A Drilling For Configurating Root Holes On Root Blades

Bharat Heavy Electricals Limited
Granted App No 239/KOL/2005 Patent 237906 Mechanical Engineering

Patent information

IP India · live record
Application number
239/KOL/2005
Filing date
29 March 2005
Status
Granted
Legal status
Ceased
Publication number
52/2006
Publication type
—
Invention field
Mechanical Engineering
Patent number
237906
Grant date
12 January 2010
Next renewal due
29 March 2019Overdue

Abstract

This invention relates to a drilling device for configurating root holes on rotor blades, in particular pin-type rotor blades of turbines, comprising a drilling fixture (4') having a U-shaped clamp (5) for forming atleast one pin-hole (9) on a disc (4) of the rotor blade, the clamp (5) having atleast two concentric rings (6) disposed at both ends of ithe clamp; a plurality sets of stepped bushes (7) having outer diameters selected in correspondence with an internal diameter of the concentric rings (6), the internal diameters of said plurality set of stepped bushes (7) varying in incremental steps; a pin (3) insertable in the atleast one pin—hole (9). The internal diameter of each of the plurality sets of bushes (7) mounted on the atleast two rings (6) correspondingly matching the diameter of the pin-hole (9) under drilling.

Applicants

1
India
BHARAT HEAVY ELECTRICALS LIMITED REGIONAL OPERATIONS DIVISION (ROD), PLOT NO: 9/1, DJBLOCK 3RD FLOOR, KARUNAMOYEE, SALT LAKE CITY, KOLKATA-700091, HAVING ITS REGISTERED OFFICE AT BHEL HOUSE, SIRI FORT, NEW DELHI-110049, INDIA

Inventors

3
India
GUPTA GANPATILALAGM (STE/PSE/CDE), BHEL, BHOPAL
India
NIMJE ASHOK KASHINATHSR. DGM, STE, BHEL, BHOPAL
India
CARPENTAR BRAJ MOHANFOREMAN, STM, BHEL, BHOPAL

Specification

Show full textCollapse

FIELD OF INVENTION:- This invention relates to manual drilliiig of holes at the roots of pin-type turb'ms hhdds of turho-gdnerator s^ts during replacement of failed blades BACKGROUND OF INVENTIQN:- Turbo-generator (TG) sets generate electricity which is always in great demand. Therefore, failure of TG sets need to be rectified within the shortest period to ensure minimum generator loss. Failure of turbine blades is quite a common phenomena Majority of such failures are repaired at site itself to minimize the down time. The replacement job undertaken at site is predominantly manual. It is always executed under severe space constraints and constant pressure for the fastest complstioa of the job. The first casualty in such severs working conditions is the accuracy of the work, which again determines the frequency of future failures. DESCRIPTION OF PRIOR ARt;- As per existing prior art, pin-tj'pe blade replacement involves following manna! operations: i) Removal of the faulty blades after cutting open the covering ring called shroud and the fixing pins located in the disc; ii) Fitting of new blades in place of the faulty ones; iii) Centering the new blades in the exact location of the faulty blades, marking and removal of the new blades; iv) Drilling undersized holes in the new blades' root manually with drilling machines for fitting pins. This operation is done outside the turbine, on the markings on the roots; v) Reassembling the new blades on the turbine disc; vi) M^uaily drilling the holes on the blades' roots to enlarge the hole dimneter to the desired size in several small incremental steps; vii) Fitting the pins in finished holes to fmally fix the new blades in position and viii) Refixing tlie shroud. In the repair process described above, the major problems that come up are a) The manual drilling described under vi) ^ove often results in ttq)ered drill holes. After several such operttfions, the final dimneter of the drilled holes may turn out to be much beyond the designed and desired tolerance limits. This not only results in ill-fitting pins, at times this renders the whole turbine rotor unfit for repairs at site. In a typical example, a tolerance limit of 0.2mm was specified, but the manual drilling resulted in 1.0mm toler^ce i.e, 5 times the desired tolerance value. b) Secondly, due to the delicate nature of the manual operation, it becomes very slow. In a typical example, only 2 holes can be fmisb drilled in one single day. This has a great bearing on the down-time of the T-G set. OBJECTS OF THE EWENTIQNi- The invention described hereunder addresses both problems listed under a) and b) above. The blade root hole drilling fixture guides the drill accurately during manual drilling at site so that the finish drilled hole remains within the prescribed tolerance by ahnost totally eliminating taper in the drill holes. In typical example, a finished hole drilled with the help of the invented fbcture had a tolerance of 0.2mm i.e, the prescribed tolerance. Secondly, the speed of execution also goes up remarkably when the fixture is used. In an exajnple, the number of finished holes made with the help of this llxture went up from 1 per day to 10 per day.

SUMMARY OF THE INVENTION According to a first aspect of the invention there is provided a drilling device for configurating root holes on rotor blades* in particular pini-type rotor blades of turbine comprising: - a drilling fixture having a U-shaped clamp for forming at least one pin-hole on a disc of the rotor blade^) the the clamp having atleast two concentric rings disposed at both ends of the; clamp; - a plurality sets of stepped bushes having outer diameters selected in correspondence with an internal diameter of the concentric rings, the internal diameters of said plurality set of stepped bushes vary-ing incremental steps; - a pin insertable in the atleast one pin-hole» characterised in that the internal diameter of each of the plurality sets of bushes mounted on the atleast two rings correspondingly matching the diameter of the pin-hole under drilling. Further, according to a second aspect of the invention there is provided a method of manual drilling of root holes on rotor blades in a fixture as claimed in claim 1» comprising the steps of! - positioning the rotor blade in the disc having pin-holes; - placing the drilling fixture in an inverted u—position on the rotor blade) and snug-fitting atleast one pair of bush on the rings of the drilling fixture such that the bushes are aligned co-axially with the pin-hole; - carrying out atleast one manual drilling operation to configure a root-hole; on the rotor blade in which the atleast one pair of bush guiding the atleast one manual drilling operation to maintain coaxiality of the configurable rotor blade root-hole; repeating the manual drilling operation using additional pair of bushes having a. stepped incremental internal diameter to complete the' configuration of the root-holej and removing the following drilling fixture when the root-hole is configured. DESCRIPTION OF A PREFERRED EMBODIMENT OF THE INVENTION The invention will be described with the help of the following drawings;- Fig.l-shows the generation of taper drill holes in the blade roots when repaired as per prior art, i.e, without the help of the invented fixture. Fig.2- shows the elevation of the pin-type turbine blade m assembled condition.

fixture as per the present invention. Fig.4- shows the method of using the guide fixture as per the present invention while in use for drilling the root holes. Fig.l shows the formation of the error (taper) in the drilling operation, when the fixture as per the invention has not been used (prior art). Blade (1) is fitted in disc (4) and pin-hole (9) is drilled manually. The pin hole (9) has an original and a desired axis (10) which runs parallel to the turbine axis (not shown in drawing). Due to manual drilling, a taper axis (11) is created. The pin-type turbine rotor blades are normally operational in the turbine as depicted in Fig.2. The blade (1) has roots (2) protrudmg downwards which are placed in aileast one hole provided in the disc body (4). The pins (3) are fitted through the holes ninning parallel to the turbine axis to keep the blade in firm hold on the disc. When such a blade develops faults, for example developing cracks due to mechanical or thermal shocks, it fails and leads finally to the stoppage of the turbine and outage of the TG set. In order to bring the TG set back into generation with minimum down-time, replacement of such faulty blades is takeniup immediately at site. Fig.3 shows the invented fixture (4' ) for root hole drilling. The fixture consists of a V type clamp (5) having rings (6) fitted at both ends. The inner surface of both the rings are accui-ately machined and the rings are made perfectly concentric. They also must be coaxial when fixed Ito the U-cIamp. Several sets of stepped bushes (7) are manufactured separately. These bushes have their outer diameter just marginally less than the internal diameter of the rings so that any bush has a snug fit mside a ring. The internal diameter of the bushes vary in small incremental steps. These bushes (7), when fitted inside the rings, act as guides to the manual drill operations in small incremental steps. Fig.4 shows the fixture as per the invention in use. The fixture (4*) is fitted in "inverted u" position on to the disc (4), where the turbine blade (1) is already fitted. The two rings (6) of the fixture contain one bush (7) each, the internal diameter of the bushes being appropriate for the intended driiting operation. Fig.4 shows one pin (3) already fixed; in position after drilling operation carried out with the help of the fixture and the next pin-hole (9) being readied for driiling. WE CLAIMS 1. A drilling device for configurating root holes on rotor bladeS, in particular pin-type rotor blades of turbinees, comprising: a drilling fixture (4') having a U-shaped clamp (5) for forming atleast one pin-hole (9) on a disc (4) of the rotor blade, the clamp (5) having atleast two concentric rings (6) disposed at both ends of the clamp; - a plurality sets of stepped bushes (7) having outer diameters selected in correspondence with an internal diameter of the concentric rings (6), the internal diameters of said plurality set of stepped bushes (7) varying in incremental steps; - a pin (3) insertable in the atleast one pin-hole (9), characterized in that the internal diameter of each of the plurality sets of bushes (7) mounted on the atleast two rings (6) correspondingly matching the diameter of the pin-hole (9) under drilling. 2. A method of manual drilling of root holes on rotor blades in a fixture as claimed in claim 1, comprising the steps of s - positioning the rotor blade (1) in the diac (4) having pin-holes (9); - placing the drilling fixture (4') in an inverted u-position on the rotor blade (1), and snug-fitting atleast one pair of bush (7) on the rings (6) of the drilling fixturel (4') such that the bushes (7) are aligned co—axially with the pin—hole (9); - carrying out atleast-one manual drilling operation to configure a root-hole on the rotor blade (1) in which the atleast one pair of bush (7) guiding the atleast one manual drilling operation to maintain coaxiality of the configurable rotor blade root—hole, - repeating the manual drilling operation using addit-ional pair of bushes (7) having a stepped incremental internal diameter to complete the con-figuration of the root—holes and - removing the fallowing drilling fixture (4') when the root-hole is configured. 3. A drilling device for configurating root holes on turbine root blades as substantially herein described and illustrated with reference to the accompanying drawings.

This invention relates to a drilling device for configurating root holes on rotor blades, in particular pin-type rotor blades of turbines, comprising a drilling fixture (4') having a U-shaped clamp (5) for forming atleast one pin-hole (9) on a disc (4) of the rotor blade, the clamp (5) having atleast two concentric rings (6) disposed at both ends of ithe clamp; a plurality sets of stepped bushes (7) having outer diameters selected in correspondence with an internal diameter of the concentric rings (6), the internal diameters of said plurality set of stepped bushes (7) varying in incremental steps; a pin (3) insertable in the atleast one pin—hole (9). The internal diameter of each of the plurality sets of bushes (7) mounted on the atleast two rings (6) correspondingly matching the diameter of the pin-hole (9) under drilling.

Documents

Sign in to open
Application documents
1 239-kol-2005-granted-specification.pdf 06 Oct 2011
2 239-kol-2005-granted-reply to examination report.pdf 06 Oct 2011
3 239-kol-2005-granted-gpa.pdf 06 Oct 2011
4 239-kol-2005-granted-form 3.pdf 06 Oct 2011
5 239-kol-2005-granted-form 2.pdf 06 Oct 2011
6 239-kol-2005-granted-form 18.pdf 06 Oct 2011
7 239-kol-2005-granted-form 1.pdf 06 Oct 2011
8 239-kol-2005-granted-examination report.pdf 06 Oct 2011
9 239-kol-2005-granted-drawings.pdf 06 Oct 2011
10 239-kol-2005-granted-description (complete).pdf 06 Oct 2011
11 239-kol-2005-granted-correspondence.pdf 06 Oct 2011
12 239-kol-2005-granted-claims.pdf 06 Oct 2011
13 239-kol-2005-granted-abstract.pdf 06 Oct 2011
14 239-KOL-2005-FORM-27.pdf 06 Oct 2011
15 00239-kol-2005-form-3.pdf 06 Oct 2011
16 00239-kol-2005-form-2.pdf 06 Oct 2011
17 00239-kol-2005-form-18.pdf 06 Oct 2011
18 00239-kol-2005-form-1.pdf 06 Oct 2011
19 00239-kol-2005-drawings.pdf 06 Oct 2011
20 00239-kol-2005-description(complete).pdf 06 Oct 2011
21 00239-kol-2005-correspondence.pdf 06 Oct 2011
22 00239-kol-2005-correspondence-1.1.pdf 06 Oct 2011
23 00239-kol-2005-claims.pdf 06 Oct 2011
24 00239-kol-2005-abstract.pdf 06 Oct 2011
25 239-KOL-2005-FORM-27-1.pdf 16 Jul 2012
26 239-KOL-2005-(01-04-2015)-FORM-27.pdf 01 Apr 2015
27 239-KOL-2005-(28-03-2016)-FORM-27.pdf 28 Mar 2016
28 Other Patent Document [22-03-2017(online)].pdf 22 Mar 2017
29 Form 27 [30-03-2017(online)].pdf 30 Mar 2017
30 239-KOL-2005-RELEVANT DOCUMENTS [15-03-2018(online)].pdf 15 Mar 2018
31 239-KOL-2005-RELEVANT DOCUMENTS [23-03-2019(online)].pdf 23 Mar 2019
32 239-KOL-2005-12-01-2023-RELEVANT DOCUMENTS.pdf 12 Jan 2023

ERegister / renewals

Ceased
3rd Renewed 06 Apr 2010 Period 29 Mar 2007 – 29 Mar 2008 · CBR 2360 · Certificate 2146 ₹2,000
4th Renewed 06 Apr 2010 Period 29 Mar 2008 – 29 Mar 2009 · CBR 2360 · Certificate 2146 ₹2,000
5th Renewed 06 Apr 2010 Period 29 Mar 2009 – 29 Mar 2010 · CBR 2360 · Certificate 2146 ₹2,000
6th Renewed 06 Apr 2010 Period 29 Mar 2010 – 29 Mar 2011 · CBR 2360 · Certificate 2146 ₹2,000
7th Renewed 16 Mar 2011 Period 29 Mar 2011 – 29 Mar 2012 · CBR 1913 · Certificate 1644 ₹6,000
8th Renewed 13 Mar 2012 Period 29 Mar 2012 – 29 Mar 2013 · CBR 1878 · Certificate 1727 ₹6,000
9th Renewed 18 Mar 2013 Period 29 Mar 2013 – 29 Mar 2014 · CBR 2147 · Certificate 1854 ₹6,000
10th Renewed 13 May 2014 Period 29 Mar 2014 – 29 Mar 2015 · CBR 5408 · Certificate 3992 ₹13,200
11th Renewed 17 Mar 2015 Period 29 Mar 2015 – 29 Mar 2016 · CBR 3012 · Certificate 3251 ₹24,000
12th Renewed 17 Mar 2016 Period 29 Mar 2016 – 29 Mar 2017 · CBR 3741 · Certificate 3964 ₹24,000
13th Renewed 24 Mar 2017 Period 29 Mar 2017 – 29 Mar 2018 · CBR 8180 · Certificate 5084 ₹24,000
14th Renewed 02 Mar 2018 Period 29 Mar 2018 – 29 Mar 2019 · CBR 3794 · Certificate 4848 ₹24,000