected IP Traffic Offload), the system comprising: an MME (Mobility Management Entity); a first gateway; and a second gateway; wherein the MME releases bearers in the first gateway for the SIPTO using the second gateway by sending a request to the first gateway, and the first gateway sends a response to the MME.

3. A mobility management entity device used in a mobile communication system for SIPTO (Selected IP Traffic Offload), the device comprising: a unit that sends a request to a first gateway for releasing bearers in the first gateway for the SIPTO using a second gateway; and a unit that receives a response from the first gateway.

Specification

WE CLAIM:
1. A communication control method of a mobile communication system for SIPTO
(Selected IP Traffic Offload), the method comprising:
releasing, by an MME (Mobility Management Entity), bearers in a first gateway for SIPTO using a second gateway by the MME sending a request to the first gateway; and
sending, by the first gateway, a response to the MME.
2. A mobile communication system for SIPTO (Selected IP Traffic Offload), the
system comprising:
an MME (Mobility Management Entity); a first gateway; and a second gateway;
wherein the MME releases bearers in the first gateway for the SIPTO using the second gateway by sending a request to the first gateway, and the first gateway sends a response to the MME.
3. A mobility management entity device used in a mobile communication system
for SIPTO (Selected IP Traffic Offload), the device comprising:
a unit that sends a request to a first gateway for releasing bearers in the first gateway for the SIPTO using a second gateway; and
a unit that receives a response from the first gateway.

Documents

Application Documents

# Name Date
1 201948050454-TRANSLATIOIN OF PRIOIRTY DOCUMENTS ETC. [06-12-2019(online)].pdf 2019-12-06
2 201948050454-STATEMENT OF UNDERTAKING (FORM 3) [06-12-2019(online)].pdf 2019-12-06
3 201948050454-REQUEST FOR EXAMINATION (FORM-18) [06-12-2019(online)].pdf 2019-12-06
4 201948050454-PRIORITY DOCUMENTS [06-12-2019(online)].pdf 2019-12-06
5 201948050454-FORM-26 [06-12-2019(online)].pdf 2019-12-06
6 201948050454-FORM 18 [06-12-2019(online)].pdf 2019-12-06
7 201948050454-FORM 1 [06-12-2019(online)].pdf 2019-12-06
8 201948050454-DRAWINGS [06-12-2019(online)].pdf 2019-12-06
9 201948050454-DECLARATION OF INVENTORSHIP (FORM 5) [06-12-2019(online)].pdf 2019-12-06
10 201948050454-COMPLETE SPECIFICATION [06-12-2019(online)].pdf 2019-12-06
11 201948050454-CLAIMS UNDER RULE 1 (PROVISIO) OF RULE 20 [06-12-2019(online)].pdf 2019-12-06
12 Abstract 201948050454.jpg 2019-12-09
13 Correspondence by Agent_Form26_10-12-2019.pdf 2019-12-10
14 201948050454-PA [17-07-2020(online)].pdf 2020-07-17
15 201948050454-ASSIGNMENT DOCUMENTS [17-07-2020(online)].pdf 2020-07-17
16 201948050454-8(i)-Substitution-Change Of Applicant - Form 6 [17-07-2020(online)].pdf 2020-07-17
17 201948050454-RELEVANT DOCUMENTS [23-07-2020(online)].pdf 2020-07-23
18 201948050454-FORM 13 [23-07-2020(online)].pdf 2020-07-23
19 201948050454-AMENDED DOCUMENTS [23-07-2020(online)].pdf 2020-07-23
20 201948050454-Proof of Right [01-10-2020(online)].pdf 2020-10-01
21 201948050454-PETITION UNDER RULE 137 [01-10-2020(online)].pdf 2020-10-01
22 201948050454-OTHERS [07-10-2021(online)].pdf 2021-10-07
23 201948050454-FER_SER_REPLY [07-10-2021(online)].pdf 2021-10-07
24 201948050454-CORRESPONDENCE [07-10-2021(online)].pdf 2021-10-07
25 201948050454-CLAIMS [07-10-2021(online)].pdf 2021-10-07
26 201948050454-FER.pdf 2021-10-18
27 201948050454-PA [01-02-2023(online)].pdf 2023-02-01
28 201948050454-ASSIGNMENT DOCUMENTS [01-02-2023(online)].pdf 2023-02-01
29 201948050454-8(i)-Substitution-Change Of Applicant - Form 6 [01-02-2023(online)].pdf 2023-02-01
30 201948050454-Correspondence_Assignment, Power of Attorney_14-02-2023.pdf 2023-02-14
31 201948050454-US(14)-HearingNotice-(HearingDate-10-12-2024).pdf 2024-11-18
32 201948050454-Correspondence to notify the Controller [06-12-2024(online)].pdf 2024-12-06
33 201948050454-Written submissions and relevant documents [24-12-2024(online)].pdf 2024-12-24
34 201948050454-PatentCertificate16-01-2025.pdf 2025-01-16
35 201948050454-IntimationOfGrant16-01-2025.pdf 2025-01-16

Search Strategy

1 searchE_22-03-2021.pdf
2 npl2E_22-03-2021.pdf
3 npl1E_22-03-2021.pdf

ERegister / Renewals

3rd: 04 Feb 2025

From 17/09/2012 - To 17/09/2013

4th: 04 Feb 2025

From 17/09/2013 - To 17/09/2014

5th: 04 Feb 2025

From 17/09/2014 - To 17/09/2015

6th: 04 Feb 2025

From 17/09/2015 - To 17/09/2016

7th: 04 Feb 2025

From 17/09/2016 - To 17/09/2017

8th: 04 Feb 2025

From 17/09/2017 - To 17/09/2018

9th: 04 Feb 2025

From 17/09/2018 - To 17/09/2019

10th: 04 Feb 2025

From 17/09/2019 - To 17/09/2020

11th: 04 Feb 2025

From 17/09/2020 - To 17/09/2021

12th: 04 Feb 2025

From 17/09/2021 - To 17/09/2022

13th: 04 Feb 2025

From 17/09/2022 - To 17/09/2023

14th: 04 Feb 2025

From 17/09/2023 - To 17/09/2024

15th: 04 Feb 2025

From 17/09/2024 - To 17/09/2025

16th: 01 Aug 2025

From 17/09/2025 - To 17/09/2026