A Method For Constructing Retaining Walls

Inventa International
Granted App No 482/MUM/2004 Patent 210506 Civil

Patent information

IP India · live record
Application number
482/MUM/2004
Filing date
23 April 2004
Status
Granted
Legal status
Term Expired
Publication number
0
Publication type
INA
Invention field
Civil
Patent number
210506
Grant date
05 October 2007
Next renewal due
23 April 2024Overdue

Abstract

A method for constructing a graviloft retaining wall comprising the steps of: constructing a base slab-cum levelling course (IE1FGH) comprising one of the ingredients cement concrete, rubble and masonary; constructing a retaining wall (ABCDEE1) in several parts, a first base slab-cum-levelling course; backfilling i.e.placement of earth behind the retaining wall and suitably compacting upto a level (KKI) constructing a second portion (SDKJ) of said retaining wall (ABCDEE1) in one or plurality of lift depending upon a height (DE) of said second portion (SDEE1) of the retaining wall, simultaneous placing of earth behind the retaining wall define clearly during construction of the parts of the retaining wall, at least upto a commencing level (SD) of construction of a loft (S1CMLDS); constructing the loft (S1CMLDS) at a level (SD) comprising reinforced concrete slab; constructing a remaining part (ABCS1) of the retaining wall (ABCDEE1) either in two instalments or in a single instament depending on the height of the remaining part of the retaining wall (ABCDEE1).

Applicants

1
India
INVENTA INTERNATIONAL 1137/10, PARVATI SADAN, REGE. PATH, OFF. FERGUSSION COLLEGE ROAD, SHIVAJINAGAR, PUNE-411006

Inventors

2
India
PHATAK DHANANJAYN RAMCHANDRA"SHREEYASH", LOKESH HOUSING SOCIETY, BIBWEWADI, PUNE-37
India
PATIL VIKAS SAHEBRAOFLAT NO. 16, NAVTARANG HOUSING SOCIETY, OPP. AAGAKHAN PALACE, PUNE-NAGAR ROAD, PUNE-411006

Claims

2
1 A method for constructing a graviloft retaining wall comprising the steps of: — constructing a base slab-cum levelling course (IE1F6H) comprising one of the ingredients cement concrete, rubble and masonry; — constructing a retaining wall (ABCDEE1) in several parts, a first part (JKEE1) constituting of ingredient identical to said base slab-cum-levelling course; — backfilling i.e. placement of earth behind the retaining wall and suitably compacting upto a level (KKI); — constructing a second portion of said retaining wall (ABCDEE1) in one or plurality of lift depending upon a height (DE) of said second portion (SDEE1) of the retaining wall, — simultaneous placing of earth behind the retaining wall during construction of the parts of the retaining wall, at least upto a commencing level (SD) of construction of a loft (S1CMLDS); ~ constructing the loft (S1CMLDS) at a level (SD) comprising reinforced concrete slab; — constructing a remaining part (ABCSI) of the retaining wall (ABCDEE1) either in two instalments or in a single instalment depending on the height of the remaining part of the retaining wall (ABCDEE1)
2 The method as claimed in claim 1, wherein the height of a remaining parti (ABCSI) of the retaining wall being managable in two instalments, the backfilling is done upto a level (QQ1) after the construction of PQCS1 of the remaining part (ABCS1), and wherein part (ABPQ) of the remaining part (ABCSI) a final of the retaining wall is constructed followed by additional backfilling and compacting upto a level ( BB1). Dated this 21st day APRIL, 2004 (I. BANERJEE) of L. S. DAVAR & CO Applicants' Agent

Specification

Show full textCollapse

FORM - 2 THE PATENTS ACT, 1970 (39 of 1970) PROVISIONT/COMPLETE SPECIFICATION SECTION 10 TITLE A METHOD FOR CONSTRUCTING RETAINING WALLS APPLICANT INVENTA INTERNATIONAL, of 1137/10, Parvati Sadan, Rege Path, Off. Fergussion College Road, Shivajinagar, Pune-411006, Maharashtra, India, Indian Company. The following specification particularly describes the nature of this invention and the manner in which it is to be performed

-1- FIELD OF INVENTION This invention relates to a method for constructing retaining walls. This invention further relates to a method for constructing gravity type retaining walls with lofts. BACKGROUND OF THE INVENTION Retaining walls are civil engineering structures required to support earth, loose stone and backfill and in the construction of bridges, abutments, cross drainage works and the like. The retaining walls known in the art may be categorized as gravity wall, reinforced concrete cantilever retaining walls, counter fort walls, buttress wall and reinforced earth wall. Gravity walls are generally made of plain concrete or masonry. The actuating force is the earth pressure exerted by the backfill, whereas the stabilizing force is the weight of the wall itself. The requirement of stability is that the resultant must be within the middle third zone of the base of wall. The condition of resultant being within the middle third zone is operative for any cross-section of the wall as well. This imperative condition assures that no tension is generated in the concrete/masonry that constitutes the bulk of the wall as also in the foundation. In addition the total weight of the wall should be such that the bearing capacity of the ground on which wall is erected is not exceeded and the base width should be such that the frictional resistance available between the base of the wall and the ground should be reasonably more than the earth thrust generated by the backfill. Thus there should be sufficient stabilizing force available against overturning and sliding and no bearing capacity failure of the foundation. Such walls are generally bulky and are not economical for heights above 1.4m. Further Gravity walls do not bend.

-2- Reinforced concrete walls generally have L or T shapes. For walls of such types the backfill exerts the earth pressure. The stability requirement for the base slab is again the same as gravity walls in the sense that the resultant of actuating force and stabilizing force should be within the middle third zone of the base-slab so that no tension is generated at the interface of the base-slab and the ground on which the wall stands. The stem of such walls deflects due to actuating earth pressure. The stem portion of such wall acts as cantilever and steel has to be provided in the stem or trunk portion of such wall in addition to foundation portion. Where there is a possibility of bending stress, steel has to be provided in such walls. The trunks of such walls are comparatively slim. The deflection that could be normally allowed for the stem of such walls is 1% of the height of the stem and considerable amount of steel as reinforcement is required for such walls. The thickness of base slab is also not fat and it also bends requiring steel reinforcement in that portion. In addition to the requirement of sufficient withstanding force against sliding at the base and no overshooting of bearing capacity at the interface between base slab and ground, the requirement of no tension at the interface between base-slab of wall and foundation also hold for such type of walls. Such walls are used for 3 to 8 m. height of retention. In the counterfort walls, stem and the slab are tied together by counterforts. A counterfort is a transverse wall spaced at intervals, which ties the stem and the base-slab. In this case the counterfort is a compression member whereas the stem spans continuously on counterforts. Here again steel has to be provided in the stem and counterforts to cater for tension and compression respectively. Reinforcement is also required in the base-slab. The requirements for the stability are same as for cantilever walls but due to the fact that stem spans continuously over counterforts, such walls can withstand larger heights of unsupported earth slopes. For heights of 8 to 12 meters counterfort retaining walls would be less costly than the cantilever retaining walls.

-3- Buttress walls are similar to the counterfort wall. In buttress wall, the buttresses are provided similar to counterforts but on the opposite side of retained material so that these acts as compression struts. The stem slab spans continuously over the buttress and steel is required in stem slab, buttress and base slab. The requirements of stability are the same. Therefore, these walls, either counterfort, cantilever or buttress require higher grade of concrete, steel cage erection, proper cover to steel and in general require better quality of supervision. The general principle of reinforced walls is that the actuating earth pressure on the stem of the retaining wall is resisted by a structural member embedded in the retained material and which goes under tension. The friction generated between earth fill and this member is necessary for the stability of such walls. The stem could be in panel form also. Reinforced earth wall cannot serve as load bearing walls.Further, they require specified machinery erection and the cost not cleam higher than the conventional retaining walls in addition to the requirements of suitable technical manpower. All these artifacts presuppose that backfilling is done after construction of the walls in part or whole and therefore proper compaction could pose a problem. In view of the shortcomings and costs involved in such walls, it was necessary to evolve retaining walls suitable for Indian conditions such that these walls are cost-effective, easy to construct could serve as load bearing members, would use conventional material, would not require higher technical skill, with ease of construction and saving in time, would not require later backfilling and long-lasting. Necessity is the mother of invention. OBJECTS OF THE INVENTION It is therefore an objection of this invention to provide retaining walls which are cost-effective and easy to construct.

-4- It is a further objection of this invention to provide retaining walls which can act as load-bearing members using conventional material. Another objection to this invention to provide retaining walls which do not require higher technical skill. Yet another objection to this invention to provide retaining walls which would not require later backfilling and are long-lasting. . These and other objection and advantages of the invention will be apparent from the ensuing description, when read in conjunction with the accompanying drawings where Figure 1 shows the overall picture of construction of a wall by graviloft technology. DESCRIPTION OF THE INVENTION According to this invention is provided a method for constructing graviloft retaining walls. According to this invention, and with reference to Figurel, base slab/course IE1FGH made of plain cement concrete/rubble/masonry is constructed. This portion which is of plain cement concrete may have nominal reinforcement of steel. The portion IE1FGH serves as base slab cum leveling course. On this leveling course the total retaining wall ABCDEE1 along with loft S1CMLDS is to be constructed. Now part of the retaining wall JKEE1 is constructed by traditional methods. This portion of retaining wall is constituted by plain cement concrete, masonry or plain cement concrete with over sized stones. After this construction the earth is backfilled and suitably compacted upto level KK1. The height of retaining wall DE if not more, instead of constructing the portion JKEE1, the complete portion SDEE1 could be constructed and the earth backfilled and

-5-compacted to the level DDL Therefore the portion of retaining wall SDEE1 could be constructed either in one lift or more than one lift depending upon the height of portion DE. If the height is more even more than two lifts could be arranged. However every time lift such as JKEE1 is constructed it should be backfilled by earth and earth suitably compacted. Therefore the construction of retaining wall and backfilling operations are going on simultaneously. These operations are therefore to be continued upto level of loft. When the retaining wall is constructed upfo level SO. The (oft S1CMLOS is constructed. The toft is reinforced concrete slab provided with reinforcing bars which are shown by dotted lines. After the loft has been formed the remaining portion of retaining' wall ABCS1 is to be constructed. If the height of ABCS1 is more this construction operation could be divided into two or more steps. For eg. if the height is such that it is manageable in two lifts as per engineering norms. In that case the retaining wall PQCS1 is first constructed and the backfilling is done upto level QQ1. The backfilling earth is compacted to engineering norms. Now the final lift of the retaining wall ABPQ is constructed and earth backfilled upto level BB1 and this earth/soil suitably compacted to engineering norms. This now leads to the complete retaining wall ABCMLDEFGHIE1A. The actuating force on this wall is lateral earth force generated by the earth of height BC and shown as (1) and lateral earth force generated for height DG that is the remainder height shown as 1'. The summation of lateral earth force (1+1') is less than the lateral earth force generated for the total wall height BG. Thus the main actuating force is considerably reduced, because of the provision of loft at proper location having predetermined length, breadth and embedded tension reinforcement. This reduction of actuating force has been confirmed by the inventors in laboratory as well as in the field. The stabilizing force is the weight of retaining wall and the weight of earth supported by the loft shown as (2)

generating counterbalancing moment, and the friction generated at the interface of the loft and backfill shown as <3>- The walls and the loft design is as per engineering norms, but the provision of loft reduced the section of the wall thereby achieving economy of construction over the walls mentioned The proposed technology has many merits over the tradionally constructed retaining walls. By tailoring the concept, without introducing any new material and without sacrificing the risk cost of construction. The new concept has analytical base and extensive experimental findings to shore the proposal. In fact inventors have already given concept designs for such walls to different reputed authorites for carrying out field trials and such walls are already constructed in the field testifying the validity of approach.There are incidental advantages in this concept such as saving in excavation due to reduced width, saving in shuttering due to reduced section, ease of construction, saving in time, adaptability for any increase height in future, light structure leading to even settlement and better resistant to

-7- WE CLAIM: 1. A method for constructing a graviloft retaining wall comprising the steps of: — constructing a base slab-cum levelling course (IE1F6H) comprising one of the ingredients cement concrete, rubble and masonry; — constructing a retaining wall (ABCDEE1) in several parts, a first part (JKEE1) constituting of ingredient identical to said base slab-cum-levelling course; — backfilling i.e. placement of earth behind the retaining wall and suitably compacting upto a level (KKI); — constructing a second portion of said retaining wall (ABCDEE1) in one or plurality of lift depending upon a height (DE) of said second portion (SDEE1) of the retaining wall, — simultaneous placing of earth behind the retaining wall during construction of the parts of the retaining wall, at least upto a commencing level (SD) of construction of a loft (S1CMLDS); ~ constructing the loft (S1CMLDS) at a level (SD) comprising reinforced concrete slab; — constructing a remaining part (ABCSI) of the retaining wall (ABCDEE1) either in two instalments or in a single instalment depending on the height of the remaining part of the retaining wall (ABCDEE1)

2. The method as claimed in claim 1, wherein the height of a remaining parti (ABCSI) of the retaining wall being managable in two instalments, the backfilling is done upto a level (QQ1) after the construction of PQCS1 of the remaining part (ABCS1), and wherein part (ABPQ) of the remaining part (ABCSI) a final of the retaining wall is constructed followed by additional backfilling and compacting upto a level ( BB1). Dated this 21st day APRIL, 2004 (I. BANERJEE) of L. S. DAVAR & CO Applicants' Agent

Documents

Sign in to open
Application documents
1 482-mum-2004-form 2(granted)-(25-08-2005).pdf 25 Aug 2005
2 482-mum-2004-form 2(granted)-(25-08-2005).doc 25 Aug 2005
3 482-MUM-2004-FORM-15-(23-09-2009).pdf 23 Sep 2009
4 482-MUM-2004-CORRESPONDENCE(IPO)-(23-12-2009).pdf 23 Dec 2009
5 482-MUM-2004-CORRESPONDENCE-(12-01-2010).pdf 12 Jan 2010
6 482-MUM-2004-CORRESPOUNDENCE-IPO-(16-02-2010).pdf 16 Feb 2010
7 482-MUM-2004-CORRESPONDENCE-(05-04-2011).pdf 05 Apr 2011
8 482-MUM-2004-CORRESPONDENCE(14-11-2011).pdf 14 Nov 2011
9 482-MUM-2004-CORRESPONDENCE(RENEWAL PAYMENT LETTER)-(11-05-2012).pdf 11 May 2012
10 482-MUM-2004-CORRESPONDENCE-12-03-2015.pdf 12 Mar 2015
11 210506-CORRESPONDENCE(23-11-2015).pdf 23 Nov 2015
12 482-MUM-2004-CORRESPONDENCE-(25-01-2016).pdf 25 Jan 2016
13 482-MUM-2004-CORRESPONDENCE(RENEWAL PAYMENT LETTER)-16-03-2017.pdf 16 Mar 2017
14 Revocation petition IPAB.pdf 09 Aug 2018
15 abstract 1.jpg 09 Aug 2018
16 482-mum-2004-petition under rule 138(9-3-2005).pdf 09 Aug 2018
17 482-MUM-2004-OTHER DOCUMENT(18-5-2015).pdf 09 Aug 2018
18 482-MUM-2004-OTHER DOCUMENT(15-6-2015).pdf 09 Aug 2018
19 482-MUM-2004-GENERAL POWER OF ATTORNEY(23-4-2015).pdf 09 Aug 2018
20 482-mum-2004-form 6(15-9-2006).pdf 09 Aug 2018
21 482-MUM-2004-FORM 4(8-4-2010).pdf 09 Aug 2018
22 482-mum-2004-form 3(23-4-2004).pdf 09 Aug 2018
23 482-mum-2004-form 26(7-1-2005).pdf 09 Aug 2018
24 482-MUM-2004-FORM 26(3-11-2010).pdf 09 Aug 2018
25 482-mum-2004-form 19(7-6-2004).pdf 09 Aug 2018
26 482-MUM-2004-FORM 16(3-11-2010).pdf 09 Aug 2018
27 482-MUM-2004-FORM 13(23-4-2015).pdf 09 Aug 2018
28 482-mum-2004-form 1(9-3-2005).pdf 09 Aug 2018
29 482-mum-2004-form 1(23-4-2004).pdf 09 Aug 2018
30 482-mum-2004-drawing(23-4-2004).pdf 09 Aug 2018
31 482-MUM-2004-DEED OF ASSIGNMENT(28-8-2006).pdf 09 Aug 2018
32 482-MUM-2004-CORRSPOUNDENCE (IPO) LETTER PATENT-1-11-2007.pdf 09 Aug 2018
33 482-MUM-2004-CORRESPOUNDENCE-(23-9-2009).pdf 09 Aug 2018
34 482-MUM-2004-CORRESPONDENCE(IPO)-(3-6-2015).pdf 09 Aug 2018
35 482-mum-2004-correspondence(ipo)-(24-8-2005).pdf 09 Aug 2018
36 482-MUM-2004-CORRESPONDENCE(8-4-2010).pdf 09 Aug 2018
37 482-MUM-2004-CORRESPONDENCE(7-5-2015).pdf 09 Aug 2018
38 482-MUM-2004-CORRESPONDENCE(3-11-2010).pdf 09 Aug 2018
39 482-MUM-2004-CORRESPONDENCE(23-4-2015).pdf 09 Aug 2018
40 482-MUM-2004-CORRESPONDENCE(18-5-2015).pdf 09 Aug 2018
41 482-MUM-2004-CORRESPONDENCE(15-6-2015).pdf 09 Aug 2018
42 482-mum-2004-correspondence(11-4-2008).pdf 09 Aug 2018
43 482-mum-2004-claims(granted)-(25-8-2005).pdf 09 Aug 2018
45 482-mum-2004-cancelled pages(25-8-2005).pdf 09 Aug 2018
46 482-MUM-2004-ASSIGNMENT(3-11-2010).pdf 09 Aug 2018
47 482-MUM-2004-ASSIGNMENT(18-5-2015).pdf 09 Aug 2018
48 482-MUM-2004-ASSIGNMENT(15-6-2015).pdf 09 Aug 2018
49 482-mum-2004-abstract(9-3-2005).pdf 09 Aug 2018
51 210506-Correspondence-210915.pdf 09 Aug 2018
52 210506-Correspondence-160915.pdf 09 Aug 2018
53 482-MUM-2004-HIGH COURT CASE CORRESPONDENCE.pdf 04 Oct 2018
54 482-MUM-2004-FORM 4 [11-06-2022(online)].pdf 11 Jun 2022

ERegister / renewals

Term Expired
3rd Renewed 07 Jan 2008 Period 23 Apr 2006 – 23 Apr 2007 · CBR 146 · Certificate 122 ₹2,000
4th Renewed 07 Jan 2008 Period 23 Apr 2007 – 23 Apr 2008 · CBR 146 · Certificate 122 ₹2,000
5th Renewed 12 Jan 2010 Period 23 Apr 2008 – 23 Apr 2009 · CBR 1315 · Certificate 203 ₹2,000
6th Renewed 12 Jan 2010 Period 23 Apr 2009 – 23 Apr 2010 · CBR 1315 · Certificate 203 ₹2,000
7th Renewed 08 Apr 2010 Period 23 Apr 2010 – 23 Apr 2011 · CBR 4842 · Certificate 2039 ₹6,000
8th Renewed 05 Apr 2011 Period 23 Apr 2011 – 23 Apr 2012 · CBR 4202 · Certificate 1945 ₹6,000
9th Renewed 14 Nov 2011 Period 23 Apr 2012 – 23 Apr 2013 · CBR 13339 · Certificate 5850 ₹6,000
10th Renewed 11 May 2012 Period 23 Apr 2013 – 23 Apr 2014 · CBR 6353 · Certificate 2621 ₹6,000
11th Renewed 05 Mar 2014 Period 23 Apr 2014 – 23 Apr 2015 · CBR 3021 · Certificate 1287 ₹24,000
12th Renewed 10 Feb 2015 Period 23 Apr 2015 – 23 Apr 2016 · CBR 1945 · Certificate 1038 ₹24,000
13th Renewed 16 Mar 2016 Period 23 Apr 2016 – 23 Apr 2017 · CBR 4629 · Certificate 2571 ₹24,000
14th Renewed 16 Mar 2017 Period 23 Apr 2017 – 23 Apr 2018 · CBR 6378 · Certificate 2946 ₹26,400
15th Renewed 20 Mar 2018 Period 23 Apr 2018 – 23 Apr 2019 · CBR 4951 · Certificate 3587 ₹24,000
16th Renewed 23 Mar 2019 Period 23 Apr 2019 – 23 Apr 2020 · CBR 6910 · Certificate 4879 ₹40,000
17th Renewed 05 May 2022 Period 23 Apr 2020 – 23 Apr 2021 · CBR 11649 · Certificate 12825 ₹40,000
18th Renewed 05 May 2022 Period 23 Apr 2021 – 23 Apr 2022 · CBR 11649 · Certificate 12826 ₹40,000
19th Renewed 11 Jun 2022 Period 23 Apr 2022 – 23 Apr 2023 · CBR 15052 · Certificate 16909 ₹40,000
20th Renewed 03 Apr 2023 Period 23 Apr 2023 – 23 Apr 2024 · CBR 18220 · Certificate 12821 ₹40,000